    Preliminary design of high power magnet converter for CRAFT

    2020-05-06 05:59:38ZhongmaWANG王重馬PengFU傅鵬LianshengHUANG黃連生ZhiquanSONG宋執(zhí)權XiuqingZHANG張秀青TianbaiDENG鄧天白TaoCHEN陳濤RonglinHUANG黃榮林ZhenshangWANG王振尚XiaojiaoCHEN陳曉嬌ShiyingHE何詩英ZejingWANG王澤京andGuanghongWANG王廣紅
    Plasma Science and Technology 2020年4期

    Zhongma WANG(王重馬),Peng FU(傅鵬),Liansheng HUANG(黃連生),Zhiquan SONG(宋執(zhí)權),Xiuqing ZHANG(張秀青),Tianbai DENG(鄧天白),Tao CHEN(陳濤),Ronglin HUANG(黃榮林),Zhenshang WANG(王振尚),Xiaojiao CHEN(陳曉嬌),Shiying HE(何詩英),Zejing WANG(王澤京) and Guanghong WANG(王廣紅)

    1 Institute of Plasma Physics,Chinese Academy of Sciences,Hefei 230031,People’s Republic of China

    2 University of Science and Technology of China,Hefei 230026,People’s Republic of China

    Abstract

    Keywords: CRAFT,converter,thyristor,fast fuse,snubber

    1.Introduction

    The Comprehensive Research Facility for Fusion Technology(CRAFT) project of China is proposed for further development of nuclear fusion.High-power converter module is the key equipment to provide controllable high direct current(DC) power supply for the superconducting load [1–4].Thyristors are paralleled with the minimum number to supply the rated output current and withstand the short circuit current limited by the junction temperature and fault thermal accumulation(I2t)[5–8].Therefore,thyristor type and the parallel number are necessary to be determined by steady and fault analysis.Fast fuse is used to protect the thyristor and remove the faulty branch during short circuit cases.Parameter determination of the fast fuse is finished after faulty analysis to verify protection reliability for thyristor.In order to decrease the over-voltage caused by the inductance of rectifier transformer and alternating current (AC) busbar during thyristor commutation,the snubber parameters consisting of resistor and capacitor are derived.Based on these purposes,the thyristor type and parallel number,the fast fuse type,and the snubber resistor and capacitor parameters are given in this paper.

    2.High power converter topology

    Figure 1.Power supply system topology for CRAFT.

    In order to test the superconducting magnet performance of CRAFT,a topology of power supply system is designed (as shown in figure 1).The power supply system is supported by a 110 kV substation with 110 kV busbar.The AC voltage is reduced from 110 kV to 200 V by the step-down and the rectifier transformer.The converter with a DC reactor and switch network unit (SNU) is used to supply the required current and voltage for the superconducting magnet load.The safety,reliability and stable working of converter have a close relationship with the superconductivity load.Depending on the design requirements,the no-load DC output voltage of the converter module is 250 V,and the rated DC output current is 25 kA.The maximum short-circuit current can reach hundreds of kilo-amperes.Compared with conventional highpower converters,both the structure and design parameters have higher technical challenges [9–11].Three-phase bridge rectifier circuit is used for the CRAFT converter because of the wide application and reliable technology.Because the rated voltage converter is low,the co-phase counter parallel connection structure is adopted for reducing the electromagnetic loss,as shown in figure 1.Many thyristors are paralleled in a converter bridge to supply rated current.Each thyristor has an external series fast fuse for short circuit protection and an external paralleled snubber for overvoltage protection.The thyristor,fast fuse and snubber are the key devices of the converter that parameters and types are needed to be determined [12–14].According to the design requirements,the thyristor junction temperature must be lower than 125°C and the thyristor thermal accumulation is lower than the allowable value during the downstream short circuit of DC reactor,the fast fuse must be melted during the bridge short circuit and must not be melt during the downstream short circuit of the DC reactor,the snubber consisting of resistor and capacitor is needed to reduce the commutation over-voltage to be lower than half max repetitive peak forward voltage of thyristor.

    3.Thyristor junction temperature and I2t analysis

    3.1.Thyristor type analysis and safe threshold determination

    Because the thyristor rated voltage (200 V) is very low,the verification parameter is mainly focused on the rated current.High power phase control thyristors mainly include the alloying type and free floating type.The allowable current for the alloying type thyristor is lower than that of the free floating type in the same voltage that will be needed more paralleled thyristors in a converter bridge.Although the minimum voltage (1400 V) of the alloying type thyristor is lower than that of the free floating type (1800 V),the latter one is still preferred due to the cost and volume of the fast fuse and snubber.Meanwhile,the current balance is a serious problem when many thyristors are paralleled to share the rated current together.The converter rated current and short circuit fault current in 100 ms are used to calculate the steady and transient parameters of the thyristor.Combined with steady-state current,surge current and size,the thyristor of 5STP 50Q1800 is selected.

