    Monitoring result analyses of high slope of f ve-step ship lock in the Three Gorges Project

    2015-02-08 09:02:58QixiangFanHongbingZhuJunGeng

    Qixiang Fan,Hongbing Zhu,Jun Geng

    China Three Gorges Corporation,Beijing,100038,China

    Monitoring result analyses of high slope of f ve-step ship lock in the Three Gorges Project

    Qixiang Fan,Hongbing Zhu*,Jun Geng

    China Three Gorges Corporation,Beijing,100038,China

    A R T I C L E I N F O

    Article history:

    Received 19 January 2015

    Received in revised form

    2 February 2015

    Accepted 3 February 2015

    Available online 16 March 2015

    Three Gorges Project(TGP)

    Five-step ship lock

    Slope

    Monitoring analysis

    The construction of the double-lane f ve-step ship lock of the Three Gorges Project(TGP)was commenced in 1994,the excavation of the ship lock was completed by the end of 1999,and the ship lock was put in operation in June 2003.The side slopes of the ship lock are characterized by great height (170 m),steepness(70 m in height of upright slope),and great length(over 7000 m in total length).In association with the ship lock,the surrounding rocks in slope have a high potential to deform,with which the magnitude of deformation is restricted.Monitoring results show that the deformation of the f ve-step ship lock high slopes of the TGP primarily occurred in excavation period,and deformation tended to be stable and convergent during operation period,suggesting the allowable ranges of deformation.At present,the slopes and lock chambers are stable,and the ship lock works well under normal operation condition,enabling the social and economic bene f ts of the TGP.

    ?2015 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.All rights reserved.

    1.Introduction

    As one of the three most important structures of the Three Gorges Project(TGP),the ship lock is constructed by deep cutting and excavation in granite at the north of Tanziling on the left bank. The ship lock of the TGP consists of upstream and downstream approach channels,main lock chamber section,water conveyance system,and mountain drainage system.The total length of the ship lock is 6442 m,and the main section of the ship lock(chamber section)is 1621 m long.The high slopes are critical issues concerning the safe operation of the TGP.The maximum height of these slopes is 170 m,and the slopes higher than 120 m account for 460 m in length.Central rock piers with width of 54-57 m are placed in the double-lane lock chambers.Therefore,a bilateral doublegrooved slope is formed in the section of the main structure (Zhang,2001).The high slopes of the permanent ship lock are formed by deep cutting in the mountain side characterized by great height,complex topography,wide-spread range,complete stress relief,exhibiting marked unloading and heterogeneity characteristics.Thus the deformation and slope stability issues raise concerns for these slopes.As for the slopes of the permanent ship lock, the global and local stability problems of these slopes must be well addressed and the slopes deformation of these should be strictly controlled in order to satisfy normal operation of the miter gate of the ship lock(Fan,2004;Fan et al.,2011).The typical section and photo of the lock chamber of the double-lane f ve-step ship lock is shown in Figs.1 and 2,respectively.

    The f ve-step ship lock high slope ofthe TGP is a challenging issue not only in engineering geological investigation,mechanical properties and stability analysis of rock mass,and safety monitoring,but also in theories and methods for design of high slope,as well as construction safety.For such a large-scale project,no knowledge or practicalexperience is available.To solve the key issues encountered during construction,the following measures are taken:

    (1)Reasonable construction procedures are proposed to harmonize the relations between surface deformation and underground engineering in association with deep excavation and anchoring support.

    (2)The one-step complete excavation method of upright slope meets the technical requirements of the excavation.

    (3)Using the integrated control blasting technology,the impact of groove excavation blasting is kept in the allowable range of design,satisfying the requirements of engineering rock quality and construction progress.

    (4)The fore shaft support technology is utilized to control the deformation and collapse of rocks at the top of upright slopes for the purpose of slope stability and construction safety during construction period(and excavation period).

    (5)The major indexes for estimating the stability of side wall rocks are determined to deal with the relation between the curing time of concrete lining and controlled blasting.

    Fig.1.Typical pro f le of the high slope of the double-lane f ve-step ship lock of the TGP.

    These procedures are carefully proposed based on long-term scienti f c research.During design and construction stages of the TGP,the construction procedures and methods were adjusted and optimized continuously by f eld experimental investigation,accumulated experience during construction practices,and the integrated application of multi-discipline methods including engineering geological survey,rock mechanics test,numerical simulation,controlled blasting of engineering excavation,anchoring, and back analysis of the monitoring data.The design and construction techniques are considered to be ground-breaking in termsof large slope excavation gradient,novel geological survey method and technology,evaluation theory and method for rock mechanics property and seepage characteristics.The safety monitoring and feedback method,in terms of the dynamic design concept and method of super-high slope associated with other methods,is applicable to deep excavation of high rock slope.By the end of 1999, a high and steep slope with complex structure was completed after excavation,and the rock stability of the high slope was effectively controlled after anchoring measures used,indicating that the ship lock excavation of the TGP was successful.

    Fig.2.Photo of the high slope of the double-lane f ve-step ship lock of the TGP.

    In this paper,the deformations of the high slope of the TGP ship lock recorded during construction and operation periods were analyzed.It is shown that the deformation of the slope occurred mainly in construction period,and was kept stable in operation period.The deformations of side wall and the stresses of highstrength rock bolts are well controlled.

