    (China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, Shaanxi, China)

    0 Introduction

    Lanzhou-Chongqing Railway is a major railway that represents the centenary dream of Chinese and connects the Southwest China and Northwest China. It is located in the northeast margin of the Tibetan Plateau, where the geological environment is very complicated under the impact of plate activities and compression. Transformed by the very-low-grade metamorphism and strong deformation of multiple periods and affected by faults, tectonic structures, and geostress fields, etc., large deformed soft rock and quick sand were formed. The geology was evaluated as "a global challenge that is infrequent both in China and abroad". As a result, both the design and construction of this railway were special. The current codes and standards were inapplicable and there was no precedent. A special design became the critical factor that determined the success of Lanzhou-Chongqing Railway[1]. In addition, the full-face hard-rock tunnel boring machines (TBMs) used for West Qinling Tunnel of Lanzhou-Chongqing Railway were the railway TMB with the largest diameter in China. Compared with other TBMs, they had much larger diameter and longer tunneling distance. Their adaptability requirement was more stringent, and the related supporting technology determined the TBM tunneling speed.

    In the process of continuous development of construction of transport facilities in China, we have to face more and more long, large, deep, and difficult tunnel projects and more and more geological hazards and complicated geological conditions. The construction difficulty is ever growing. By taking tunnels on Lanzhou-Chongqing Railway in complicated geology as examples, the technological problems and construction technologies related to the Tertiary aquiferous quick sand, large deformation of soft rock, as well as safe, fast and long-distance tunneling by large-diameter TBMs are elaborated so as to provide reference and guide for the design and construction of tunnels in the future.

    1 Project overview

    1.1 Tunnel overview

    With a design speed of 200 km/h, Lanzhou-Chongqing Railway, a class-I electrified double-track railway, is an important part of Chongqing-Xinjiang-Europe-Interna tional Railway under Belt and Road Initiative and the most convenient passage that connects the Southwest China and Northwest China. The 492 km-long Lanzhou-Guangyuan Section has 66 tunnels with a total length of 343 km, including 9 over-10 km-long tunnels. Among the tunnels, West Qinling Tunnel with a length of 28.236 km is the longest tunnel and the critical works of Lanzhou-Chongqing Railway Project. It is also the second longest railway tunnel completed in China and the railway tunnel constructed by TBMs with the largest diameter (10.23 m) in China.

    The construction of Lanzhou-Guangyuan Section of the railway was commenced in 2008, and the section of the railway was put into operation in September 2017. It shortens the Lanzhou-Chongqing transport distance from 1 466 km to 855 km and the passenger train traveling time from 22 hours to 6.5 hours.

    1.2 Geological background

    Lanzhou-Chongqing Railway is located in the junction zone of the Qinghai-Tibet Plate, Yangtze Plate, North China Plate, etc. (see Fig. 1) with very special and complicated geological background. Especially, the collision between Eurasian Plate and Indian Plate, in addition to the uplift and northeastward compression and extension of Qinghai-Tibet Plate, leads to the high and variable initial geostress and developed folds and fractures in the railway site.

    Fig. 1 Regional geological background of Lanzhou-Chongqing Railway

    1.2.1 Special geological structures

    Lanzhou-Guangyuan Section is located in the margin of Tibetan Plateau, where the geological activities are frequent. Under the impact of the geological activities in multiple periods, the geological environment becomes complicated and the regional structures develop very well. Along the line, there are 10 regional major fractures, 87 relatively major faults, 43 folds and developed secondary faults, minor structures and folds.

    1.2.2 Complicated and variable geostress fields

    Affected by the uplift of Tibetan Plateau and compression between plates, the geostress fields of Lanzhou-Guangyuan Section are very complicated and variable. The maximum measured geostress of Lanzhou-Minxian Section in north-east direction is 27.16 MPa and that of Minxian-Guangyuan Section in north-west direction is 33.82 MPa (see Fig. 2). The surrounding rocks of the tunnels in several places are under very high geostress.

    Fig. 2 Distribution of geostress direction along Lanzhou-Chongqing Railway

    2 Key points and difficulties

    Tertiary aquiferous silty fine sandstone and high geostress soft rock encountered during the construction of Lanzhou-Chongqing Railway are infrequent both in China and abroad, and they are special and complicated environment. The current codes and standards are inapplicable and a special design is required. Meanwhile, how to make the large-diameter TBMs operate safely, fast and efficiently through a long distance is another task.