    The safe threshold values of voltage and current determination(Kvsfand Kisf)are the first step of thyristor selection,which are calculated as follows:

    where the Vdrmrepresents the thyristor rated voltage,the Uv0represents the thyristor working voltage.The ITAVMrepresents the thyristor average on-state current,the Nprepresents the parallel number.The Kunbis the current unbalance coefficient of the paralleled thyristor caused by device and current path distance in the converter bridge.The IT(AV)represents the actual current in thyristor at rated state.Based on the above equations with considering the symmetry of the structure,six or more thyristors are selected for parallel analysis of each bridge arm.

    3.2.Steady junction temperature analysis

    It is necessary to calculate whether the junction temperature exceeds 125°C in steady state operation,so the parallel number can be determined preliminarily.If a thyristor is in a steady state operation,the average current ITAVcan be expressed as equation(3),the power loss PTcan be expressed as equation (4),and the junction temperature Tvjcan beexpressed as equation (5),

    Table 1.Calculated steady parameters of 5STP 50Q1800.

    where the Idnis the output current of converter,Npis the parallel number of thyristor,UT0and rtare the steady voltage and resistance of the thyristor.Tais the environmental temperature.Rthjcis the thermal resistance between thyristor junction and thyristor case,Rthchis the thermal resistance between thyristor case and heat sink,Rthhais the thermal resistance between heat sink and air.The steady junction temperature parameters are calculated as given in the table 1.

    3.3.Transient junction temperature analysis under short circuit

    The steady junction temperature is used as the initial temperature during the fault.Thyristor can be equivalent to thermal resistance and heat capacity modules,as shown in figure 2,which are utilized to calculate the transient-state junction temperature.Rthis the thermal resistance of the thyristor,Tvj0is the steady state junction temperature.Pthis the transient power of thyristor.

    The fourth-order model in figure 2 can be expressed as equation (6):

    If a thyristor conducts substantial over-current iTin a short time,transient power loss Pthcan be expressed as equation (7):

    The fault current waveform is obtained by PSCAD to calculate the thyristor junction temperature curve.The number of parallel connections is determined according to the principle that the thyristor junction temperature is lower than 125°C.Short circuits at the upstream and downstream of the DC reactor are analyzed when the trigger angle of the thyristor is set as 20°.The short circuit time is set at 1.15 s for 100 ms and short circuit waveforms are shown in figure 3.

    Figure 2.Thyristor thermal resistance and heat capacity model.

    It can be seen from figure 3 that the maximum current of upstream short circuit is 366.3 kA at 1.16 s and the upstream short circuit is 150 kA at 1.25 s.The fault junction and thermal effect of the upstream and downstream short circuit of DC reactor are shown in figures 4 and 5.When the upstream of DC reactor is short-circuited with 12 paralleled thyristor in a bridge,the steady case temperature Tvjis 60°C,and the maximum transient junction temperature is 120.2°C.When the downstream of DC reactor is short-circuited with six paralleled thyristor in a bridge,the steady case temperature Tvjis 73.8°C,and the maximum transient junction temperature is 118.0°C.

    Six 5STP 50Q1800 thyristors are needed in parallel that meets the requirements of both the voltage and current safety margins which are greater than 2.5.If the transient junction temperature is less than 125°C when the reactor front end is short-circuited,12 thyristors need to be connected in parallel,while only six thyristors need to be connected when the reactor back end is short-circuited.Considering the design cost and space footprint,six thyristors are required for the parallel operation.

    4.Fuse parameter determination and overload verification

    4.1.Determination of rated parameters

    The converter rated voltage on the AC side (200 V) is the rated voltage of fast fuse.The rated current of the fuse can be calculated by equation (8):

    where,IDCis the rated output current of converter(30 kA),Keis the cooling coefficient (0.95),Ktis the temperature coefficient (0.9),Kbis the safety margin factor (0.9).When Npis 6,the rated current of the fuse is no less than 4950 A.The fuse 4 URD 233 PLAF 5000 (400 V/5000 A) is selected based on the determination of rated parameters.

    4.2.Overvoltage verification

    When the fuse arc burns,it will produce an overvoltage that must be lower than the breakdown voltage of the thyristor to prevent the thyristor from being damaged.The relationship between arc voltage and the working voltage of the fuse is illustrated in figure 6.

    When the working voltage is 200 V,the arc voltage(925 V) is less than 1800 V,so the thyristor can fully withstand the arc overvoltage of the fuse.