    2.Analysis of monitored deformation of high slope of the TGP ship lock

    Construction of the TGP ship lock began in April 1994.The excavation of lock chamber was basically completed in April 1999. By the end of December 2014,the slope of the ship lock remained stable for more than 14 years.In order to evaluate the high slope stability and the operation safety of the ship lock,nearly 1000 monitoring devices were laid out in various locations of the slope. To date,90%of the monitoring devices work well.

    2.1.Monitoring results of the TGP ship lock slope

    Since the completion of ship lock excavation in April 1999,the boundary conditions that in f uence the slope deformation magnitude have been basically identi f ed.Based on the measured results, the displacement after April 1999 kept nearly constant,with minor f uctuations.The variations of these measured values are mainly triggered by errors recorded in data observation,showing no obvious relations with temperature.

    2.1.1.Top of central piers

    The deformation of the central piers of the ship lock consists of the rebound deformation due to unloading during stress relief and the deformation induced by deadweight during the construction of the upright slopes.During excavation,stress relief happened in three directions of the central piers,namely,left and right sides, and the top.While at the lock head,stresses are released not only in the three directions but also in the free face downstream.Meanwhile,the geological condition and initial in-situ stress state vary at different parts of central piers.All of these factors contribute to the complicated deforming behaviors of the central piers.Typical deformation curves of central piers are shown in Fig.3.

    It can be seen form Fig.3 that there are signi f cant differences in magnitude and direction of displacement along the direction of lock chamber at different parts of the central piers.Most of the monitoring points at the south of the central piers deform towards south and the ones at the north towards north.Between the second and third lock heads,the direction of displacement at some parts of the central piers is the same.In December 2014,the measured displacements of the central piers towards the lock chamber were-19.49 to 33.59 mm and-5.89 to 23.76 mm at the north and south,respectively.

    In December 2014,the displacements of the central pier top measured downstream were-1.87 to 26.57 mm and-4.98 to 22.67 mm at the north and south,respectively.The measuring point TP119GP01,situated on the 160 m platform at the horizontal slope top of the third lock head,showed a maximum downstream displacement,which was primarily induced by unloading of the upright slope.

    The vertical displacement on the top of the central pier was mainly presented in form of settlement recorded in December 2014,with the measured values of-5.80 mm(rebound)to 15.27 mm(settlement).

    In order to analyze the convergence of surface deformation on the top of the central pier and to reduce the impact of observation errors,average annual values of the displacement towards the lock chamber were selected for comparison purpose(see Table 1).It can be observed from Table 1 that the annual average and the longterm average annual displacements(from 2000 to 2014)of the central pier top towards the lock chamber varied between ±1.5 mm,indicating that the central pier stays stable and the deformation of the central pier quickly converges after excavation.

    2.1.2.South and north high slopes

    The south and north slopes mainly deform towards the chamber (the direction of free face),with the horizontal displacement towards the lock chamber much greater than the horizontal and vertical displacements along the direction of water f ow.The typical deformation curves of the south slope are shown in Fig.4.

    The horizontal displacements of the north and south slopes towards the lock chamber slightly decrease with reduced elevation. By April 1999 when excavation was completed,the displacements of the north and south slopes towards the lock chamber were 9-39 mm and 4-53 mm,respectively;and the displacements of the slopes top towards the lock chamber were 11-27 mm and 4-35 mm,respectively.After that the displacements of the slopes increased slightly.By December 2014,the maximum displacements of the south and north slopes towards the lock chamber were74.27 mm and 58.82 mm,respectively.For the south slope,the maximum displacement was recorded at the measuring point TP41GP02 at elevation 185 m of the stake 15+930.The maximum displacements of north and south upright slopes top were 35.09 mm and 47.22 mm,respectively.

    Fig.3.Displacement of the measuring point TPBM68GP01 at elevation 160 m at the north of central pier top.

    The downstream displacements of the north and south slopes were small.The measured displacements in December 2014 were-2.53 to 33.96 mm,with the maximum value observed at the measuring point TP42GP02 at elevation 200 m bench on the south slope.This measuring point was situated at the corner of the broadened section of the vertical shaft,and its displacement was mainly triggered by unloaded downstream free face.

    The vertical displacement of north and south slopes was mainly in the form of settlement that was within 17 mm.The settlement roughly occurred during excavation.After completion of excavation,the displacement varied within a slight magnitude,and its increment was reduced with elapsed time and f nally tended to converge.

    The trend of displacement measured at each measuring point was different due to the differences in completion sequence of slopes,rock geological conditions and excavation state,as well as the effect of anchoring methods.By the end of December 2014,the displacement values of north and south slopes ranged between 0.57 mm and-20.86 mm,averaging 9.65 mm.The displacement increment in December of each year(from 1999 to 2014)decreased year after year,indicating that the deformation was convergent,as shown in Figs.5 and 6.Regression analysis was conducted for the displacement and the f tting curves can be expressed as follows:

    Table 1Annual average values of the horizontal displacement at the central pier top towards the lock chamber.

    wheretis the time(from April 1999);a,b,Kandmare the f tting parameters.For each measuring point,these four f tting parameters are different.

    According to the monitoring results,the deformation of slope was mainly induced by excavation.Most of the deformation was observed during excavation,and increased with increasing excavation depth.The deformation rate measured after excavation decreased.At present,the deformation of slopes has converted to a stable value,and the slopes are stable in a global sense.It is indicated that reservoir impoundment and navigation through the ship lock have no obvious effect on the deformation of north and south high slopes.

