趙振山
【摘要】本文結(jié)合施工經(jīng)驗(yàn)對(duì)無(wú)粘結(jié)預(yù)應(yīng)力鋼筋混凝土在大空間、大跨度房屋結(jié)構(gòu)上的施工經(jīng)驗(yàn)和新的施工工藝進(jìn)行分析,并對(duì)常見(jiàn)質(zhì)量問(wèn)題及預(yù)防措施進(jìn)行了探討。
【關(guān)鍵詞】無(wú)粘結(jié)預(yù)應(yīng)力;鋼筋混凝土;大空間和跨度;工藝
Unbonded prestressed concrete application in the large span space structures
Zhao Zhen-shan
(Daming County Xin River Construction Co., Ltd Daming Hebei 056900)
【Abstract】Combined with construction experience of unbonded prestressed concrete are analyzed in a large space, construction experience on large-span structure houses and new construction techniques, and common quality problems and preventive measures were discussed.
【Key words】Unbonded prestressed;Reinforced concrete;Large space and span;Process
1. 引言
隨著現(xiàn)代工程建設(shè)的發(fā)展,為了有效控制大跨度、大空間結(jié)構(gòu)中裂縫的出現(xiàn),預(yù)應(yīng)力技術(shù)也已經(jīng)日趨成熟。本文結(jié)合施工經(jīng)驗(yàn)通過(guò)對(duì)具體工程的介紹,對(duì)無(wú)粘結(jié)預(yù)應(yīng)力鋼筋混凝土的常見(jiàn)質(zhì)量問(wèn)題及預(yù)防措施進(jìn)行了探討。
2. 工程概況
某商業(yè)綜合樓,基礎(chǔ)為樁基礎(chǔ);主體結(jié)構(gòu)為框架剪力墻結(jié)構(gòu),建筑面積5萬(wàn)m2;二層地下室為車(chē)庫(kù);地上分成主樓和裙樓;主樓框剪15層、層高4.5m,檐口高度60m;裙樓框架3層,檐口高度18m;主、裙樓以連廊相連。
3. 結(jié)構(gòu)設(shè)計(jì)
某商業(yè)綜合樓主樓及裙樓總長(zhǎng)度分別為98m和89m,均未設(shè)伸縮縫,而采用在板面設(shè)置通長(zhǎng)鋼筋網(wǎng)片。在地下室梁板內(nèi),設(shè)置縱橫雙向預(yù)應(yīng)力構(gòu)造鋼筋、在主樓5層以上的長(zhǎng)向梁板內(nèi)施加預(yù)應(yīng)力構(gòu)造鋼筋,用來(lái)控制混凝土梁板裂縫;裙樓的3層為多功能廳,頂板梁跨度分別達(dá)到23m和14m,則采用預(yù)應(yīng)力混凝土梁;在設(shè)計(jì)中考慮預(yù)應(yīng)力鋼筋、非預(yù)應(yīng)力鋼筋同時(shí)承受荷載。設(shè)計(jì)要求:梁板預(yù)應(yīng)力構(gòu)造鋼筋采用@800mm高強(qiáng)度低松弛鋼絞線(xiàn);框架梁內(nèi)為預(yù)應(yīng)力鋼筋。
4. 無(wú)粘結(jié)預(yù)應(yīng)力施工的工藝特點(diǎn)
