• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Optimizing the capacity of standalone hybrid renewable energy power generation system by improved artificial bee colony algorithm

    2020-09-20 13:44:30YangYongLiRongGuoSuLiuDeyou
    關(guān)鍵詞:缺電蜂群差分

    Yang Yong, Li Rong, Guo Su, Liu Deyou

    Optimizing the capacity of standalone hybrid renewable energy power generation system by improved artificial bee colony algorithm

    Yang Yong1,2, Li Rong1,2※, Guo Su2, Liu Deyou2

    (1.,,211167,; 2.,210098,)

    To obtain the optimal capacity and analyze the relationship between the optimal Levelized Cost of energy and the loss of power supply probability of a wind/photovoltaic/battery hybrid power generation system, a capacity optimization method based on an improved artificial bee colony algorithm was proposed. Firstly, the component models of the hybrid power generation system (wind turbine, photovoltaic, battery, and grid loads) were established and the rule-based energy management strategy was carefully designed to coordinate the different components of the hybrid power generation system. According to whether the electric power generated and converter capacity was sufficient, the energy management strategy was designed as four scenarios and the corresponding rules were designed; Secondly, the model for the capacity optimization problem was built with the objective function of minimizing the Levelized Cost of energy, where the requirement of satisfying the loss of power supply probability was handled as a constraint; Lastly, the penalty function method was applied to handle the loss of power supply probability constraint and an improved artificial bee colony was applied to improve the accuracy of the solution to the capacity optimization problem. In the algorithm, differential evolution operators were introduced to balance the bees’ ability of exploration and exploitation in different stages of the optimization process and a new food source could be generated by differential evolution operators with a probability increasing adaptively with the iterations in the employed bee stage. To verify the effectiveness of the algorithm, contrast tests with artificial bee colony and differential evolution were performed. The comparison results showed the proposed algorithm had better accuracy, robustness, and convergence rate. Then, to obtain the relationship between the optimal Levelized Cost of energy and the loss of power supply probability, capacity optimizations of the hybrid system was performed under the different loss of power supply probability requirements, which was changed from 0 to 5% with an equal step of 0.1%. Results showed that the Levelized Cost of energy decreases with the increase of loss of power supply probability and the descent rate was gradually decreased. This implied that it could obtain more obvious economic benefits by reducing the reliability requirement appropriately when the loss of power supply probability was at a smaller value. Furthermore, the influence of main parameters, such as the initial capital of the main component (wind turbine, photovoltaic, and battery) and meteorological resources (annual average of solar radiation and wind speed) on the Levelized Cost of energy was carried out by sensitivity analyses. The sensitivity analyses of the initial capital of the components were carried out by capacity optimizations of the hybrid system with different initial capital values of (wind turbine, photovoltaic, and battery system), which were changed from 60% to 140% of their best estimate value, the results showed that the influence of initial capital on the Levelized Cost of energy presented a linear relationship, the line of the photovoltaic was with the highest slope, and the line of the battery had the lowest slope. This implied that it could generate more obvious economic benefits by reducing the photovoltaics’ initial capital. The sensitivity analyses of the meteorological resources were carried out by capacity optimizations of the hybrid system with different annual average values of solar radiation and wind speed, which were changed from 80% to 120% of their best estimate value, the results showed that the influence of meteorological resources on the Levelized Cost of energy presented a linear relationship, and the slope of wind speed was higher than that of the solar radiation. This implied that it should pay more attention to the wind resource evaluation.

    renewable energy resources; optimization; algorithms; hybrid power generation system; artificial bee colony algorithm; differential evolution operators; optimal sizing; sensitivity analysis

    0 Introduction

    Nowadays, the interests of using renewable energy were increased as the conventional fuel reserves were finite and depleting rapidly. Due to the complementary characteristics of wind resources and solar resources, the Hybrid Renewable Energy System (HRES) consisted of Photovoltaic (PV) and Wind Turbine (WT) became a popular choice to meet the electricity demand in remote and island areas[1]. The integration of energy storage systems, such as Battery System (BS), or conventional energy resources, such as Diesel Generators (DG) improved the reliability of the HRESs[2]. For HRESs, capacity optimizing was a key factor to attain a reliable supply at a low cost[3], but it was a complicated task because the optimal configuration depended on the knowledge of energy sources, technical specifications, environmental conditions, and load profiles[4].