    The measured surface deformation was primarily in the direction towards the lock chamber.The convergence of the surface deformation rates of the north and south upright slopes were the fastest.Most of measuring points on the north and south slopes exhibited a fast convergence velocity of deformation,except for a few measuring points on the top.In view of rock lithology,the deformation rate of the measuring points in fresh and weakly weathered rocks converged faster,except for several measuring points characterized with a slow convergence velocity in the strongly weathered rocks on the top of north and south slopes.The relative deformations of the blocks measured in unloading zones of the upright slope have remained constant since completion of slope excavation and supporting in 1999,which indicates that the upright slope is stable.

    2.2.Deformations of lock head and side wall

    Normal and inverted plumb lines were deployed at each lock head to monitor the horizontal displacement of the lock head;and tension wire alignment was laid out in the pipeline gallery on the top of lift walls on the north and south slopes of all lock chambers to monitor the horizontal displacement of lift walls.Speci f cally,the vertical lines of the 1st and 5th lock heads were set in the 3rd block of the lock heads;and the vertical lines of the 2nd,3rd,4th,and 6th lock heads were set in the 2nd block of these lock heads.Theanchorage point of foundation plumb line holes of each lock head is roughly 42-63 m below the f oor elevation of the foundation gallery.

    Fig.4.Displacement of the measuring point TPBM94GP02 at elevation 168 m bench of the south slope.

    2.2.1.Lock head and gate pier

    The normal and inverted plumb lines at each lock head subsequently began to work between September 2001 and August 2002. By the end of December 2014,the measured deformation at lock heads is shown in Table 2,and the typical curves are shown in Fig.7.

    Table 2 and Fig.7 show that the displacement at the bottom of the lock head is smaller,with the value of-1.5 to 1.5 mm.The displacement at lock head top is-0.83 to 7.27 mm towards the lock chamber,and-3.93 to 7.71 mm towards the downstream direction. The deformation of the lock head does not affect the opening of the miter gate of the ship lock.In contrast,the measured deformations of the 5th and 6th lock heads are slightly greater and change periodically with temperature.This is mainly associated with the characteristic of mixed structure of abutment piers.The annual variation of displacement towards the lock chamber,induced by change of temperature,is approximately within 2 mm.Reservoir impoundment and lock f lling and discharge have a slight effect on the displacement of lock head top.

    Fig.5.Trend value of displacement at elevation 139 m on the top of north upright slope at the stake 15+787.

    Fig.6.Trend value of displacement at elevation 155 m on the top of south upright slope at the stake 15+770.

    2.2.2.Lock chamber side wall

    Table 3 shows the measured horizontal displacement,towards the lock chamber,of pipeline gallery in the south and north slopes by December 2014.It is shown that the values of the horizontal displacement change between-1.46 mm and 7.45 mm.The displacements of the 4th and 5th lock chambers are relatively large due to the gravity structure of the upper chambers.The displacement does not increase with elapsed time.

    General speaking,the changes in the horizontal displacement of foundation at the lock head,and the displacement of lock head top towards the lock chamber,upstream and downstream are minor. The vertical displacement of foundation of the north and south lines varies within±1 mm before and after impoundment each year.It is shown that a minor effect of impoundment on foundation deformation is observed.

    3.Monitoring of anchorage force of the TGP ship lock slope

    In order to enhance the stability of high slopes of the TGP ship lock,improve the stress state of slope rock,and prevent unloading excavation and development of cracks,a total of 230 sets of 1000-kN end anchor cables,666 of 3000-kN end anchor cables,and 1271of 3000-kN two-ended anchor cables were utilized to reinforce the slopes.In addition,a great number of blocks that have the potential of instability were encountered during excavation of the stage II at the upright slope of the ship lock.To enhance the stability of these blocks,1309 sets of 3000-kN end anchor cables and 528 of 3000-kN two-ended anchor cables were arranged(Fig.8).

    Table 2Range of measured displacement values on the top of each lock head(unit:mm).

    Fig.7.Correlation curves of horizontal displacement on the top of lock head I.

    Table 3Measured horizontal displacement of pipeline gallery on north and south slopes (towards the lock chamber).

    3.1.Prestress of anchor cables

    One hundred and f fteen anchor cable dynamometers were deployed to observe the long-term prestress state of anchor cables,of which two are bonded anchor cables,and others are unbonded cables.The statistics of prestress loss ratio after anchor cable lock-in is shown in Table 4,and typical process curves are shown in Fig.9.

    As can be seen from Table 4 and Fig.9,the measured prestress loss after anchor cable lock-in is-0.6%to 6.4%,averaging 2.8%.It was roughly 12.61%in average in December 2014.The change in anchor cable prestress loss is in agreement with the general rules of stress loss obtained in other cases.After one year of installation of the anchor cables,the average prestress loss after cable lock-in was 8%, most of the anchor cables being within 5%.Two years later,the prestress change was slight and almost kept constant,and an annual change of prestress due to the minor effect of temperature can be observed.

    Fig.8.Photo of anchor cables laid out at the high slope of double-lane f ve-step ship lock.