    Figure 3.Fault current and effective value of (a) upstream short circuit and (b) downstream short circuit.

    Figure 4.(a) Thyristor junction temperature and (b) I2t of upstream short circuit at DC reactor 2 when Np = 12.

    Figure 5.(a) Thyristor junction temperature and (b) I2t of downstream short circuit at DC reactor when Np = 6.

    4.3.Overcurrent verification with I2t

    When the bridge arm is short-circuited,the fast fuse must be melted to remove the faulty branch.When the bridge arm is short-circuited,if one thyristor is short-circuited,other thyristors will not be switched on by default.At this time,the fault current will flow through the fault branch that is an important criteria for fast fuse analysis.Moreover,the front end of the DC reactor is directly connected with one phase of rectifying transformer,so a short circuit fault is used to simulate the short circuit in the simulation model.The starting time of failure is set at 1.15 s and lasted for 100 ms with a simulation wave shown in figure 7.

    Figure 6.Relationship between applied AC voltage and peak arc voltage of 4 URD 233 PLAF 5000.

    The first wave current peak value is 273.7 kA (10 ms),and the effective value is 234.9 kA (30 ms).The current effective value of the bridge fault simulation result and the time current curve of the fuse are compared in the same coordinate system,and the intersection point is the time prearc of the fast fuse,as shown in figure 8.It can be seen from figure 8 that the pre-arc time is 5.015 ms,the effective value of the pre-arc current is 55 390 A,and the pre-arc I2t is 15.38 MA2s.

    Figure 9 shows the relationship between the total I2t of the fuse action and the working voltage.Total fuse I2t is the energy used to measure the fuse melting process,which is positively correlated with the actual working voltage.It can be seen from figure 9(a) that when the working voltage is 200 V,the correction factor (K)is 0.58.At the rated voltage,the fuse I2t = 23.1 MA2s.Therefore,when U is 200 V,the total I2tfuse= 0.58 × 23.1 = 13.4 MA2s.Figure 9(b) indicates the relationship between the total operation I2t and the total operation time of the fast fuse,and the parenthesis is the pre-arc time.When the pre-arc time is 5.01 ms,the total action time is about 10 ms.The I2t of thyristor is 20.4 MA2s when t is 10 ms that is larger than the total action time of the fast fuse I2t (13.4 MA2s),and the thyristor can be effectively protected.Thyristor explosion I2t of thyristor is generally two to three times that of the permissible I2t,far more than the total I2t of fuse in the fast melting operation,so it can be ensured that the thyristor will not explode during the operation time.

    It can be seen that the calculated results satisfy the verification criterion with a certain margin.At this time,thyristor and fast fuse will not be damaged.Therefore,the fast fuse 4 URD 233 PLAF 5000 is finally selected for the CRAFT converter.

    5.Over voltage snubber analysis and design

    When the thyristor is turned off,the reverse recovery current between the anode and cathode with the inductive load will cause an overvoltage that may damage the thyristor.Although there is junction capacitance inside the thyristor,an external snubber consisting of resistor and capacitor is needed to reduce the overvoltage to a reasonable level.Both exponential and hyperbolic models can be used to analyze the recovery current,as shown in figure 10.Compared with the exponential model,the hyperbolic model is very complex and the parameters are difficult to determine.Therefore,the exponential model is more applicable to engineering practice.

    When t > t1,the reverse recovery current and peak value of rated voltage can be expressed by

    Figure 9.(a)Relationship between total operation I2t and the working voltage.(b)Relationship between the total operation I2t and the total operation time.

    Figure 10.Exponential model and hyperbolic model of reverse recovery current.

    where,V is the peak value of the thyristor rated voltage(278.5 V).Lsis the sum of transformer leakage inductance and AC busbar inductance; LT2is leakage inductance of rectifier transformer (1.55 μH); LL2is AC busbar inductance(2 μH).

    The curves of reverse recovery charge (Qrr) and peak value of reverse recovery current (Irr) are obtained from the data sheet shown in figure 11,which is obtained form ABB company online [15].The di/dt is 7.84 A μs-1calculated by equations (9)–(11),the Qrris nearly 7500 μAs and the Irris nearly 220 A obtained from figure 11.When six thyristors are connected in parallel,the total Irris 1320 A,the total Qrris 45 000 μAs.So the reverse recovery current of thyristor can be calculated.

    Figure 11.(a) Relationship between the Qrr and di/dt.(b)Relationship between the Irr and di/dt.