    The optimal sizing methodologies reported so far could be categorized into three classes: classical algorithms, software tools, and modern techniques[5]. Classical algorithms were based on mathematical derivation, theoretical analysis, and calculations. Nogueira et al.[6]presented a sizing methodology based on simulation tools and linear programming for an autonomous PV-WT hybrid system achieving minimum cost and high reliability, and statistical models based on Beta and Weibull were applied for the solar and wind power. A Mixed-Integer Linear Programming (MILP) model for an isolated PV-WT-BS-DG hybrid system was presented[7]. The optimal sizing problem with load response considered was established in the MILP framework and solved by combining of Hybrid Optimization Model for Electric Renewables (HOMER) and the General Algebraic Modeling System (GAMS)[8]. A double-layer decision model for the storage capacity configuration of PV-WT-BS HRES was established and solved by dynamic programming[9].

    Many researchers used software tools to design and optimize HRES. HOMER[10]developed by National Renewable Energy Laboratory (NREL) was one of the most popular softwares. It was capable of simulating and optimizing energy systems including renewable and conventional sources, and energy storage systems for both standalone and grid-connected modes[11-12]. HOMER was used for techno-economic optimization and analysis of a PV-BS HRES[13]. System performance of a PV-DG-BS HRES based on technical, economic, and environmental constraints, was analyzed by HOMER[14]. Rajbongshi et al.[15]focused on the design of a PV-BS-DS HRES and the system configuration was optimized under different load profiles. The optimum performance of a fuel cell and PV HRES for standalone applications were calculated by HOMER, where components capital and replacement cost used by HOMER was computed by the fuzzy logic program[16]. However, the software had the limitations that it performed only a single-object optimization and the input variables should be inserted by the user[11].

    Modern methods, applying swarm intelligence to optimize the component size of the HRES, were more flexible in dealing with complex optimization problems and could achieve more accurate results[5]. A hybrid algorithm integrated Genetic Algorithm (GA) with Particle Swarm Optimization (PSO) and a multi-objective PSO algorithm was applied for the optimal sizing of a WT-PB-BS HRES[17]. Singh et al.[18]applied an Artificial Bee Colony (ABC) algorithm to detect out the optimum hybrid system configuration for a PV-biomass HRES with the least Levelized Cost of Energy (LCOE) and proved that the ABC algorithm provided better results as compared with HOMER. The harmony search algorithm was applied to the optimal configuration for a PV-WT-fuel cell-biomass HRES and sensitivity analysis of the initial capital cost of the fuel cell was also studied[19]. Sharma et al. applied grey wolf optimization for optimal sizing of PV-WT-BS HERS and pointed out that grey wolf optimization outperformed several existing optimization techniques such as GA, PSO, and tabu search algorithm[20]. A multi-objective self-adaptive Differential Evolution (DE) algorithm was applied for the optimal sizing of a PV-WT-DS-BS HRES in Yanbu, Saudi Arabia[21]. Minimizing the life cycle cost, CO2emissions, and dump energy were considered simultaneously for the optimal sizing of PV-WT-DS-BS HRES and was solved by GA[22]. The non-dominated sorting genetic algorithm was used in the design of a standalone PV-WT-BS HRES with objective functions of total cost minimization and reliability index maximization, and uncertainties of renewable resources were addressed by chance-constrained programming[23].

    With the rapid development of HRES, intelligent optimization algorithms with better performance were urgently needed. ABC was a relatively new stochastic swarm intelligence optimization inspired by the foraging behavior of honey bee and had shown promising performance on various complex optimization problems[24-27]. However, ABC performed well in exploration but relatively poorly in exploitation, which led to a slow convergence[28]. A possible explanation might be that ABC exploited its solution search equation to generate the new solution by changing one variable at a time[29]. Unlike ABC, DE generated the new solution by differential operators, i.e., mutation and crossover, which ensured that at least one variable was changed at a time. Accordingly, DE tended to exploit well and showed a fast convergence rate[30-31]. From this perspective, the performance of the optimization algorithm might be improved by hybridizing ABC with DE.