后張法無(wú)粘結(jié)預(yù)應(yīng)力混凝土不僅施工工藝簡(jiǎn)單,操作方便,技術(shù)先進(jìn),張拉柵具簡(jiǎn)單輕巧,方便移動(dòng),可在高空和小空間內(nèi)工作,張拉時(shí)不占用工期,而且后張法無(wú)粘結(jié)鋼絞線(xiàn)預(yù)應(yīng)力混凝土施工工藝是近年來(lái)在大跨度粱中廣泛應(yīng)用的一種新工藝,與多年來(lái)常用的“先張法有粘結(jié)鋼絞線(xiàn)預(yù)應(yīng)力混凝土工藝”和“后張法有粘結(jié)預(yù)應(yīng)力砼工藝”相比有以下特點(diǎn):
4.1 預(yù)應(yīng)力筋張拉力的傳力途徑不同。傳統(tǒng)的“有粘結(jié)預(yù)應(yīng)力混凝土工藝”預(yù)應(yīng)力筋張拉后需灌漿,其預(yù)應(yīng)力的張拉力由錨具及灌漿體共同作用傳遞給混凝土構(gòu)件。而新的“無(wú)粘結(jié)預(yù)應(yīng)力混凝土工藝”的預(yù)應(yīng)力筋與混凝土構(gòu)件之間沒(méi)有任何介質(zhì)粘結(jié),全靠錨具承受并傳遞預(yù)應(yīng)力。故鋼絞線(xiàn)及錨具必須終身不生銹,對(duì)材料的材質(zhì)要求很高,費(fèi)用較大。
4.2 施工工序不同?!坝姓辰Y(jié)預(yù)應(yīng)力混凝土工藝”在混凝土構(gòu)件澆筑時(shí)需要預(yù)留孔,然后,鋪穿預(yù)應(yīng)力筋進(jìn)行張拉,最后灌漿填孔?!盁o(wú)粘結(jié)預(yù)應(yīng)力混凝土工藝”在混凝土構(gòu)件鋼筋綁扎時(shí)同步按設(shè)計(jì)要求布置呈拋物線(xiàn)狀的無(wú)粘結(jié)預(yù)應(yīng)力筋,張拉后無(wú)需灌漿,簡(jiǎn)化了工序,加快了施工進(jìn)度。由于預(yù)應(yīng)力束能曲線(xiàn)布置,使預(yù)應(yīng)力筋按設(shè)計(jì)要求在構(gòu)件受力部位發(fā)生最大效能,故特別適用于在大跨度梁中的運(yùn)用。
5. 預(yù)應(yīng)力材料選擇
(1)預(yù)應(yīng)力筋采用高強(qiáng)度低松弛鋼絞線(xiàn),鋼絞線(xiàn)為1860級(jí),其性能滿(mǎn)足GB/T 5224-2003的要求。本工程結(jié)構(gòu)設(shè)計(jì)的混凝土的強(qiáng)度等級(jí)分別為C40、C35、C30,預(yù)應(yīng)力鋼筋張拉完成后,采用同強(qiáng)度等級(jí)的混凝土封閉張拉端。預(yù)應(yīng)力錨固體系由錨環(huán)、夾片、承壓板、螺旋筋等組成,質(zhì)量應(yīng)符合《預(yù)應(yīng)力筋用錨具,夾具和連接器》(GB/T14370-2007)中對(duì)錨具的質(zhì)量要求。產(chǎn)品進(jìn)場(chǎng)時(shí)必須具備生產(chǎn)廠家的產(chǎn)品出廠證明及質(zhì)量保證書(shū),且必須進(jìn)行進(jìn)場(chǎng)驗(yàn)收。檢驗(yàn)分為出廠檢驗(yàn)和型式檢驗(yàn)。
(2)無(wú)粘結(jié)預(yù)應(yīng)力鋼筋包涂由預(yù)應(yīng)力專(zhuān)業(yè)包涂廠家采用建筑防腐油脂和高密度聚乙烯包涂而成。
6. 預(yù)應(yīng)力鋼筋的下料
(1)本工程采用現(xiàn)場(chǎng)下料,下料時(shí)采用無(wú)齒砂輪切割機(jī)進(jìn)行切割,下料長(zhǎng)度按下列公式計(jì)算:L=L1+L2+L3
式中:L1——預(yù)應(yīng)力鋼筋埋入構(gòu)件內(nèi)的長(zhǎng)度(平面長(zhǎng)度+曲線(xiàn)增長(zhǎng)):L2——預(yù)應(yīng)力鋼筋張拉長(zhǎng)度;L3——下料長(zhǎng)度誤差。