    We assume that the thyristor in bridge 1 is turned off when bridges 2 and 3 are turned on.In the case of commutation overvoltage,the thyristor reverse recovery current is considered as a controlled current source.The converter with snubber can be equivalent to a simple circuit as shown in figure 12

    Figure 12.Equivalent circuit of the converter with snubber during the bridge 1 turning off.

    where α is the control angle,μ is the commutation overlap angle.When α + μ = 90°,the commutation overvoltage is the most serious,and this value is adopted for calculation.Rsand Csare the resistor and capacitor of a single thyristor snubber.Reqand Ceqare the equivalent resistor and capacitor of the converter during the phase conversion process.

    The Ceqis set to10 μF,Reqis set to 2 Ω,the thyristor reverse overvoltage curve is shown in figure 13.At 9.6 μs,the maximum overvoltage is 687.5 V that fully meets the thyristor voltage range (1800 V).Therefore,snubber parameters can comply with the requirements.According to equation (12),the single thyristor snubber resistor R and capacitor C are 20 Ω and 1 μF,respectively.

    6.Conclusion

    Based on the fault analysis of the upstream and downstream short circuit of the DC reactor,5STP 50Q1800 thyristors are selected for the converter when the parallel number Npis six under the restriction of junction temperature and I2t.The fast fuse 4 URD 233 PLAF 5000 is selected to protect the thyristor and the pre-arc time of the fast fuse is determined,the voltage and current safety margins are verified by analyzing the short circuit of the bridge arm.In order to satisfy the thyristor commutation protection,thyristor reverse recovery current is deduced based on the analysis of multiple parallel snubber equivalent circuit.Each snubber resistor and capacitor are 20 Ω and 1 μF,respectively.This work finished the parameter analysis and type determination of main devices of CRAFT converter,which will be used for the subsequent structure and electromagnetic design.

    Figure 13.Reverse overvoltage curve of thyristor when Ceq is 10 μF and Req is 2 Ω.

    Acknowledgments

    This work was supported by the National Key R&D Program of China (No.2017YFE0300504) and Comprehensive Research Facility for Fusion Technology (No.2018-000052-73-01-001228).