    In this study, a hybrid ABC algorithm with DE (namely ABCDE) was applied to the capacity optimization of WT-PV-BS HRES located in a remote area in Xining, China. In the algorithm, the candidate solution could be generated by mutation and crossover according to an adaptive increased probability during the employed bee stage and its effectiveness was verified by contrast tests with ABC and DE. Then, the techno-economic analysis of the HRES was presented and the relationship between reliability and economy of the hybrid energy system was obtained by solving the optimization problem under the different Loss of Power Supply Probability (LPSP) requirements. Furthermore, sensitivity analyses were performed to research the influence of the initial capital of the main component (PV, WT, and BS) and meteorological resources (annual mean value of solar radiation and wind speed) on the LCOE.

    1 Mathematical model and energy management strategy

    The structure diagram of the HRES was shown in Fig.1. It consisted of five major components: PV systems, WT systems, a converter, BS, and grid loads.

    Fig.1 Structure diagram of the Hybrid Renewable Energy System (HRES)

    1.1 Component model

    1.1.1 Wind turbine

    1.1.2 PV panel

    1.1.3 Battery bank

    where Δrepresented the interval of adjacent periods, h.

    Moreover, the battery’s state of charge should satisfy the constraint described as Eq.(7)

    1.1.4 Loads

    1.2 Energy management strategy

    To meet grid load requirements as much as possible, a rule-based Energy Management Strategy (EMS) coordinating components’ output power of the HRES was designed. In this study, the Loss of Power Supply (LPS, kW) caused by the shortage of electric power generated and converter capacity were both considered.

    pwas defined to indicate whether the electric power generated was sufficient and was calculated by Eq. (9). Ifpwas large than 0, it meant electric power generated was sufficient.

    cwas defined to indicate whether the converter capacity was sufficient and was calculated by Eq. (10). Ifcwas larger than 0, it meant converter capacity was sufficient.

    According to the combination values ofpandc, the rule-based EMS was designed as 4 cases.

    and the extra energy calculated by Eq. (12) would charge the batteries as case 1.

    1.3 Objective function and constrains

    The objective function of the optimal problem shown as Eq. (16) was minimizing LCOE (lcoe, $/kWh) while satisfying the reliability requirement represented by LPSP (lpsp, %).

    LCOE of the HRES could be calculated by Eq. (17)

    wherendenoted the nominal discount rate, %; idenoted the expected inflation rate, %.

    LPSP of the HRES was calculated by Eq. (27)

    where T=8 760 h was the total number of cycles.

    2 The algorithm ABCDE

    2.1 The conventional ABC

    In ABC, the solutions to the problem were represented by food resources. The process of seeking the optimal solution was similar to that of seeking the best food resources by bees. The bees in the algorithm were divided into three categories, that was employed bees, onlooker bees, and scout bees. ABC included 4 basic stages namely the initialization stage, employed bee stage, onlooker stage, and scout bee stage.

    1) Initialization stage and fitness function

    After initialization, the fitness of the food resource could be calculated by Eq.(29)

    2) Employed bee stage

    In this stage, each food resource was exploited by one employed bee, and a new candidate food resource could be generated by Eq.(30)

    wherewas randomly chosen from {1,2,…,};() was randomly picked up from{1,2,…,SN};was a random number in the range of [-1,1]. Noted that according to Eq.(30), only the-th dimension of the new resource was different from the original one. If the fitness of the new resource was better than that of the original one, replacedby, otherwise,was kept to the next generation.

    3) Onlooker bee stage

    4) Scout bee stage

    If the fitness of a food resource kept unimproved over a predefined time, the associated employed bee abandoned its current food resource and became a scout bee to search a new food resource generated according to Eq. (28). Noted that there was a maximal one scout bee in each generation.