    2.1 Tertiary aquiferous silty fine sandstone

    The Tertiary clayey aquiferous silty fine sandstone with weak cementation is evaluated as "unfavorable rock" by experts. The rock has poor diagenesis. It is the transitional stratum between rock and sand, with properties of rock and sand. It is in the state of rock when undisturbed and in the state of sand when disturbed. It will quickly be softened and become pasty in contact with water. Often accompanied with water and sand gushing, cavity may be formed in the rock behind the support, which makes the support system crack or collapse and thus leads to high construction difficulty and risk (see Fig. 3). The total length of such strata is about 8 km long, located in 3 tunnels, including Humaling Tunnel and Taoshuping Tunnel.

    2.2 Soft rock under high geostress

    Along Lanzhou-Chongqing Railway, the total length of the soft rock under high geostress is about 83 km, located in 12 tunnels. The soft rock under high geostress is mainly composed of the Silurian phyllite and carboniferous phyllite, the Permian and Triassic slate and carboniferous slate, etc. with a low strength and soft texture. The high geostress often caused large squeezing deformation. Long cracking and intrusion of primary support and torsion and damage of steel supports happened (see Fig. 4), and in some areas, the secondary lining cracked and was damaged. It was very difficult to control the deformation, which seriously endangered the construction and operation safety. The typical tunnels include the Muzhailing Tunnel, Liangshui Tunnel, Xinchengzi Tunnel, Maoyushan Tunnel, Majiashan Tunnel, Tongzhai Tunnel, and Zhifang Tunnel, etc.

    2.3 Fast long-distance tunneling by large-diameter TBMs

    West Qinling Tunnel on Lanzhou-Chongqing Railway has a length of about 28.236 km and maximum overburden of about 1 400 m. Restricted by the topography, it is impossible to build access adit and so the tunnel is a deep-covered long tunnel passing through various stratum and lithology with different rock integrity and geological units. In the design, two large-diameter TBMs (see Fig. 5) were adopted for construction. There were such technological challenges as TBM adaptability, mucking mode, parallel lining, and construction ventilation of the long tunnel.

    (a) Unstability of tunnel face

    (b) Deformation and crack of primary suppnt

    Fig. 3 Deteriorated and instable tertiary sandstone & deformed and damaged support

    (a) Squeezing deformation of H175 shaped steel

    (b) Cracking and intrusion of support

    Fig. 5 TBM for West Qinling Tunnel

    3 Innovation achievements

    3.1 Construction technology for tunnel in Tertiary clayey aquiferous silty fine sandstone with weak cementation

    3.1.1 Study of physical properties and mechanical parameters

    3.1.1.1 Mechanical parameters

    The physical and mechanical properties of the Tertiary aquiferous silty fine sandstone with weak cementation (Fig. 6 and 7) are ascertained to lay a theoretical foundation for the design and construction of the tunnels. The test showed that the permeability coefficient of the Tertiary aquiferous silty fine sandstone sample is similar to that of silty soil, and is much less than that of the common fine sand and even the silty sand strata. Its strength declines with the growth of its moisture content. Where the moisture content exceeds the plastic-limit moisture content, the surrounding rock becomes plastic and loses its strength[2].

    Fig. 6 Grading curves of soil samples of different inclined shafts

    3.1.1.2 Micro-structure variation laws

    Water significantly affects its stability. Before deformation and flow, the matrix particles are granular (see Fig. 8), the pores are dominated by off-contact pores, particles contact each other at points and the structure is relatively stable; with rheological behavior, the point contact between particles disappears, small-and medium-sized particles increase sharply, various flocculent sediments settle on the pore margin, and the sand layer becomes plastic and is deformed.

    Fig. 7 Permeability factors of soil samples of different inclined shafts

    (a) Before flowing deformation

    (b) After flowing deformation

    3.1.2 Study of water-related stability and critical deformation rule

    The water-related stability mechanism of the Tertiary aquiferous silty fine sandstone with weak cementation is ascertained (see Fig. 9): in the case of low moisture content, sandstone particles are under equilibrium load and stable state; in the case of high moisture content, the structure is damaged, and the particles may be easily plastically deformed or rheological behavior occurs. The field tests at 11 working faces showed that the moisture content of 12%-16% 3-5 h after excavation is the critical point of plastic deformation of surrounding rock and the moisture content of 18%-19% 7-10 h after excavation is the critical point of rheological behavior of surrounding rock.