    There was a slight difference between the magnitude of prestress loss of the anchor cable on the blocks and non-block parts,and the prestress loss matched with its change rule.Takingthe block f1239 for example,its average prestress loss rate was about 7.2%after lock-in for one year,while the average prestress loss rate measured by other dynamometers at the south slope was around 7.6%one year after lock-in.Reservoir impoundment and ship lock navigation have no obvious impact on the anchorage force of the anchor cables,and no dramatic change has been observed in anchor cable prestress.This confrms that all slopes are stable.

    Table 4Measured prestress loss ratio of anchor cable by dynamometers.

    Fig.9.Process curves of prestress loss after lock-in of 3000-kN anchor cable at the south slope.

    3.2.Stress of high-strength anchor bolt

    The main part of the TGP ship lock is located within the deeply cut rock tank at the left side of Tanziling.The walls of the ship lock are of thin reinforced concrete lining structure combined with mixed(gravity+lining)structures.The lining structure bears loads associated with bed rocks behind the walls so as to meet the requirements of structural stability in terms of strength.At the same time,string stress gages were amounted on the free segment of the anchor bolt at interface of lining and bed rock to observe the stress of high-strength anchor bolt.

    The measured stresses of high-strength anchor bolt at the lock head I are shown in Table 5,and time-history curves of anchor bolt stressareshowninFig.10.AscanbeseenfromTable5andFig.10,the stress measured by 48 stress gages was within 315 MPa in December 2014.The maximum tensile stress recorded by the stress gages was within150MPa,except threestressgages,i.e.R4CZ21(EL.165.8mon the north slope of the 2nd lock chamber),R8CZ31(EL.152.03 m on thenorth slopeof the3rdlockchamber),andR1CZS53(EL.56.5mon the south slope of the 5th lock chamber),which had a maximum tensile stress of more than 200 MPa.In presence of the navigation of the ship lock in 2003,flling and discharge of lock chamber had a slight impact on variation of anchor bolt stress.On the whole,the measured stresses of anchorboltare generallysmalland farlessthan the design values of anchor bolts,which indicates that the lining structure of the ship lock is stable.

    Table 5Stress of high-strength anchor bolt on 15+060 section of lock head I.

    Fig.10.Stress of high-strength anchor bolt on the north slope of lock head I(R2-4CZ11).

    4.Conclusions

    Up to December 2014,the TGP ship lock had beenputin operation for over 10 years and experienced a 5-year reservoir impoundment testing.The monitoring results show that the slopes of the ship lock are stable,and the deformation of lock head and lift wall and the stress of high-strength anchor bolts are all within the allowable range.Reservoir impoundment has no signi f cant effect on the deformation of the ship lock,and the variations in deformation and stress at various key positions after monitoring are normal.The high slopes and ship lock are basically in a stable state and the upstream and downstream channels and linkage sections enjoy good shipping capability,suggesting the ef f cient operation of the TGP ship lock.

    Con f ict of interest

    The authors wish to con f rm that there are no known con f icts of interest associated with this publication and there has been no signi f cant f nancial support for this work that could have in f uenced its outcome.

    Dai Huichao.Research on rock mechanics problems of division pier of the Three Gorges permanent shiplock.Chinese Journal of Rock Mechanics and Engineering 2001;20(5):680-4(in Chinese).

    Fan Qixiang.Key technical issues of TGP permanent shiplock.Engineering Science 2004;6(1):48-52(in Chinese).

    Fan Qixiang,Zhu Hongbing,Chen Xuchun.Key rock mechanics issues related to the Three Gorges Project in China.Journal of Rock Mechanics and Geotechnical Engineering 2011;3(4):329-42.

    Zhang Chaoran.Practice and experimental veri f cation of TGP’s permanent shiplock slope.Engineering Science 2001;3(5):22-7(in Chinese).

    Dr.Qixiang Fangraduated from Gezhouba Institute of Hydro Electric Engineering with a B.S.in 1984,and obtained M.S.and Ph.D.from Tsinghua University in 1999 and 2010,respectively.He held several positions in the China Three Gorges(CTG)Project Preparatory Of f ce, including associate engineer in the Division of Technology in the Department of Construction Technology,project supervising engineer and leader of the supervision team of the Liyuan Project and later the Deputy Director of the Construction Division of the Liyuan Company.He served in CTG’s Construction Department as Deputy Director of the Division of General Management and later as the Director of the department,Director of the Division of Temporary Ship Lock Project and later the Director of the Division of Temporary Ship Lock and Ship Lift under the Left Bank Construction Department of the Three Gorges Project,the Deputy Director and later the Director of the Navigation Construction Department and Deputy Director of Management Department of Beijing National Aquatics Center(known as the Water Cube).He now is Executive Vice President of the CTG and is in charge of the construction of CTG’s Jinsha River hydropower projects.Dr.Fan is well experienced in management of large-scale complex hydropower projects,design,installation and testing of complex centralized control system,stability of high slopes,construction and installation of large-scale metal structures and structural concrete,etc.He has published over 80 papers.He has participated in the construction of several large-scale hydropower projects successively and made outstanding contribution to the construction and management of the TGP.

    *Corresponding author.Tel.:+86 10 57081690.

    E-mail address:zhu_hongbing@ctgpc.com.cn(H.Zhu).

    Peer review under responsibility of Institute of Rock and Soil Mechanics, Chinese Academy of Sciences.