    2.2 The ABCDE

    Differential operations included mutation operators and crossover operators. Many variant mutation operators had been developed, and DE/rand/1 shown as Eq. (33) was chosen

    With regard to crossover operator, there were two frequently-used schemes namely binomial crossover and exponential crossover, and binomial crossover expressed as Eq.(34) was chosen.

    The steps of ABCDE could be summarized as follows:

    Step 3, onlooker bee stage. Assigned onlooker bees for food sources according to their probability calculated by Eq. (31), exploited the food resource by Eq. (30), and updated food source similar to employed bee stage. When all of the onlooker bees had exploited the food resources, set=2×.

    3 Case study

    3.1 Data

    3.2 Algorithm contrast

    where was a number with a large value.

    Table 1 Economic and technical parameters of the component

    In an intelligent optimization algorithm, each individual represented a set capacity of components. For any individual, a one-year continuous simulation of HRES could be performed according to the EMS (section 2.2). After the simulation, the LPSP and LCOE could be calculated, and then the individual’s fitness value was obtained. The evaluation process for each individual of ABC, DE, ABCDE was shown in Fig.3. The optimization results were presented in Table 2, and the convergence curves of the mean values obtained by the three algorithms in 10 runs were shown in Fig.4.

    Note: WT meant wind turbine; PV meant photovoltaic; BS meant battery system; HRES meant hybrid renewable energy system; EMS meant energy management strategy. t denoted the time index; Sp denoted whether the electric power generated was sufficient; Sc denoted whether the converter capacity was sufficient; LPS denoted the loss of power supply, kW; SOCB denoted the state of charge of the battery, kWh; lpsp denoted the loss of power supply probability, %; LCC denoted the life cycle cost, $; lcoe denoted the levelized cost of energy, $·kWh-1.

    Table 2 Optimization results of algorithms

    Fig.4 Convergence curves for the mean values of the levelized cost of energy with different algorithms

    From Table 2 and Fig.4, it could be concluded that ABCDE had better accuracy, robustness, and convergence rate compared with the other reference algorithms.

    3.3 Economic-technical analysis

    Fig.5. Capital distribution for each component of the Hybrid Renewable Energy System (HRES)

    From Fig.6, it can be seen that economy and reliability were contradictory indicators, if the high reliability was required, the investment cost would increase, and the decline rate of LCOE decreased gradually with the growth of LPSP.

    Fig.6 Relationship of Loss of Power Supply Probability (LPSP) and Levelized Cost of Energy (LCOE)

    3.4 Sensitivity analysis

    1) Sensitivity analysis for component initial investments

    Fig.7 Effect of components’ initial capital on the Levelized Cost of Energy (LCOE)

    2) Sensitivity analysis for meteorological resources

    Fig.8 Effect of meteorological resources on the Levelized Cost of Energy (LCOE)

    4 Conclusion

    In this study, optimization of a stand-alone Hybrid Renewable Energy System (HRES) consisted of Wind Turbine (WT)-Photovoltaic (PV)-Battery System (BS) was focused and modeled as a single objective optimization problem. The objective function was to minimize the Levelized Cost of Energy (LCOE) while satisfying the reliability of the Loss of Power Supply Probability (LPSP). In order to get better optimization results, the Artificial Bee Colony algorithm with Differential Evolution operators (ABCDE) algorithm was introduced to solve the optimization problem. The effectiveness of ABCDE was validated by comparing test with Artificial Bee Colony (ABC) algorithm and Differential Evolution (DE) algorithm. Test results showed that ABCDE could achieve more accurate solutions and performed with better convergence speed and robustness. The results got by ABCDE showed that the optimal LCOE was 0.349 4 $/kWh while the LPSP was equal to 3% for the HRES. The relationship of LCOE and LPSP was obtained by changing the maximum allowable LPSP from 0 to 5% with an equal step of 0.1%. From the relationship, it could be seen that economy and reliability were contradictory indicators and the decline rate of LCOE was decreased gradually with the growth of LPSP. Sensitivity analyses for the initial capital of the main components and meteorological resources were also performed. Results showed that the LCOE was most sensitive to the PV initial capital in terms of equipment prices, and was more sensitive to annual mean value wind speed than that of solar radiation. This indicated that it should pay more effort to reduce PV initial capital and to improve the accuracy of wind resource assessment.