    ORCID iDs

    欧美变态另类bdsm刘玥| 国产又色又爽无遮挡免| 在线观看一区二区三区激情| 丝袜喷水一区| 老师上课跳d突然被开到最大视频| 欧美极品一区二区三区四区| 国产精品国产三级国产专区5o| 韩国av在线不卡| 国产亚洲一区二区精品| 干丝袜人妻中文字幕| 麻豆精品久久久久久蜜桃| 少妇人妻精品综合一区二区| 欧美xxxx性猛交bbbb| 色婷婷久久久亚洲欧美| 精品一区二区三区视频在线| 午夜爱爱视频在线播放| 久久精品夜色国产| 亚洲精品第二区| 黄色视频在线播放观看不卡| 日韩 亚洲 欧美在线| 国产精品久久久久久精品电影小说 | 午夜精品国产一区二区电影 | 亚洲av中文字字幕乱码综合| 成年女人在线观看亚洲视频 | 97在线视频观看| 成人特级av手机在线观看| 国产高清国产精品国产三级 | 国产av国产精品国产| 免费观看性生交大片5| 免费观看无遮挡的男女| 精品久久久久久久末码| 一级毛片我不卡| 亚洲国产精品成人久久小说| 在线免费观看不下载黄p国产| 日本黄色片子视频| 中文字幕免费在线视频6| 亚洲图色成人| 99热这里只有是精品50| 成人一区二区视频在线观看| 国产精品国产av在线观看| 亚洲性久久影院| 天天一区二区日本电影三级| 久久鲁丝午夜福利片| 欧美最新免费一区二区三区| 你懂的网址亚洲精品在线观看| 国产成人精品久久久久久| 亚洲av欧美aⅴ国产| 男女啪啪激烈高潮av片| 久久99蜜桃精品久久| 日韩欧美精品v在线| 黄片无遮挡物在线观看| 精华霜和精华液先用哪个| 男女下面进入的视频免费午夜| www.色视频.com| 精品午夜福利在线看| 色哟哟·www| 99九九线精品视频在线观看视频| 免费观看性生交大片5| 成人无遮挡网站| 五月天丁香电影| 青春草国产在线视频| 蜜桃亚洲精品一区二区三区| 精品99又大又爽又粗少妇毛片| 成年av动漫网址| 国产亚洲av片在线观看秒播厂| 日韩视频在线欧美| 久久亚洲国产成人精品v| 成人免费观看视频高清| 精品熟女少妇av免费看| 日韩人妻高清精品专区| 黄片无遮挡物在线观看| 亚洲欧美成人综合另类久久久| 免费不卡的大黄色大毛片视频在线观看| 少妇的逼好多水| 校园人妻丝袜中文字幕| 国语对白做爰xxxⅹ性视频网站| 2021少妇久久久久久久久久久| 最近的中文字幕免费完整| 18禁动态无遮挡网站| 又爽又黄a免费视频| 成人综合一区亚洲| 欧美+日韩+精品| 国产男女超爽视频在线观看| 两个人的视频大全免费| 国产 一区精品| 99热网站在线观看| 色哟哟·www| av国产精品久久久久影院| 欧美zozozo另类| 亚洲国产色片| 建设人人有责人人尽责人人享有的 | 日韩大片免费观看网站| 激情五月婷婷亚洲| 卡戴珊不雅视频在线播放| 99久久精品国产国产毛片| 少妇熟女欧美另类| 日日啪夜夜爽| 可以在线观看毛片的网站| 搞女人的毛片| 精品国产一区二区三区久久久樱花 | 干丝袜人妻中文字幕| av线在线观看网站| a级一级毛片免费在线观看| 成人免费观看视频高清| 久久精品人妻少妇| 亚洲欧洲国产日韩| 有码 亚洲区| 69av精品久久久久久| 国产老妇伦熟女老妇高清| 特大巨黑吊av在线直播| 精品视频人人做人人爽| 免费看光身美女| 亚洲av日韩在线播放| eeuss影院久久| 亚洲国产欧美在线一区| 黄色怎么调成土黄色| 久久久色成人| 一级av片app| 天堂网av新在线| 国产毛片a区久久久久| 交换朋友夫妻互换小说| 中文欧美无线码| 各种免费的搞黄视频| 最近中文字幕高清免费大全6| 一本一本综合久久| 欧美日韩在线观看h| 一级毛片 在线播放| 国产精品爽爽va在线观看网站| 日日摸夜夜添夜夜爱| 好男人在线观看高清免费视频| 男人狂女人下面高潮的视频| 亚洲天堂国产精品一区在线| 成人午夜精彩视频在线观看| 久久久久国产网址| 1000部很黄的大片| 国内揄拍国产精品人妻在线| 色哟哟·www| 男男h啪啪无遮挡| 国产精品国产三级国产专区5o| 99热这里只有是精品50| 日韩,欧美,国产一区二区三区| 制服丝袜香蕉在线| 哪个播放器可以免费观看大片| 精品午夜福利在线看| 卡戴珊不雅视频在线播放| 少妇人妻精品综合一区二区| 最近最新中文字幕大全电影3| 精品少妇黑人巨大在线播放| 交换朋友夫妻互换小说| 亚洲欧美成人综合另类久久久| 国产高清国产精品国产三级 | 在现免费观看毛片| 亚洲美女搞黄在线观看| 