    1674-7755?2015 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.All rights reserved.

    http://dx.doi.org/10.1016/j.jrmge.2015.02.007

    国产色婷婷99| 亚洲成a人片在线一区二区| 国产国拍精品亚洲av在线观看| 精品乱码久久久久久99久播| 国产一区二区激情短视频| 中国美女看黄片| 老司机午夜福利在线观看视频| 啦啦啦啦在线视频资源| 99久久成人亚洲精品观看| 久久午夜亚洲精品久久| 久久九九热精品免费| 露出奶头的视频| 1024手机看黄色片| 色视频www国产| 看片在线看免费视频| 一区二区三区激情视频| 亚洲av.av天堂| 女人十人毛片免费观看3o分钟| 日本撒尿小便嘘嘘汇集6| 美女被艹到高潮喷水动态| 国产视频一区二区在线看| 男人舔女人下体高潮全视频| 丝袜美腿在线中文| 国产精品嫩草影院av在线观看 | 亚洲,欧美,日韩| 日韩欧美国产一区二区入口| 欧美性感艳星| 又爽又黄无遮挡网站| 在线观看舔阴道视频| 日韩一本色道免费dvd| 长腿黑丝高跟| 在线免费观看不下载黄p国产 | 免费大片18禁| 中文字幕免费在线视频6| 欧美+日韩+精品| 免费看a级黄色片| 国国产精品蜜臀av免费| 99热这里只有是精品在线观看| 亚洲中文日韩欧美视频| 久久久午夜欧美精品| 国产精品三级大全| 亚洲欧美激情综合另类| 老司机深夜福利视频在线观看| av中文乱码字幕在线| 狂野欧美激情性xxxx在线观看| 少妇人妻精品综合一区二区 | 精品无人区乱码1区二区| a级一级毛片免费在线观看| 悠悠久久av| 亚州av有码| 高清毛片免费观看视频网站| 真实男女啪啪啪动态图| 色哟哟哟哟哟哟| 美女高潮喷水抽搐中文字幕| 国产精品99久久久久久久久| eeuss影院久久| 校园人妻丝袜中文字幕| 日本在线视频免费播放| 在线观看66精品国产| 久久婷婷人人爽人人干人人爱| 色精品久久人妻99蜜桃| 淫妇啪啪啪对白视频| 亚洲电影在线观看av| 高清日韩中文字幕在线| 国产精华一区二区三区| 天堂av国产一区二区熟女人妻| 亚洲成人久久性| 国产国拍精品亚洲av在线观看| 国产淫片久久久久久久久| 高清在线国产一区| 精品午夜福利视频在线观看一区| 午夜福利18| 又粗又爽又猛毛片免费看| 国产免费一级a男人的天堂| 日日啪夜夜撸| 黄色女人牲交| 久久久久久大精品| videossex国产| 国产视频内射| 国产aⅴ精品一区二区三区波| 日韩欧美在线乱码| 国产亚洲精品久久久久久毛片| 此物有八面人人有两片| 国产蜜桃级精品一区二区三区| 国国产精品蜜臀av免费| 一区二区三区免费毛片| 亚洲人成伊人成综合网2020| 国产伦一二天堂av在线观看| 热99在线观看视频| 在现免费观看毛片| 在线观看舔阴道视频| 少妇人妻一区二区三区视频| 亚洲五月天丁香| 老师上课跳d突然被开到最大视频| 全区人妻精品视频| a级毛片a级免费在线| 国产日本99.免费观看| 日日摸夜夜添夜夜添av毛片 | 色吧在线观看| 日韩欧美在线乱码| 久久精品国产亚洲av涩爱 | 天天躁日日操中文字幕| 欧美黑人巨大hd| www.www免费av| 国产淫片久久久久久久久| 久久精品国产亚洲av天美| 在线观看舔阴道视频| 999久久久精品免费观看国产| 精品人妻视频免费看| 精品午夜福利在线看| 欧美激情在线99| 51国产日韩欧美| 观看免费一级毛片| 两性午夜刺激爽爽歪歪视频在线观看| 成人毛片a级毛片在线播放| 久久99热这里只有精品18| 国内毛片毛片毛片毛片毛片| 能在线免费观看的黄片| 国产探花在线观看一区二区| 欧美激情国产日韩精品一区| 成人国产麻豆网| 午夜免费激情av| 人妻丰满熟妇av一区二区三区| 22中文网久久字幕| 舔av片在线| 欧美成人免费av一区二区三区| 亚洲av二区三区四区| 亚洲自偷自拍三级| 国产日本99.