    [1] Yang Yong, Guo Su, Liu Deyou, et al. Operation optimization strategy for wind-concentrated solar power hybrid power generation system[J]. Energy Conversion & Management, 2018, 160: 243-250.

    [2] Kyritsis A, Voglitsis D, Papanikolaou N, et al. Evolution of PV systems in Greece and review of applicable solutions for higher penetration levels[J]. Renewable Energy, 2017, 109: 487-499.

    [3] Anoune K, Bouya M, Astito A, et al. Sizing methods and optimization techniques for PV-wind based hybrid renewable energy system: A review[J]. Renewable & Sustainable Energy Reviews, 2018, 93: 652-673.

    [4] Zahraee S M, Assadi M K, Saidur R. Application of artificial intelligence methods for hybrid energy system optimization[J]. Renewable and Sustainable Energy Reviews, 2016, 66: 617-630.

    [5] Monaaf D A. A review on recent size optimization methodologies for standalone solar and wind hybrid renewable energy system[J]. Energy Conversion & Management, 2017, 143: 252-274.

    [6] Nogueira C E C, Vidotto M L, Niedzialkoski R K, et al. Sizing and simulation of a photovoltaic-wind energy system using batteries, applied for a small rural property located in the south of Brazil[J]. Renewable & Sustainable Energy Reviews, 2014, 29(7): 151-157.

    [7] Malheiro A, Castro P M, Lima R M, et al. Integrated sizing and scheduling of wind/PV/diesel/battery isolated systems[J]. Renewable Energy, 2015, 83: 646-657.

    [8] Amrollahi M H, Bathaee S M T. Techno-economic optimization of hybrid photovoltaic/wind generation together with energy storage system in a stand-alone micro-grid subjected to demand response[J]. Applied Energy, 2017, 202: 66-77.

    [9] Li Jianlin, Guo Binqi, Niu Meng, et al. Optimal configuration strategy of energy storage capacity in wind/PV/storage hybrid system[J]. Transactions of China Electrotechnical Society, 2018, 33(6): 1189-1196.

    [10] HOMER Pro Version 3. 7 User Manual[Z], http: //www. homerenergy. com

    [11] Zahboune H, Zouggar S, Krajacic G, et al. Optimal hybrid renewable energy design in autonomous system using modified electric system cascade analysis and homer software[J]. Energy Conversion & Management, 2016, 126: 909-922.

    [12] Lambert T, Gilman P, Lilienthal P. Micropower System Modeling with HOMER[M]. Integration of Alternative Sources of Energy. John Wiley & Sons, Inc. 2006: 379-418.

    [13] Shahzad M K, Zahid A, Rashid T, et al. Techno-economic feasibility analysis of a solar-biomass off grid system for the electrification of remote rural areas in Pakistan using HOMER software[J]. Renewable Energy, 2017, 106: 264-273.

    [14] Halabi L M, Mekhilef S, Olatomiwa L, et al. Performance analysis of hybrid PV/diesel/battery system using HOMER: A case study Sabah, Malaysia[J]. Energy Conversion & Management, 2017, 144: 322-339.

    [15] Rajbongshi R, Borgohain D, Mahapatra S. Optimization of PV-biomass-diesel and grid base hybrid energy systems for rural electrification by using HOMER[J]. Energy, 2017, 126: 461-474.

    [16] Singh A, Baredar P, Gupta B. Techno-economic feasibility analysis of hydrogen fuel cell and solar photovoltaic hybrid renewable energy system for academic research building[J]. Energy Conversion & Management, 2017, 145: 398-414.

    [17] Ghorbani N, Kasaeian A, Toopshekan A, et al. Optimizing a hybrid wind-PV-Battery system using GA-PSO and MOPSO for reducing cost and increasing reliability[J]. Energy, 2017, 154: 581-591.

    [18] Singh S, Kaushik S C. Optimal sizing of grid integrated hybrid PV-biomass energy system using artificial bee colony algorithm[J]. IET Renewable Power Generation, 2016, 10(5): 642-650.