亚洲欧美成人精品一区二区| 高清午夜精品一区二区三区| 欧美日韩视频精品一区| 日本猛色少妇xxxxx猛交久久| 欧美成人一区二区免费高清观看| 青春草国产在线视频| 男人添女人高潮全过程视频| 看十八女毛片水多多多| 汤姆久久久久久久影院中文字幕| 亚洲精品乱久久久久久| 欧美zozozo另类| 免费在线观看成人毛片| 精品久久久噜噜| 一个人看的www免费观看视频| 久久久亚洲精品成人影院| 97超视频在线观看视频| 91久久精品国产一区二区成人| 久久久久性生活片| 夜夜爽夜夜爽视频| 老司机影院毛片| 婷婷色综合大香蕉| 舔av片在线| 国产精品一区www在线观看| 涩涩av久久男人的天堂| 日韩国内少妇激情av| 永久免费av网站大全| 亚洲国产av新网站| 一级毛片久久久久久久久女| 亚洲成人久久爱视频| 日本一本二区三区精品| 国产黄片美女视频| 精品人妻视频免费看| 亚洲内射少妇av| 久久国内精品自在自线图片| 国产久久久一区二区三区| 国产伦在线观看视频一区| 两个人的视频大全免费| 亚洲av男天堂| 亚洲,一卡二卡三卡| 亚洲成人久久爱视频| 亚洲av成人精品一区久久| 成人免费观看视频高清| 国产真实伦视频高清在线观看| 男女边吃奶边做爰视频| 好男人在线观看高清免费视频| 亚洲美女搞黄在线观看| 免费看光身美女| 亚洲精品,欧美精品| 欧美另类一区| 成年人午夜在线观看视频| 极品少妇高潮喷水抽搐| 国产成人freesex在线| 国产黄频视频在线观看| 一级毛片电影观看| 老司机影院成人| 国产综合懂色| .国产精品久久| 国产一区二区在线观看日韩| 亚洲av一区综合| 国产中年淑女户外野战色| 亚洲丝袜综合中文字幕| 国产高清不卡午夜福利| 亚洲美女视频黄频| 亚洲aⅴ乱码一区二区在线播放| 韩国高清视频一区二区三区| 国产又色又爽无遮挡免| 亚洲精品国产色婷婷电影| 成人特级av手机在线观看| 99久久精品国产国产毛片| av在线app专区| 色综合色国产| av免费观看日本| 久久久精品欧美日韩精品| 日韩 亚洲 欧美在线| 欧美一级a爱片免费观看看| 精品国产露脸久久av麻豆| 亚洲欧洲国产日韩| 亚洲欧美日韩卡通动漫| 99热6这里只有精品| 亚洲av中文字字幕乱码综合| 中文天堂在线官网| 国产欧美另类精品又又久久亚洲欧美| 欧美日韩国产mv在线观看视频 | 老师上课跳d突然被开到最大视频| 夫妻性生交免费视频一级片| 视频区图区小说| 亚洲色图综合在线观看| 国产精品久久久久久精品古装| 午夜免费鲁丝| 少妇人妻精品综合一区二区| 久久久欧美国产精品| 国内少妇人妻偷人精品xxx网站| 日韩av免费高清视频| 好男人在线观看高清免费视频| 成人美女网站在线观看视频| 在线看a的网站| 大片电影免费在线观看免费| 日韩亚洲欧美综合| 国产成人a区在线观看| 制服丝袜香蕉在线| 啦啦啦在线观看免费高清www| 男插女下体视频免费在线播放| 国产亚洲av片在线观看秒播厂| 国产老妇女一区| 精品一区二区免费观看| 丰满少妇做爰视频| 乱码一卡2卡4卡精品| 亚洲国产高清在线一区二区三| 国产成年人精品一区二区| 久久久色成人| 成年女人在线观看亚洲视频 | 国产片特级美女逼逼视频| 成人美女网站在线观看视频| 成人毛片60女人毛片免费| 国产黄a三级三级三级人| 欧美xxxx性猛交bbbb| 免费av观看视频| 国产亚洲5aaaaa淫片| 超碰av人人做人人爽久久| 久热久热在线精品观看| 岛国毛片在线播放| 精品久久久久久电影网| 成人无遮挡网站| 男女那种视频在线观看| 夜夜看夜夜爽夜夜摸| 精品午夜福利在线看| 国产黄色视频一区二区在线观看| 人人妻人人看人人澡| 国产亚洲5aaaaa淫片| 校园人妻丝袜中文字幕| 国产爽快片一区二区三区| 国产精品一区二区在线观看99| 我的女老师完整版在线观看| 18禁裸乳无遮挡免费网站照片| 国产综合懂色| 人妻夜夜爽99麻豆av| 国产一区二区亚洲精品在线观看| 精品人妻熟女av久视频| 国产成人午夜福利电影在线观看| 中文欧美无线码| 免费观看无遮挡的男女| 精品亚洲乱码少妇综合久久| 你懂的网址亚洲精品在线观看| 国产亚洲91精品色在线| 熟女人妻精品中文字幕| 波多野结衣巨乳人妻| av在线观看视频网站免费| 国产黄片视频在线免费观看| 精品99又大又爽又粗少妇毛片| 99精国产麻豆久久婷婷| 大码成人一级视频| 国产精品99久久99久久久不卡 | 老女人水多毛片| 