(2)預(yù)應(yīng)力筋的下料應(yīng)在平整的場(chǎng)地上直線(xiàn)定出下料長(zhǎng)度,并在下料場(chǎng)地兩端設(shè)置固定標(biāo)志,每端有專(zhuān)人負(fù)責(zé);切斷前應(yīng)將預(yù)應(yīng)力筋拉直;用砂輪切割機(jī)切斷,不得用電弧切割。對(duì)所下的預(yù)應(yīng)力筋做好分區(qū)及類(lèi)型編號(hào),在其兩端做出同顏色的標(biāo)志并標(biāo)明長(zhǎng)度。
7. 無(wú)粘結(jié)預(yù)應(yīng)力混凝土梁施工重點(diǎn)
7.1 無(wú)粘接預(yù)應(yīng)力鋼筋的鋪設(shè)。
(1)本工程預(yù)應(yīng)力鋼筋的旌工如下:板中的預(yù)應(yīng)力鋼筋的施工,在板的下層鋼筋鋪設(shè)完成以后進(jìn)行鋪設(shè),然后再鋪設(shè)梁板負(fù)筋;在梁的普通鋼筋綁扎完成后,開(kāi)始鋪設(shè)框架梁的預(yù)應(yīng)力鋼筋,預(yù)應(yīng)力粱筋呈曲線(xiàn)布置。
其曲線(xiàn)方程為:Y1=-2FX2/LC+(h-ap);Y2=2f(0.5L-X)2/L(0.5L-C)+ap
式中:Y1為反彎點(diǎn)到支座處的曲線(xiàn)方程;Y2為反彎點(diǎn)到跨中處的曲線(xiàn)方程;f為預(yù)應(yīng)力筋曲線(xiàn)矢高(mm);C預(yù)應(yīng)力鋼筋曲線(xiàn)反彎點(diǎn)(m),C=0.15L;H——梁高或板厚(咖);Y——預(yù)應(yīng)力筋曲線(xiàn)縱坐標(biāo)(mm);X——預(yù)應(yīng)力鋼筋曲線(xiàn)橫坐標(biāo)(mm),C=0.15L;L——梁板軸線(xiàn)跨度(m)。endprint
(2)預(yù)應(yīng)力梁筋曲線(xiàn)標(biāo)高在支座、反彎點(diǎn)、跨中五個(gè)控制點(diǎn)由支撐架控制。無(wú)粘接預(yù)應(yīng)力鋼筋在運(yùn)輸及施工過(guò)程中,應(yīng)防止無(wú)粘接筋包皮被其他鋼筋刺穿或劃破膠皮,如有破損,應(yīng)立即用水密性膠帶進(jìn)行纏繞修復(fù),膠帶搭設(shè)寬度不應(yīng)小于膠帶寬度的1/2,纏繞長(zhǎng)度應(yīng)超過(guò)破損長(zhǎng)度,嚴(yán)重破損的應(yīng)報(bào)廢。預(yù)應(yīng)力筋用扎絲綁扎固定,其凈保護(hù)層厚度在梁中應(yīng)大于50mm。板中應(yīng)大于20mm。鋪設(shè)的預(yù)應(yīng)力鋼筋要求順直,曲線(xiàn)平滑流暢,不得有死彎或突變,標(biāo)高誤差不大于10mm。預(yù)應(yīng)力鋼筋采用12的圓鋼焊接或綁扎在普通鋼筋上,并按照設(shè)計(jì)要求確定綁扎高度和位置。
7.2 混凝土澆筑。
無(wú)粘結(jié)預(yù)應(yīng)力筋安放完畢并檢查合格后。安裝梁側(cè)模,側(cè)模安裝完成后須對(duì)無(wú)粘結(jié)預(yù)應(yīng)力筋的矢高控制點(diǎn)、承壓板和固定錨具的位置進(jìn)行二次檢查。在澆筑混凝土?xí)r,要保證預(yù)應(yīng)力筋形狀及錨具位置準(zhǔn)確,振搗時(shí)防止錨具、固定架位置偏移,嚴(yán)禁觸碰無(wú)粘結(jié)預(yù)應(yīng)力筋的聚乙烯外皮,梁端部承壓區(qū)混凝土必須振搗實(shí)心密實(shí),混凝土不得摻入引氣劑和含有氯離子的外加劑,以防止預(yù)應(yīng)力筋銹蝕。
7.3 預(yù)應(yīng)力鋼筋的張拉。
(1)根據(jù)施工方案,在混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度的80%后方可張拉;張拉方式采用逐層施工,逐層張拉,且進(jìn)行對(duì)稱(chēng)施工的方法。
(2)張拉控制應(yīng)力δcon=0.70*1860=1302MPa,實(shí)行超張拉3%,1302×1.03=1341.06MPa。