    [19] Heydari A, Askarzadeh A. Techno-economic analysis of a PV/biomass/fuel cell energy system considering different fuel cell system initial capital costs[J]. Solar Energy, 2016, 133: 409-420

    [20] Sharma S, Bhattacharjee S, Bhattacharya A. Grey wolf optimization for optimal sizing of battery energy storage device to minimise operation cost of microgrid[J]. IET Generation Transmission & Distribution, 2016, 10(3): 625-637.

    [21] Ramli M A M, Bouchekara H R E H, Alghamdi A S. Optimal sizing of PV/Wind/Diesel hybrid microgrid system using multi-objective self-adaptive differential evolution algorithm[J]. Renewable Energy, 2018, 121: 400-411.

    [22] Ogunjuyigbe A S O, Ayodele T R, Akinola O A. Optimal allocation and sizing of PV/Wind/Split-diesel/Battery hybrid energy system for minimizing life cycle cost, carbon emission and dump energy of remote residential building[J]. Applied Energy, 2016; 171: 153–171.

    [23] Kamjoo A, Maheri A, Dizqah A M, et al. Multi-objective design under uncertainties of hybrid renewable energy system using NSGA-II and chance constrained programming[J]. International Journal of Electrical Power & Energy Systems, 2016, 74(1): 187-194.

    [24] Sa? T, ?unka? M. Color image segmentation based on multi-objective artificial bee colony optimization[J]. Applied Soft Computing, 2015, 34: 389-401.

    [25] Li Xianneng, Yang Guangfei. Artificial bee colony algorithm with memory[J]. Applied Soft Computing, 2016, 41: 362-372.

    [26] Li Junqing, Pan Quanke, Duan Peiyong. An improved artificial bee colony algorithm for solving hybrid flexible flow shop with dynamic operation skipping[J]. IEEE Transactions on Cybernetics, 2016, 46(6): 1311-1324.

    [27] Zhang Xin, Zhang Xiu, Wang Lei. Antenna design by an adaptive variable differential artificial bee colony algorithm[J]. IEEE Transactions on Magnetics, 2018, 54(3): 1-4.

    [28] Karaboga D, Gorkemli B. A quick Artificial Bee Colony (qABC) algorithm and its performance on optimization problems[J]. Applied Soft Computing, 2014, 23: 227-238.

    [29] Liang Zhengping, Hu Kaifeng, Zhu Quanxiang, et al. An enhanced artificial bee colony algorithm with adaptive differential operators[J]. Applied Soft Computing, 2017, 58: 480-494.

    [30] Li Genghui, Lin Qiuzhen, Cui Laizhong, et al. A novel hybrid differential evolution algorithm with modified CoDE and JADE[J]. Applied Soft Computing, 2016, 47: 577-599.

    [31] Opara K, Arabas J. Comparison of mutation strategies in differential evolution-A probabilistic perspective[J]. Swarm & Evolutionary Computation, 2018, 39: 53-69.

    改進(jìn)人工蜂群算法的孤島混合可再生能源發(fā)電系統(tǒng)容量?jī)?yōu)化

    楊 勇1,2,李 榮1,2※,郭 蘇2,劉德有2

    (1. 南京工程學(xué)院能源與動(dòng)力工程學(xué)院,南京 211167;2. 河海大學(xué)水利水電學(xué)院,南京 210098)