寂寞人妻少妇视频99o| 欧美国产精品一级二级三级 | av又黄又爽大尺度在线免费看| 日韩 亚洲 欧美在线| 高清视频免费观看一区二区| av国产免费在线观看| 亚洲高清免费不卡视频| 99久久人妻综合| 国产午夜福利久久久久久| 夫妻午夜视频| 色视频www国产| 成年版毛片免费区| 亚洲av免费在线观看| 久久精品夜色国产| 天天一区二区日本电影三级| 国内揄拍国产精品人妻在线| 久久国内精品自在自线图片| 成人欧美大片| 国产精品偷伦视频观看了| 91久久精品国产一区二区成人| 最近最新中文字幕大全电影3| av网站免费在线观看视频| 国产视频首页在线观看| 国产精品蜜桃在线观看| 亚洲成色77777| 亚洲av免费在线观看| 精品人妻熟女av久视频| 日日摸夜夜添夜夜添av毛片| av国产免费在线观看| 69av精品久久久久久| 国产精品麻豆人妻色哟哟久久| 日韩一本色道免费dvd| 免费观看性生交大片5| 97在线人人人人妻| 成人毛片a级毛片在线播放| 18禁在线播放成人免费| 久久精品国产亚洲av天美| 国产有黄有色有爽视频| 久久人人爽人人爽人人片va| 最近的中文字幕免费完整| 久久鲁丝午夜福利片| 各种免费的搞黄视频| 国产乱来视频区| 国产高清不卡午夜福利| 国产黄a三级三级三级人| 欧美丝袜亚洲另类| 人人妻人人澡人人爽人人夜夜| 国产黄a三级三级三级人| 国产精品蜜桃在线观看| 最近中文字幕2019免费版| 亚洲国产欧美在线一区| 性色av一级| 全区人妻精品视频| 国产精品精品国产色婷婷| 日日啪夜夜爽| 日韩av在线免费看完整版不卡| 亚洲国产精品成人综合色| 国产成人a区在线观看| 免费看a级黄色片| 王馨瑶露胸无遮挡在线观看| 在线观看一区二区三区激情| 久久99蜜桃精品久久| 午夜老司机福利剧场| 免费看不卡的av| 久久久成人免费电影| 少妇 在线观看| 一个人看的www免费观看视频| 色哟哟·www| 久久久久久久大尺度免费视频| 在线看a的网站| 日韩成人av中文字幕在线观看| 国产精品麻豆人妻色哟哟久久| 精品一区在线观看国产| 香蕉精品网在线| 麻豆久久精品国产亚洲av| 综合色丁香网| 日本一本二区三区精品| 久久99蜜桃精品久久| 婷婷色综合www| 日日摸夜夜添夜夜添av毛片| 亚洲美女视频黄频| 熟女人妻精品中文字幕| 亚洲色图av天堂| av一本久久久久| 别揉我奶头 嗯啊视频| 精品人妻偷拍中文字幕| 亚洲欧美日韩卡通动漫| 黄色欧美视频在线观看| 欧美日韩精品成人综合77777| 国产人妻一区二区三区在| 成人免费观看视频高清| 国产精品爽爽va在线观看网站| av在线app专区| 久久99蜜桃精品久久| 日本欧美国产在线视频| 人人妻人人爽人人添夜夜欢视频 | 免费黄色在线免费观看| 网址你懂的国产日韩在线| 精品久久国产蜜桃| av线在线观看网站| 蜜臀久久99精品久久宅男| 精品久久久精品久久久| 特级一级黄色大片| 中文精品一卡2卡3卡4更新| 亚洲精品456在线播放app| 亚洲电影在线观看av| 一级毛片久久久久久久久女| 国产色婷婷99| 最新中文字幕久久久久| 午夜激情福利司机影院| 欧美日韩一区二区视频在线观看视频在线 | 亚洲av电影在线观看一区二区三区 | av天堂中文字幕网| 中国国产av一级| 亚洲人成网站高清观看| 看非洲黑人一级黄片| 久久久久国产精品人妻一区二区| 最近中文字幕2019免费版| 色视频在线一区二区三区| 国产欧美日韩精品一区二区| 亚洲av男天堂| 亚洲精品456在线播放app| 国产永久视频网站| 美女内射精品一级片tv| 伦精品一区二区三区| 18禁裸乳无遮挡动漫免费视频 | 国产一区二区三区av在线| 国产老妇伦熟女老妇高清| 国产黄片美女视频| 久久人人爽av亚洲精品天堂 | 亚洲无线观看免费| 又粗又硬又长又爽又黄的视频| 99久久人妻综合| 亚洲成人精品中文字幕电影| 黄色视频在线播放观看不卡| 精品国产一区二区三区久久久樱花 | 夜夜看夜夜爽夜夜摸| 亚洲欧美日韩卡通动漫| 在线播放无遮挡| 午夜激情久久久久久久| 久久久久久久久久久丰满| 久久99蜜桃精品久久| 国产精品一区www在线观看| 99精国产麻豆久久婷婷| av国产精品久久久久影院| 国产黄色视频一区二区在线观看| 欧美+日韩+精品| 欧美国产精品一级二级三级 | 国产高清国产精品国产三级 | 日日摸夜夜添夜夜添av毛片| 精品午夜福利在线看| 蜜桃久久精品国产亚洲av| 2022亚洲国产成人精品| 久久久色成人| 欧美日韩综合久久久久久| 免费观看无遮挡的男女| 日韩在线高清观看一区二区三区| 啦啦啦在线观看免费高清www| 久久精品国产鲁丝片午夜精品| 国产一区二区三区av在线| 黄色视频在线播放观看不卡| 最近中文字幕2019免费版| 最近中文字幕高清免费大全6| 看黄色毛片网站| 在线观看三级黄色| 尤物成人国产欧美一区二区三区| 欧美日韩在线观看h| 一级黄片播放器| 22中文网久久字幕| 2021少妇久久久久久久久久久| .