免费观看| 欧美日韩瑟瑟在线播放| 免费高清视频大片| 久久草成人影院| av福利片在线观看| 听说在线观看完整版免费高清| 欧美中文日本在线观看视频| 精品一区二区三区人妻视频| 嫩草影院新地址| 别揉我奶头 嗯啊视频| 亚洲电影在线观看av| 丰满乱子伦码专区| 久久精品国产鲁丝片午夜精品 | 桃色一区二区三区在线观看| 女同久久另类99精品国产91| av在线天堂中文字幕| 精品99又大又爽又粗少妇毛片 | 亚洲欧美激情综合另类| 欧美一级a爱片免费观看看| 联通29元200g的流量卡| 在线观看一区二区三区| 国产真实乱freesex| av在线亚洲专区| 久久精品国产亚洲av香蕉五月| 春色校园在线视频观看| 亚洲午夜理论影院| 美女黄网站色视频| 又爽又黄无遮挡网站| 国产高清不卡午夜福利| 免费大片18禁| 亚洲天堂国产精品一区在线| 国产毛片a区久久久久| 淫妇啪啪啪对白视频| 美女xxoo啪啪120秒动态图| 香蕉av资源在线| 国产男人的电影天堂91| 国产精品女同一区二区软件 | 亚洲avbb在线观看| 色综合婷婷激情| 身体一侧抽搐| 久久国产精品人妻蜜桃| 白带黄色成豆腐渣| 啦啦啦啦在线视频资源| 真实男女啪啪啪动态图| 国产老妇女一区| 国产精品人妻久久久影院| 最后的刺客免费高清国语| 九九爱精品视频在线观看| 伦精品一区二区三区| 免费在线观看影片大全网站| 国产三级中文精品| 女生性感内裤真人,穿戴方法视频| 国产精华一区二区三区| 精品一区二区三区av网在线观看| 日韩欧美国产在线观看| 免费av观看视频| 国产 一区精品| 舔av片在线| 精品日产1卡2卡| 久久精品国产亚洲av涩爱 | 最近在线观看免费完整版| 日韩大尺度精品在线看网址| 国产三级中文精品| 精品免费久久久久久久清纯| 精品久久久久久成人av| 国产亚洲精品久久久久久毛片| 久久久久久伊人网av| 麻豆成人午夜福利视频| 亚洲精华国产精华液的使用体验 | 九色国产91popny在线| 国产极品精品免费视频能看的| 精品午夜福利在线看| 国产成人aa在线观看| 午夜免费男女啪啪视频观看 | 丰满的人妻完整版| 中国美女看黄片| 成人美女网站在线观看视频| 99久久九九国产精品国产免费| 亚洲美女黄片视频| 亚洲国产欧美人成| x7x7x7水蜜桃| 久久久久久久久久成人| 久久久久久伊人网av| 国产人妻一区二区三区在| 国产激情偷乱视频一区二区| 亚洲成人免费电影在线观看| 99热网站在线观看| 国产黄a三级三级三级人| 在线观看美女被高潮喷水网站| 91麻豆av在线| 国产色爽女视频免费观看| 日韩欧美 国产精品| 日本 av在线| 久久精品久久久久久噜噜老黄 | 久久精品国产亚洲av涩爱 | 热99在线观看视频| 99久久精品热视频| 狂野欧美激情性xxxx在线观看| 久久国内精品自在自线图片| 校园春色视频在线观看| 欧美绝顶高潮抽搐喷水| 神马国产精品三级电影在线观看| 91久久精品国产一区二区三区| 欧美xxxx性猛交bbbb| 国产又黄又爽又无遮挡在线| 欧美日本视频| 欧美日韩综合久久久久久 | 九九在线视频观看精品| 国产午夜精品久久久久久一区二区三区 | 成年女人永久免费观看视频| 成人无遮挡网站| 尤物成人国产欧美一区二区三区| 国产精品99久久久久久久久| 在线观看av片永久免费下载| 国产91精品成人一区二区三区| 变态另类丝袜制服| 国产黄色小视频在线观看| 一进一出抽搐动态| 久久久久久久久久久丰满 | 国产精品98久久久久久宅男小说| 美女大奶头视频| 校园人妻丝袜中文字幕| 亚洲人成网站在线播| 在线a可以看的网站| 99热只有精品国产| 久久久色成人| 亚洲精品乱码久久久v下载方式| 高清在线国产一区| av在线亚洲专区| 国内精品美女久久久久久| 国产精品av视频在线免费观看| 日本爱情动作片www.在线观看 | 99在线视频只有这里精品首页| 在线播放国产精品三级| 久久精品国产亚洲av涩爱 | 成人特级av手机在线观看| 禁无遮挡网站| 如何舔出高潮| 又紧又爽又黄一区二区| 成人三级黄色视频| 精品久久久久久久久亚洲 | 99久国产av精品| 美女高潮的动态| 国产精品野战在线观看| 免费观看在线日韩| 久久精品国产清高在天天线| 国产淫片久久久久久久久| 亚洲中文日韩欧美视频| 精品人妻视频免费看| 性插视频无遮挡在线免费观看| 色尼玛亚洲综合影院| 看免费成人av毛片| 中文亚洲av片在线观看爽| 婷婷色综合大香蕉| 嫩草影院精品99| 少妇人妻精品综合一区二区 | 悠悠久久av| 最近视频中文字幕2019在线8| 韩国av在线不卡| 精品久久久噜噜| 久久久久国产精品人妻aⅴ院| 亚洲av中文av极速乱 | 男人狂女人下面高潮的视频| 两性午夜刺激爽爽歪歪视频在线观看| 成人国产麻豆网| 99在线视频只有这里精品首页| 美女被艹到高潮喷水动态| 老熟妇仑乱视频hdxx| 亚洲国产欧洲综合997久久,| 欧美黑人巨大hd| 亚洲一区高清亚洲精品| 两性午夜刺激爽爽歪歪视频在线观看| 在线观看一区二区三区| 一区二区三区四区激情视频 | 九九久久精品国产亚洲av麻豆| 