    容量?jī)?yōu)化對(duì)提高風(fēng)電-光伏-電池混合發(fā)電系統(tǒng)的經(jīng)濟(jì)性和可靠性具有重要意義。為進(jìn)一步提高容量?jī)?yōu)化的精度,本研究提出了一種基于改進(jìn)蜂群算法的容量?jī)?yōu)化方法。首先,在建立組件模型、設(shè)計(jì)能源管理規(guī)則庫(kù)的基礎(chǔ)上,以最小化單位度電成本為目標(biāo),以系統(tǒng)缺電率為約束,建立了混合發(fā)電系統(tǒng)容量?jī)?yōu)化模型;其次,通過在蜂群算法雇傭蜂階段中引入差分進(jìn)化算子,提出了一種改進(jìn)蜂群算法的模型求解方法,并通過與蜂群、差分進(jìn)化算法對(duì)比,驗(yàn)證了改進(jìn)蜂群算法的有效性;最后,分別在不同缺電率要求下優(yōu)化混合系統(tǒng)容量,得出了單位度電發(fā)電成本與缺電率的關(guān)系,并通過靈敏度分析,研究了設(shè)備價(jià)格,氣象等因素對(duì)單位度電成本的影響。結(jié)果表明,在缺電率為3%時(shí),混合系統(tǒng)總投資成本為779 564.26 美元($), 其中,光伏、風(fēng)電、電池及變換器成本分別占總成本的33%、29%、34%和3%,單位度電成本為0.349 447 $/kWh;單位度電成本隨缺電率增加而下降且下降速率逐漸降低;單位度電成本在組件價(jià)格方面受光伏組件價(jià)格影響更明顯,在氣象方面,受風(fēng)速均值影響更明顯。該研究成果可為科學(xué)設(shè)計(jì)混合系統(tǒng)容量,促進(jìn)風(fēng)、光資源互補(bǔ)利用提供科學(xué)依據(jù)。

    可再生能源;優(yōu)化;算法;混合發(fā)電系統(tǒng);人工蜂群算法;差分進(jìn)化算子;容量?jī)?yōu)化;靈敏度分析

    Yang Yong, Li Rong, Guo Su, et al. Optimizing the capacity of standalone hybrid renewable energy power generation system by improved artificial bee colony algorithm[J]. Transactions of the Chinese Society of Agricultural Engineering (Transactions of the CSAE), 2020, 36(15): 217-226. (in English with Chinese abstract)doi:10.11975/j.issn.1002-6819.2020.15.027 http://www.tcsae.org

    楊勇,李榮,郭蘇,等. 改進(jìn)人工蜂群算法的孤島混合可再生能源發(fā)電系統(tǒng)容量?jī)?yōu)化[J]. 農(nóng)業(yè)工程學(xué)報(bào),2020,36(15):217-226. doi:10.11975/j.issn.1002-6819.2020.15.027 http://www.tcsae.org

    2019-12-05

    2020-04-20

    Natural Science Foundation of China (51706093); Natural Science Foundation of Jiangsu Province (BK20181308); Fundamental Research Funds for the Central Universities (2018B45414)

    Yang Yong, PhD, Lecturer, research interests: hybrid system capacity optimization. Email:542450062@qq.com

    Li Rong, PhD, Lecturer, research interests: hybrid power generation system scheduling. Email:njit_lr@njit.edu.cn

    10.11975/j.issn.1002-6819.2020.15.027

    TK83

    A

    1002-6819(2020)-15-0217-10

    猜你喜歡
    缺電蜂群差分
    數(shù)列與差分
    “蜂群”席卷天下
    空調(diào)改電扇,島內(nèi)應(yīng)對(duì)缺電危機(jī)
    改進(jìn)gbest引導(dǎo)的人工蜂群算法
    基于差分隱私的大數(shù)據(jù)隱私保護(hù)
    蜂群夏季高產(chǎn)管理
    相對(duì)差分單項(xiàng)測(cè)距△DOR
    太空探索(2014年1期)2014-07-10 13:41:50
    差分放大器在生理學(xué)中的應(yīng)用
    我有我味道
    還我光明
    义马市| 三都| 无为县| 霞浦县| 富裕县| 贡嘎县| 大姚县| 甘南县| 镶黄旗| 阜新| 石城县| 屏东县| 芦溪县| 九台市| 博罗县| 丹凤县| 左权县| 临沂市| 隆安县| 博白县| 太白县| 寻甸| 盘山县| 华亭县| 龙游县| 克什克腾旗| 重庆市| 云龙县| 白沙| 南城县| 册亨县| 九寨沟县| 黄大仙区| 屏东县| 鹤岗市| 天门市| 尤溪县| 长汀县| 北票市| 衢州市| 鸡东县|