    Fig. 9 Variation of moisture content of sandstone before dewatering

    3.1.3 Study of comprehensive dewatering technology

    The strength of the sandstone obviously declines with the moisture content, which eventually leads to flowing sand. Therefore, it′s necessary to develop a reasonable dewatering technology to keep the moisture content of the sandstone below the critical moisture content so as to ensure the stability of the surrounding rock. Tests on advance dewatering and post dewatering were carried out on the site: in the case of excavation before dewatering, it took consecutive 24 h for dewatering to make the moisture content below the plastic limit (see Fig. 10), while in the case of advance dewatering, the moisture content remained around 5%, which is much lower than the critical moisture content, and the sandstone exhibited a good stability (see Fig. 11)[3].

    Fig. 10 Excavation before Dewatering

    Fig. 11 Advance vacuum dewatering

    A comprehensive dewatering technological system integrating deep surface wells and vacuum light well points in tunnel is built (see Fig. 12); for areas with high cohesive particle content, high moisture content and thick aquifer where it was difficult to obtain the desired effect only by dewatering in tunnel, the technology of advance dewatering by surface wells with large depth (more than 200 m) and the well forming technology were applied to the silty fine sand stratum. In this way, the effective dewatering funnel was made (see Fig. 13) to lower the water head of the Tertiary aquiferous silty fine sandstone and the moisture content of the surrounding rock. The practice proved that the surface dewatering was effective. Before surface dewatering, the monthly tunneling rate was about 6-7 m; after surface dewatering, the monthly tunneling rate was increased to 15-20 m.

    Fig. 12 Layout of light well point dewatering pipes in tunnel

    Fig. 13 Surface dewatering well

    3.1.4 Construction technology of advance reinforcement by full-face horizontal jet grouting piles

    The construction technique of advance reinforcement by horizontal jet grouting for tunnels in aquiferous silty fine sand is developed. For the exit section of Taoshuping Tunnel, high-pressure horizontal jet grouting was applied for the excavation contour scope, and the reinforcement by fiberglass anchor bolts+horizontal jet grouting piles was applied to the working face (Fig. 14). After the reinforcement, bench excavation method can be used, which is characterized by high mechanization and fast construction.

    (b) Working site

    3.1.5 Study of tunnel construction technology in Tertiary aquiferous silty fine sandstone with weak cementation

    3.1.5.1 Characteristics of loads of surrounding rock

    The tunnel in aquiferous sandstone with weak cementation may be quickly deformed after excavation and its deformation is difficult to control. To provide theoretical support for the design and construction of the tunnel, field tests on the surrounding rock pressure, contact pressure, and concrete stress, etc. are made. The tests showed that the surrounding rock pressure of the Tertiary sandstone is saddle-shaped (Fig. 15) and characterized by high surrounding rock pressure at the spring lines on both sides and low surrounding rock pressure at the crown.

    3.1.5.2 Construction method

    In line with the characteristics of the pressure of the Tertiary surrounding sandstone, the supporting rigidity was enhanced in the design. The Ⅰ25 shaped steel arches were used. For areas suffering serious flowing sand and large deformation, two-layer supporting was employed; according to such parameters as the cohesive particle content, permeability factor, cohesion and frictional angle at each working area, the cross diaphragm (CRD) method and double-side heading construction method were used. Orderly construction can be obtained by using each of the construction methods. However, the double-side heading construction method is recommended for areas with high moisture content and serious liquefaction (Fig. 16). Based on the surrounding rock characteristics of working area of inclined shaft #3, the construction method combining advance dewatering in the double-side heads and CRD on the upper bench (Fig. 17) is designed.

    Fig. 15 Distribution of surrounding rock pressure (unit: MPa)

    Fig. 16 Nine-step double-side heading method

    Fig. 17 Double-side heading construction method

    3.2 Deformation control technology for tunnels with large deformation in soft rock under high geostress

    3.2.1 Classification of large deformation

    At present, there are many deformation classification methods for tunnels with large deformation in soft rock under high geostress. However, many factors control the large deformation[4], and it is very difficult to use one method or indicator to evaluate the deformation scale or class in advance. Common large deformations are classified according to the total deformation class of the primary support during the construction, and this is a kind of passive classification that cannot reflect the real conditions of the surrounding rock because it is significantly affected by construction. As a result, based on the previous deformation classification method for squeezing surrounding rock in combination with matching between the supporting and deformation during construction in squeezing surrounding rock, the method integrating advance evaluation and classification for deformation potentiality of squeezing surrounding rock in design and classification for dynamic adjustment in construction is developed[5].