(3)張拉程序:讀初伸長(zhǎng)值L1并作記錄——δcon (量測(cè)伸長(zhǎng)值L2并作記錄),o——20%δcon (L1)-l00%δcon (L2)——103%δcon (錨固)——卸荷。實(shí)際伸長(zhǎng)量△L與初應(yīng)力伸長(zhǎng)推算值之和與理論張拉伸長(zhǎng)相比較誤差不超過(guò)規(guī)范要求的±6%,否則應(yīng)停機(jī)檢查原因,進(jìn)行必要的處理。預(yù)應(yīng)力筋的張拉順序應(yīng)使結(jié)構(gòu)受力均勻、同步,不產(chǎn)生扭轉(zhuǎn)、側(cè)彎,不應(yīng)使混凝土產(chǎn)生超應(yīng)力,不應(yīng)使其它構(gòu)件產(chǎn)生過(guò)大的附加內(nèi)力及變形等。因此,應(yīng)遵循同步、對(duì)稱(chēng)張拉的原則。預(yù)應(yīng)力鋼筋變角張拉:板面變角張拉需在板面留設(shè)張拉槽,張拉端承壓墊板安裝于張拉槽內(nèi),微微保持傾斜,施工中注意保持無(wú)粘接預(yù)應(yīng)力鋼筋與承壓板保持垂直。
7.4 錨具封堵。
錨具應(yīng)采取防腐蝕及破損的保護(hù)措施。預(yù)應(yīng)力筋錨固后的外露長(zhǎng)度應(yīng)不小于30mm,多余部分宜用砂輪鋸切割,嚴(yán)禁用電弧切割。然后在承壓板上涂刷界面處理劑,用自制的塑料蓋帽內(nèi)裝防腐潤(rùn)滑脂進(jìn)行封錨,并用C45微膨脹混凝土封閉穴槽,確保封閉嚴(yán)密,防止錨固系統(tǒng)銹蝕。
8. 施工質(zhì)量通病、防治及注意事項(xiàng)
包涂膠皮破損:避免北非預(yù)應(yīng)力鋼筋直接擠壓或沖擊;穿束時(shí)無(wú)粘接筋在支撐筋上刮傷:支撐筋用圓鋼代替螺紋鋼;包涂膠皮燒傷或燙傷:嚴(yán)禁在無(wú)粘接筋附近進(jìn)行氧焊作業(yè)或動(dòng)焊;無(wú)粘接束水平位置偏差大:加強(qiáng)綁扎;無(wú)粘接筋與墊板不垂直:使無(wú)粘接筋在墊板后300mm范圍內(nèi)保持垂直。固定端擠壓錨具與承壓墊板脫離:采用擠壓墊板。張拉時(shí)墊板凹陷:澆筑前檢查端部模板封堵牢固,澆筑時(shí)加強(qiáng)振搗。混凝土的澆筑及養(yǎng)護(hù):混凝土澆筑時(shí)必須注意振動(dòng)棒不得連續(xù)沖擊無(wú)粘接預(yù)應(yīng)力鋼筋;對(duì)于節(jié)點(diǎn)和張拉端部的混凝土必須振動(dòng)密實(shí),不能在承壓板后形成孔洞?;炷翝仓r(shí),除按混凝土本身要求制作試塊外,還應(yīng)多做一組試塊,待其強(qiáng)度檢驗(yàn)合格后方可張拉?;炷翝仓瓿珊蟊仨毤皶r(shí)進(jìn)行養(yǎng)護(hù),以保證構(gòu)件張拉前混凝土不出現(xiàn)裂縫。
9. 結(jié)語(yǔ)
經(jīng)過(guò)有序控制施工程序和施工質(zhì)量,無(wú)粘結(jié)預(yù)應(yīng)力工程順利完成。實(shí)踐證明,無(wú)粘結(jié)預(yù)應(yīng)力鋼筋混凝土具有解決大跨度和大空間方面的結(jié)構(gòu)優(yōu)勢(shì).未來(lái)該技術(shù)必將得到廣泛的應(yīng)用。
參考文獻(xiàn)
[1] 陶學(xué)康.無(wú)粘結(jié)預(yù)應(yīng)力混疑土設(shè)計(jì)與施工[M].北京:地震出版社,1993.
[2] 博溫.高效預(yù)應(yīng)力混凝土工程技術(shù)[M].北京:中國(guó)民航出版社.1996.
[3] 陳惠玲,葉正宇.預(yù)應(yīng)力混凝土有粘結(jié)及無(wú)粘結(jié)應(yīng)力技術(shù)同答[M].北京:中國(guó)環(huán)境科學(xué)出版社,2001.endprint