• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    A milestone for Baihetan Hydropower Station白鶴灘水電站發(fā)展的里程碑

    2023-10-30 16:36:25孫建麗
    瘋狂英語·新策略 2023年3期
    關(guān)鍵詞:主題復(fù)合句分詞

    孫建麗

    主題語境:能源 篇幅:341詞 建議用時:6分鐘

    Baihetan Hydropower Station, the worlds largestand most difficult?to?build hydropower project that isstill under construction, generated 10 billion kilowatt?hours of green power in 2022.

    The power amount equals that produced byburning about 3.06 million metric tons of standardcoal, and represents a reduction of about 8.38 million tons of carbon dioxide, which adds agreat deal to Chinas green transformation in economic and social development and its goalof peaking carbon dioxide emissions by 2030 and reaching carbon neutrality(碳中和)by2060. Since the first generator units went into operation, the station has in all generatedbillions of kWh of power, and all units are stably running. At present, the last two generatorunits of the station are in their closing stage of final assembly (安裝).

    Located over the Jinsha River on the border of Southwest Chinas Yunnan and Si?chuan provinces, Baihetan Hydropower Station is a national major project for the countryswest?to?east power transmission, which aims to transmit electricity from the resource?rich?western part of China to energy?hungry regions in eastern China.

    The station is installed with 16 hydro?generating units, each with a capacity of 1 mil?lion kilowatts, the largest single?unit capacity in the world. It is the most technically diffi?cult hydropower project under construction in the world today, dubbed the Mount Qomol?angma of the hydropower industry. The efficiency of the turbine (渦輪機(jī)) for power genera?tors is 96.7 percent, ranking at the worlds leading level.

    Baihetan Hydropower Station, together with the Wudongde, Xiluodu, Xiangjiaba,Three Gorges, and Gezhouba power stations, forms the worlds largest clean power corridor.All of them are operated by China Three Gorges Corporation.

    After reaching full operation, Baihetan Hydropower Station will be the worlds second?largest of its kind after Chinas Three Gorges Dam. The station can generate 62.4 billion kWhof clean electricity every year, cutting the usage of 19.68 million tons of standard coal andreducing emissions equivalent to 51.6 million tons of carbon dioxide. The station will alsobe able to power electricity consumption for 75 million people.

    Reading

    Check

    1. Paragraph 2 mainly tells us that Baihetan Hydropower Station .

    A. has been a great technical success

    B. has so far brought huge economic benefits

    C. will go into full operation in the near future

    D. is of great help to Chinas green development

    2. Whats the total capacity of Baihetan Hydropower Station?

    A. 14 million kilowatts. B. 16 million kilowatts.

    C. 10 billion kilowatts. D. 62.4 billion kilowatts.

    3.“Mount Qomolangma”is mentioned in the text to indicate .

    A. the efficiency of Baihetan Hydropower Station

    B. the power amount of Baihetan Hydropower Station

    C. the technical difficulty of Baihetan Hydropower Station

    D. the geological position of Baihetan Hydropower Station

    4. How does the author support a theory in the last paragraph?

    A. By giving examples. B. By using specific data.

    C. By starting arguments. D. By providing details.

    Language

    Study

    Ⅰ. Difficult sentence in the text

    The power amount equals that produced by burning about 3.06 million metric tons ofstandard coal, and represents a reduction of about 8.38 million tons of carbon dioxide,which adds a great deal to Chinas green transformation in economic and social develop?ment and its goal of peaking carbon dioxide emissions by 2030 and reaching carbon neu?trality by 2060. 這個發(fā)電量相當(dāng)于燃燒約306萬噸標(biāo)準(zhǔn)煤產(chǎn)生的電量,并減少了約838萬噸的二氧化碳,為我國經(jīng)濟(jì)社會發(fā)展的綠色轉(zhuǎn)型和2030年前實現(xiàn)碳達(dá)峰、2060年前實現(xiàn)碳中和的目標(biāo)提供了有力保障。

    【點石成金】本句是一個復(fù)合句。that為代詞;produced... standard coal為分詞短語作代詞that的后置定語;第一個and連接并列謂語equals和represents;which引導(dǎo)非限制性定語從句;第三個連詞and連接前面介詞to的賓語Chinas green transformationin economic and social development 和its goal of peaking carbon dioxide emissions by2030 and reaching carbon neutrality by 2060;最后一個and連接goal后面介詞of的兩個賓語。

    Ⅱ. Text?centered chunks

    under construction 在建設(shè)中

    go into operation 投入運營

    aim to do sth 力爭做到某事

    be equivalent to 等同于……

    猜你喜歡
    主題復(fù)合句分詞
    閱讀主題二:四季之美
    【短文篇】
    本期主題:月
    本期主題:寒
    復(fù)合句(狀語從句)連詞
    結(jié)巴分詞在詞云中的應(yīng)用
    智富時代(2019年6期)2019-07-24 10:33:16
    值得重視的分詞的特殊用法
    新目標(biāo)英語九年級UnitStep 2
    高考分詞作狀語考點歸納與疑難解析
    論英語不定式和-ing分詞的語義傳承
    中牟县| 临西县| 阿拉善右旗| 莆田市| 响水县| 永福县| 滨州市| 醴陵市| 和田市| 运城市| 武穴市| 东方市| 商南县| 仪征市| 九寨沟县| 营山县| 白玉县| 察雅县| 三台县| 莎车县| 浏阳市| 铜鼓县| 沧州市| 新竹县| 宜兴市| 镇雄县| 宝山区| 和田县| 台安县| 墨江| 雷波县| 通化市| 全州县| 榆树市| 民勤县| 汨罗市| 清水县| 丹巴县| 新宁县| 陵川县| 琼海市|