    3.2.1.1 Advance evaluation of deformation potentiality in design

    In the design, according to geological conditions and previous cases of tunnel with large deformation, the advance large-deformation evaluation is carried out and the deformation potentiality classification method with the strength-stress ratio as the major indicator for soft rock tunnels with large deformation is established (see Table 1).

    Table 1 Deformation potentiality classification method for soft rock tunnels with large deformation on Lanzhou-Chongqing Railway

    ClassoflargedeformationStrength?stressratioRelativedeformation/%Ⅰ0.25-0.151.5-3Ⅱ0.15-0.13-5Ⅲ <0.1>5

    3.2.1.2 Dynamic adjustment in construction

    In the construction, according to surrounding rock characteristics revealed by the working face and adjacent sections, the large deformation potentiality is evaluated (see Table 2); through the real-time monitoring, the deformation process of the squeezing surrounding rock is monitored and traced and the portentous information prior to the occurrence of large deformation and the deformation rule is obtained. Then, a further evaluation on the deformation is made by using two indicators, i.e., the deformation amount and deformation rate (see Table 3). Meanwhile, the matching between the supporting and surrounding rock is evaluated according to the supporting damage conditions (see Table 3) and the supporting parameters are adjusted and optimized accordingly to realize dynamic design and adjustment[6].

    Table 3 validation criteria for large deformation classification of soft rock tunnels of Lanzhou-Chongqing Railway

    Remarks: Crown settlement can be considered as per 50% of the horizontal convergence.

    3.2.2 Technical countermeasures

    3.2.2.1 Testing in advance

    According to the principle of "testing in advance for special and complicated works", the tests are made to validate the supporting parameters and section types corresponding to the deformation potentiality classification established in the design, the deformation and supporting loads are monitored, and the parameters and deformation control measures are duly adjusted according to the test results. The displacement in front of the working face in railway tunnels is measured for the first time (see Fig. 18) and the advance deformation rule ahead of the working face of tunnels in soft rock is mastered.

    3.2.2.2 Deformation control technology

    The study shows that the large deformation of Lanzhou-Chongqing Railway belongs to large structural squeezing deformation caused by energy accumulation, transfer and release under the control of structures as well as shearing and shifting of structures. Therefore, according to the genesis mechanism of large squeezing deformation, a comprehensive deformation control technology combining the active stress release and passive control is developed. It includes: (1) active energy release and consumption; (2) surrounding rock improvement and reinforcement to increase its bearing capacity and energy storage capacity; (3) improvement of resistance and adaptability to deformation of supporting system.

    (a) Pipe burying

    (b) Test operation

    Fig. 18 Measurement of longitudinal displacement in surrounding rock of working face

    (1) Active release

    Based on the deformation classes, we increased the deformation allowance according to the conditions revealed by working face excavation and the actual deformation conditions. For sections with high predicated deformation class, we made large advance boring and advance pilot when necessary to facilitate active stress release (Figs. 19 and 20). For the ridge core section of Muzhailing Tunnel, to solve the problem of large deformation and repeated primary support removal/replacement, we made the advance pilot for stress release and succeeded in the construction of ridge section with large deformation, reducing the primary support removal/replacement.

    Fig. 19 Stress release by large advance boring

    (2) Improvement and reinforcement of surrounding rock

    The short, medium and/or long anchorage/grouting system are used to improve the surrounding rock in phases and steps and enhance the bearing capacity (Fig. 21). This method was successfully used for Xinchengzi Tunnel, the first station tunnel with super-large cross-section (with an excavation cross-section area of 340 m2) in soft rock with high geostress.

    Fig. 20 Stress release by advance pilot

    Fig. 21 Anchorage system

    (3) Improvement of resistance and deformation adaptability of supporting system

    For sections with high predicated deformation class, the multi-layer supporting system was built in layers to make the supporting system yielding; the cross-section type to put the structural cross-section under reasonable loads is adjusted so as to adapt to the surrounding rock deformation. For the first time, an energy-absorption buffer structure is used in the design of tunnels in soft rock with high geostress (see Fig. 22). The buffer structure can enhance the energy-absorption capacity of the supporting system in sections where the deformation cannot be stabilized, and can prevent stress centralization so as to put the structure under even loads.