免费观看的影片在线观看| 日韩一区二区视频免费看| 人人妻人人澡欧美一区二区| 女人十人毛片免费观看3o分钟| 久久久精品大字幕| 成人国产一区最新在线观看| 欧美一区二区国产精品久久精品| 欧美xxxx性猛交bbbb| av专区在线播放| 国产极品精品免费视频能看的| 国产伦精品一区二区三区视频9| 国产亚洲精品久久久com| 成人一区二区视频在线观看| 一区二区三区激情视频| 色吧在线观看| 国产精品一区www在线观看 | 国产一区二区亚洲精品在线观看| 欧美成人免费av一区二区三区| 日本-黄色视频高清免费观看| 亚洲无线在线观看| 欧美中文日本在线观看视频| 国产精品乱码一区二三区的特点| 一进一出抽搐gif免费好疼| 一进一出好大好爽视频| 日韩高清综合在线| 国产高清三级在线| 在线观看免费视频日本深夜| 国产男人的电影天堂91| 麻豆精品久久久久久蜜桃| 欧美不卡视频在线免费观看| 国产高清视频在线观看网站| 成年免费大片在线观看| 国产高清不卡午夜福利| 亚洲狠狠婷婷综合久久图片| 精品人妻一区二区三区麻豆 | 亚洲精品456在线播放app | 日日撸夜夜添| 欧美zozozo另类| 国产精品久久电影中文字幕| av福利片在线观看| 亚洲av免费在线观看| 简卡轻食公司| 国产乱人伦免费视频| 精品久久国产蜜桃| 国产精品久久电影中文字幕| 一区二区三区高清视频在线| 日本爱情动作片www.在线观看 | 亚洲美女搞黄在线观看 | 啦啦啦观看免费观看视频高清| 一区二区三区激情视频| 亚洲综合色惰| a在线观看视频网站| 亚洲精华国产精华液的使用体验 | 亚洲av成人精品一区久久| 又紧又爽又黄一区二区| 哪里可以看免费的av片| 成人性生交大片免费视频hd| 级片在线观看| 亚洲国产高清在线一区二区三| 十八禁网站免费在线| 久99久视频精品免费| 欧美不卡视频在线免费观看| 日本精品一区二区三区蜜桃| 亚洲精品456在线播放app | 夜夜爽天天搞| 日韩欧美国产在线观看| 欧美一区二区精品小视频在线| 久久久久久伊人网av| 午夜福利在线观看吧| 精品国内亚洲2022精品成人| 亚洲av中文av极速乱 | 中文字幕久久专区| 搡老岳熟女国产| 真人一进一出gif抽搐免费| 日本-黄色视频高清免费观看| 免费观看的影片在线观看| 国产午夜福利久久久久久| 国产精品久久视频播放| 国产精品亚洲美女久久久| 波多野结衣高清作品| 成年女人毛片免费观看观看9| 在线a可以看的网站| 精品国产三级普通话版| 久久久久九九精品影院| 精品久久久噜噜| 精品久久久久久久久亚洲 | 久久精品91蜜桃| 一级毛片久久久久久久久女| 国产在视频线在精品| 一本一本综合久久| 亚洲精品一卡2卡三卡4卡5卡| 亚洲黑人精品在线| 少妇熟女aⅴ在线视频| 嫩草影院新地址| 欧美激情久久久久久爽电影| 97热精品久久久久久| 全区人妻精品视频| 成人av在线播放网站| 22中文网久久字幕| 一本久久中文字幕| 黄色配什么色好看| 狂野欧美激情性xxxx在线观看| 99久国产av精品| 12—13女人毛片做爰片一| 国产黄色小视频在线观看| 亚洲人成网站高清观看| 久久久午夜欧美精品| 俺也久久电影网| 内射极品少妇av片p| a级毛片免费高清观看在线播放| 真实男女啪啪啪动态图| 91av网一区二区| 国产美女午夜福利| 欧美最新免费一区二区三区| 国产黄色小视频在线观看| 欧美一级a爱片免费观看看| 色综合亚洲欧美另类图片| xxxwww97欧美| 此物有八面人人有两片| 麻豆成人午夜福利视频| 又紧又爽又黄一区二区| 国内精品宾馆在线| 神马国产精品三级电影在线观看| 中出人妻视频一区二区| 高清日韩中文字幕在线| 可以在线观看毛片的网站| 综合色av麻豆| 免费看光身美女| 亚洲精品影视一区二区三区av| 在线天堂最新版资源| 麻豆国产av国片精品| 国产免费一级a男人的天堂| 日韩高清综合在线| 网址你懂的国产日韩在线| 亚洲电影在线观看av| 淫秽高清视频在线观看| 中文字幕久久专区| 亚洲综合色惰| 啦啦啦啦在线视频资源| 一区二区三区高清视频在线| 亚洲熟妇熟女久久| 亚洲男人的天堂狠狠| 91av网一区二区| 麻豆av噜噜一区二区三区| 久久热精品热| 老司机午夜福利在线观看视频| 黄色女人牲交| 日韩一区二区视频免费看| 国内毛片毛片毛片毛片毛片| 国产精品1区2区在线观看.