国产精品久久| av在线播放精品| 伦精品一区二区三区| 欧美另类一区| 男人添女人高潮全过程视频| 一本色道久久久久久精品综合| 国产久久久一区二区三区| 3wmmmm亚洲av在线观看| 美女高潮的动态| 亚洲精品亚洲一区二区| 人妻少妇偷人精品九色| 三级国产精品欧美在线观看| 禁无遮挡网站| 波野结衣二区三区在线| av在线播放精品| 国产探花极品一区二区| 深爱激情五月婷婷| 久久久欧美国产精品| 久久久久久久午夜电影| 欧美潮喷喷水| 国产黄a三级三级三级人| 午夜精品一区二区三区免费看| 99久久中文字幕三级久久日本| 国产在线一区二区三区精| 最新中文字幕久久久久| 中文字幕制服av| 黄片wwwwww| 特大巨黑吊av在线直播| 亚洲精品日韩av片在线观看| 干丝袜人妻中文字幕| 日本与韩国留学比较| 久久精品久久久久久久性| 亚洲av中文av极速乱| 欧美xxxx性猛交bbbb| 国产永久视频网站| 黄色视频在线播放观看不卡| 亚洲av欧美aⅴ国产| 国产美女午夜福利| 日韩一本色道免费dvd| 少妇 在线观看| 国产乱人视频| 久久久久国产精品人妻一区二区| 国产永久视频网站| 国产精品99久久99久久久不卡 | 大话2 男鬼变身卡| 2021少妇久久久久久久久久久| 夜夜看夜夜爽夜夜摸| 国产精品无大码| 少妇人妻精品综合一区二区| 91久久精品电影网| 黄色视频在线播放观看不卡| 欧美精品一区二区大全| 亚洲国产色片| 91久久精品电影网| 丝袜脚勾引网站| 91久久精品电影网| 下体分泌物呈黄色| 男的添女的下面高潮视频| 亚洲国产精品成人久久小说| 午夜福利网站1000一区二区三区| 国产淫片久久久久久久久| 亚洲欧美精品自产自拍| 好男人在线观看高清免费视频| 91久久精品电影网| 狂野欧美激情性bbbbbb| 亚洲精品久久久久久婷婷小说| 麻豆精品久久久久久蜜桃| av播播在线观看一区| 亚洲精品456在线播放app| 久久精品国产自在天天线| 亚洲不卡免费看| 美女国产视频在线观看| tube8黄色片| av又黄又爽大尺度在线免费看| 国产精品麻豆人妻色哟哟久久| 亚洲av福利一区| 美女被艹到高潮喷水动态| 亚洲精品国产色婷婷电影| av在线亚洲专区| av国产精品久久久久影院| 黄色日韩在线| 最后的刺客免费高清国语| av.在线天堂| 一本一本综合久久| 国内少妇人妻偷人精品xxx网站| 97精品久久久久久久久久精品| 自拍偷自拍亚洲精品老妇| 蜜桃亚洲精品一区二区三区| 欧美bdsm另类| 亚洲av在线观看美女高潮| 丰满人妻一区二区三区视频av| 亚洲三级黄色毛片| 国产亚洲最大av| 日韩国内少妇激情av| av卡一久久| 肉色欧美久久久久久久蜜桃 | 边亲边吃奶的免费视频| 亚洲精品第二区| 深夜a级毛片| 久久精品国产a三级三级三级| 亚洲一级一片aⅴ在线观看| 男女无遮挡免费网站观看| 狂野欧美激情性xxxx在线观看| 国产精品99久久久久久久久| 卡戴珊不雅视频在线播放| 你懂的网址亚洲精品在线观看| 久久久久精品性色| 自拍偷自拍亚洲精品老妇| 亚洲精品国产av蜜桃| 99热网站在线观看| 国产探花在线观看一区二区| 狂野欧美激情性xxxx在线观看| 国产一区二区三区综合在线观看 | 亚洲国产av新网站| 老女人水多毛片| 男女边吃奶边做爰视频| av在线亚洲专区| 欧美zozozo另类| 国产av码专区亚洲av| 精品人妻熟女av久视频| 男人舔奶头视频| 亚洲av不卡在线观看| av免费在线看不卡| 秋霞伦理黄片| 欧美性感艳星| 黄色日韩在线| 丝袜脚勾引网站| 少妇人妻一区二区三区视频| 别揉我奶头 嗯啊视频| 777米奇影视久久| 91精品一卡2卡3卡4卡| 国产免费视频播放在线视频| 你懂的网址亚洲精品在线观看| 狂野欧美激情性bbbbbb| 精品久久久久久久久亚洲| 真实男女啪啪啪动态图| 综合色av麻豆| 大香蕉久久网| 国产片特级美女逼逼视频|