    Regarding Muzhailing Tunnel on Lanzhou-Chongqing Railway, due to the huge loads undertaken by the supporting system, the secondary lining was partially broken. We duly adjusted the cross-section type (Fig. 23) and used the multi-layer supporting to protect the secondary lining from cracking. In addition, we set energy-absorption buffer between the primary support and the secondary lining. The test showed that the loads borne by the supporting structure of sections provided with an energy-absorption buffer are even and are 40% lower than those of sections without the energy-absorption buffer. The energy-absorption buffer mitigates the risk of secondary lining cracking in the later stages.

    Fig. 22 Buffer structure

    Fig. 23 Circular cross-section of multi-layer supporting

    3.2.2.3 Operation monitoring

    Tunnels in soft rock with high geostress can only be finally stabilized by 2-3 years or even 5-6 years after the completion of the construction. Moreover, lining cracking and damage often occur during operation, which endangers train operation safety. To ensure the safety of the tunnels in soft rock with high geostress on Lanzhou-Chongqing Railway during operation, a long-term monitoring system, including real-time monitoring and automatic data transmission, is employed for tunnels in soft rock with high geostress for the first time in China. In addition, in order to ensure the safety, the monitoring management criteria for the operation of tunnels in high geostress soft rock is put forward, with considerations of operation, repair and maintenance.

    3.3 Long-distance safe and fast tunneling technology of large-diameter TBM

    3.3.1 Study of TBM adaptability

    By using advanced technologies such as the remote sensing technology, controlled-source audio-frequency magnetotellurics (CSAMT) V8 geophysical prospecting survey line and deep drilling, comprehensive geological investigation is carried out and the geological structure, strata lithology, surrounding rock characteristics, geostress, and groundwater, etc. of the tunnel area are ascertained and the tunnel scheme with the best geological conditions is selected. The tunnel is mainly located in the lower Proterozoic phyllite and metamorphic sandstone, as well as limestone at local positions. The structure zones include 5 fracture zones and 5 fold cores. According to the geotechnical indicators and the fracture zone distribution, the construction scheme of using two large-diameter TBMs at the exist section is doveloped[7].

    The result shows that the design and type selection of the TBMs for West Qinling Tunnel are successful. World records including the daily boring rate of 42 m, weekly boring rate of 235 m, and monthly boring rate of 843 m of large-diameter TBMs, as well as the new record of the longest boring length of 15.6 km by large-diameter TBMs, were created.

    3.3.2 Study of parameters of long-distance-boring TBM

    3.3.2.1 Reasonable design of cutterhead and cutting tool spacing

    To enable the TBMs of West Qinling Tunnel to continuously operate through a distance of 15.6 km, according to such geological parameters as the rock uniaxial compressive strength and integrity factor, the energy transfer rule in the process of rock breaking by disc cutter is analyzed from the view of rock breaking capacity, the boring performance indicators based on the analysis of the cutterhead input energy and the rock mass output energy is determined, and the TBM cutterhead and reasonable cutting tool spacing for West Qinling Tunnel is designed[8].

    3.3.2.2 Design of driving system and main bearing fatigue damage

    Based on the study of the dynamic characteristics of the driving system, the problems including the driving system and the main bearing fatigue damage are analyzed, and the design principle for the driving system resistance against fatigue damage under the precondition of meeting the power requirement is put forward, and the principle for key parameter selection that can guide the design of main bearing resistance against fatigue damage is established.

    3.3.3 Technology of boring and parallel lining

    Previously, the construction of tunnels by TBMs follows the procedure of "Tunneling through by TBM-TBM removal-Lining". The required long construction duration and the lining seriously lagged, which lead to the risk of supporting deformation and instability. To mitigate the risk and shorten the construction duration, the jumbo and platform that allow passage of the locomotives, cables, air pipe, and belt conveyor is designed (see Fig. 24) to achieve uninterrupted mucking by continuous belt conveyors during the secondary lining construction. The concrete ever-standing pipe working system is developed to prevent the concrete pipeline from interfering with the passage of the locomotives during concrete placing. The telescopic platform between the jumbo and platform is set to replace the belt conveyor support, realizing the parallel operation of TBM boring, locomotive passage and lining under the condition of mucking by continuous belt conveyors for the first time[9]and thus shortening the construction duration by 20 months.