| 天堂√8在线中文| 国产高清三级在线| 亚洲av.av天堂| 热99re8久久精品国产| 美女 人体艺术 gogo| 婷婷亚洲欧美| 欧美性感艳星| 亚洲中文日韩欧美视频| 91在线精品国自产拍蜜月| 三级男女做爰猛烈吃奶摸视频| 久久久色成人| 亚洲欧美日韩无卡精品| 中文在线观看免费www的网站| 变态另类丝袜制服| 亚洲va日本ⅴa欧美va伊人久久| 国产黄色小视频在线观看| 日韩在线高清观看一区二区三区 | 亚洲狠狠婷婷综合久久图片| 亚洲三级黄色毛片| 国产免费av片在线观看野外av| 中文字幕免费在线视频6| 久久亚洲精品不卡| 成人一区二区视频在线观看| 日本免费a在线| 在线观看免费视频日本深夜| 国产成人av教育| 欧美日韩精品成人综合77777| 观看免费一级毛片| 久久精品综合一区二区三区| 国产毛片a区久久久久| 天天躁日日操中文字幕| 日韩国内少妇激情av| 色噜噜av男人的天堂激情| 最近在线观看免费完整版| 又黄又爽又免费观看的视频| 色综合亚洲欧美另类图片| 免费看日本二区| 国产精品一及| 亚洲午夜理论影院| videossex国产| 亚洲专区中文字幕在线| 中文字幕免费在线视频6| 亚洲av成人av| 国产精品乱码一区二三区的特点| 国内精品宾馆在线| 精品久久久久久,| 级片在线观看| 国产精品自产拍在线观看55亚洲| 欧美不卡视频在线免费观看| 亚洲aⅴ乱码一区二区在线播放| 成人永久免费在线观看视频| 国产一区二区在线av高清观看| 最近最新中文字幕大全电影3| 丰满的人妻完整版| 中文在线观看免费www的网站| 欧美日韩中文字幕国产精品一区二区三区| 少妇高潮的动态图| 乱系列少妇在线播放| 黄片wwwwww| 亚洲三级黄色毛片| 成人午夜高清在线视频| 麻豆久久精品国产亚洲av| 免费看日本二区| 亚洲av免费在线观看| 欧美日韩国产亚洲二区| 免费观看的影片在线观看| 亚洲乱码一区二区免费版| 精品99又大又爽又粗少妇毛片 | 蜜桃亚洲精品一区二区三区| 人人妻,人人澡人人爽秒播| 成人av在线播放网站| 久久热精品热| 韩国av在线不卡| 亚洲成人精品中文字幕电影| 色视频www国产| 亚洲成人精品中文字幕电影| xxxwww97欧美| 亚洲国产精品sss在线观看| 99热这里只有精品一区| 九九久久精品国产亚洲av麻豆| 观看免费一级毛片| 国产精品女同一区二区软件 | 久99久视频精品免费| 久久久午夜欧美精品| 国产日本99.免费观看| 波多野结衣高清无吗| 精品人妻熟女av久视频| 成人av一区二区三区在线看| 性插视频无遮挡在线免费观看| 国语自产精品视频在线第100页| 高清毛片免费观看视频网站| 亚洲av中文av极速乱 | 女生性感内裤真人,穿戴方法视频| 黄色一级大片看看| 国产麻豆成人av免费视频| 黄色女人牲交| 尾随美女入室| 男人和女人高潮做爰伦理| 婷婷色综合大香蕉| 免费一级毛片在线播放高清视频| 少妇猛男粗大的猛烈进出视频 | 欧美性猛交╳xxx乱大交人| a级一级毛片免费在线观看| 国产精品久久久久久av不卡| 日韩欧美国产一区二区入口| 久久精品国产亚洲av天美| 国产国拍精品亚洲av在线观看| 午夜免费男女啪啪视频观看 | 久久精品综合一区二区三区| 真人做人爱边吃奶动态| 极品教师在线免费播放| 欧美最新免费一区二区三区| 国产视频内射| 天堂动漫精品| 欧美精品啪啪一区二区三区| 国产成人aa在线观看| www.色视频.com| 欧美日韩国产亚洲二区| 99在线视频只有这里精品首页| 一区福利在线观看| 国产精品人妻久久久久久| 男插女下体视频免费在线播放| 国产一区二区三区av在线 | 一本久久中文字幕| 成年女人看的毛片在线观看| 国产精品嫩草影院av在线观看 | 精品久久国产蜜桃| 黄色配什么色好看| 非洲黑人性xxxx精品又粗又长| 久久99热这里只有精品18| 国产午夜精品论理片| 最近在线观看免费完整版| 国产精品av视频在线免费观看| 中国美白少妇内射xxxbb| 久久久色成人| 国产高清激情床上av| 日日摸夜夜添夜夜添av毛片 | 午夜免费成人在线视频| 老女人水多毛片| 亚洲欧美日韩卡通动漫| 亚洲一区二区三区色噜噜| 狂野欧美白嫩少妇大欣赏| 深夜a级毛片| 一级av片app| 成人国产麻豆网| 久久精品国产鲁丝片午夜精品 | 中文字幕久久专区| 嫩草影院入口| 亚洲欧美日韩无卡精品| 天堂av国产一区二区熟女人妻| 18禁裸乳无遮挡免费网站照片| 成人三级黄色视频| 小蜜桃在线观看免费完整版高清| 中国美女看黄片| 搡老岳熟女国产| 18+在线观看网站| 久久午夜亚洲精品久久| 男女做爰动态图高潮gif福利片| 国产伦在线观看视频一区| 久99久视频精品免费| 精品乱码久久久久久99久播| 国产精品亚洲美女久久久|