    Fig. 24 Technology of TBM boring accompanied by lining construction (unit: cm)

    3.3.4 Mucking by continuous belt conveyor system

    To meet the demand of large cross-section fast tunneling by large-diameter TBMs and solve the problems of complicated topography of West Qinling Tunnel, large mucking amount, large transport amount of materials, and timely transfer of spoil materials, on the basis of advanced construction technologies and ideas, the multi-stage belt conveyor mucking system[10]is developed and one-stop transport from the TBM working face to spoil yard outside the tunnel is achieved (Fig. 25). Such a transport mode exhibited advantages of safety, high efficiency, environmental friendliness, and energy saving, and made significant contribution to safe and fast construction of the tunnel.

    (a) Inside tunnel

    (b) Outside tunnel

    The quick non-damage belt contracting and extending equipment is developed to allow the long-distance belt to perform two functions, i.e., automatic contracting and extending and transport in the tunnel and make the continuous belt be conveniently extended; to prevent breakdown of the whole system caused by the fault of the single-stage belt, a belt serial redundant system is developed to improve the fault-tolerant capability of the belt system and ensure continuous and fast tunneling of TBMs. In addition, the hydraulic shifting plate for spoil distributor is developed to achieve continuous spoiling loading of multiple trucks and seamless linkage between the belt conveyor mucking system and the spoil trucks.

    3.4 Super-long-distance ventilation

    The longest TBM construction ventilation distance of West Qinling Tunnel is 20 km, while that of previous similar tunnel works is about 13 km. How to solve problems of out-of-limit hazardous gas, dust and temperature in the tunnel was a great challenge for tunnel construction ventilation. Based on the access adit, a two-stage ventilation mode is invented: the dead-end blowing ventilation is used in phase Ⅰ while the combined gallery ventilation on the basis of the fresh air supply from phase Ⅰ and dirty air venting by inclined shafts was used in phase Ⅱ (see Fig. 26). Moreover, comprehensive energy saving measures such as using the high-power energy-saving variable-frequency fans, large-diameter high-pressure flexible ventilation ducts and anti-leakage high-strength joints are taken for the first time in super-long-distance construction of TBMs to meet the tunnel ventilation standard, and thus a new economical and environmental friendly mode for construction ventilation of similar works in the future is created.

    Fig. 26 Combined gallery ventilation in phase Ⅱ

    Test data showed that the test result was closely related to the operation status of fans. Except the high dust concentration and noise at the startup of the fans, other indicators were lower than the standard values. In other time, all the indicators were lower than the control standard values. Both the ventilation effect and dirty air venting time can meet construction requirements.

    4 Conclusions and experience

    Based on the scientific tests, practices and adjustments made by all the parties participating in the construction, innovation and exploration in various fields of the technologies of construction in special and complicated geology were carried out and the global challenge of the Tertiary quick sand was overcome, the large deformation of high geostress soft rock was controlled, the technical problem of safe, fast and long-distance construction by large-diameter TBMs was solved, and finally a complete set of feasible and effective design and construction technologies was developed. The conclusions and suggestions are as follows:

    (1) With a critical moisture content for plastic deformation of 12%-16% and that for rheological behavior of 18%-19%, the Tertiary sandstone has very poor water-related stability. The comprehensive dewatering technology integrating deep surface wells and light well points in tunnel can make the moisture content below the critical value and thus can ensure the stability of the sandstone. In addition, the construction technique featured with advance reinforcement by horizontal jet grouting for the full face of tunnels in aquiferous silty fine sand strata was developed, and the construction technique is environmental friendly and effective. It is suggested to use specialized teams to carry out construction of key operations such as dewatering and advance horizontal jet grouting.

    (2) The principle of dynamic design and making test first should be applied to tunnels with large deformation in soft rock with high geostress. It is advisable to do pre-design of classification according to the strength-stress ratio of surrounding rock, carry out dynamic adjustment during construction according to the surrounding rock characteristics, deformation amount, deformation rate, and supporting damage types, etc., and use the comprehensive deformation control technology combining active stress release and passive control. However, in view of the complexity and specificity of tunnels in soft rock with high geostress, it is necessary to carry out further studies on the deformation mechanism and classify the deformation potentiality in various ways so as to improve the accuracy of pre-evaluation.

    (3) In the design and construction of the tunnel bored by TBMs, attention should be paid to the adaptability to the surrounding rock. The advanced and effective technologies such as the parallel lining during operation of belt conveyors and the belt conveyor mucking system were developed and a complete set of technical system for safe, fast and effective tunneling by TBMs was established. According to the characteristics of long-distance tunneling by large-diameter TBMs, further studies should be carried out on parameter design and fatigue resistance of TBM cutterheads and cutters, the correlation between the geology and tunneling parameters should be analyzed in detail, and TBM tunneling record should be established to improve the TBM tunneling efficiency.

    5 Honors achieved by the project

    (1) Scientific and technological achievements: 1 special prize, 1 first prize, 2 second prizes of science & technology progress award at the level of province and ministry; 1 normalized construction technique at the state level and 3 normalized construction techniques at the level of province and ministry;

    (2) Patents: about 50 invention patents and utility model patents have been granted.

    6 Organizations participating in the project

    Designer: China Railway First Survey and Design Institute Group Co., Ltd.

    Construction contractors: China Railway Tunnel Group Co., Ltd., China Railway 11 Bureau Group Co., Ltd., China Railway 18 Bureau Group Co., Ltd., China Railway 19 Bureau Group Co., Ltd. and China Railway 21 Bureau Group Co., Ltd.

    Scientific research organizations: Beijing Jiaotong University, Shijiazhuang Tiedao University, Southwest Jiaotong University, Lanzhou Jiaotong University and China Railway Southwest Research Institute Co., Ltd.

    Acknowledgement

    The study was supported by the Study of Comprehensive Safe Construction Technologies for Super-long Tunnels in Complex Geology (2009G009-B).

    :

    [1]LI Guoliang.Construction difficulties and countermeasures for the Lanzhou-Chongqing railway tunnels in complicated geological conditions[J]. Modern Tunnelling Technology, 2015, 52(5): 10.

    [2] China Railway First Survey and Design Institute Group Co., Ltd., and Beijing Jiaotong University. Experimental study of physico-mechanical parameters of water-containing poorly-cemented sandstone formation[R]. Xi′an: China Railway First Survey and Design Institute Group Co., Ltd., 2010.

    [3]LI Guoliang,WANG Fei. Major technical measures of the third series argillaceous weak cementation rich water silty sand rock tunnels[J]. Journal of Chongqing Jiaotong University (Natural Science), 2015, 34(4): 39.

    [4] LI Guoliang, LI Ning. Discussion of tunnelling in squeezed surrounding rock[J]. Modern Tunnelling Technology, 2018, 55(1): 1.

    [5]LI Guoliang, LIU Zhichun, ZHU Yongquan. On the large squeezing deformation law and classification criteria for the Lanzhou-Chongqing railway tunnels in soft and high geostress rocks[J]. Modern Tunnelling Technology, 2015, 52(1): 62.

    [6] WANG Jianjun. The deformation mechanism of a tunnel in triassic slate and forecasting surrounding rock classifications [J]. Modern Tunnelling Technology, 2013, 50(2): 79.

    [7] LI Guoliang, SI Jianjun, LI Ning. Construction scheme of the West Qinling Extra-Long Tunnel on the Lanzhou-Chongqing Railway[J]. Modern Tunnelling Technology, 2014, 51(3): 7.

    [8]GUO Wei, SONG Liwei, ZHU Dianhua,et al.Matching characteristics analysis of TBM cutterhead boring parameters and disc cutter spacing based on energy principle [J]. Journal of Tianjin University(Science and Technology), 2017, 50(2): 128.

    [9]XU Shuangyong, SU Rui. Synchronized lining with TBM driving in West Qinling Tunnel[J]. Modern Tunnelling Technology, 2011, 48(2): 1.

    [10] XU Jinlin, XU Zan, WANG Yanbo. Key technology of mucking by continuous conveyor belt: Case study of West Qinling Extra-long Tunnel[J]. Tunnel Construction, 2011, 31(6): 678.

    国产成人a∨麻豆精品| 最近中文字幕2019免费版| 狂野欧美激情性bbbbbb| 黄色怎么调成土黄色| 五月玫瑰六月丁香| 亚洲色图 男人天堂 中文字幕 | 亚洲国产看品久久| 免费不卡的大黄色大毛片视频在线观看| 黄片无遮挡物在线观看| 黄色一级大片看看| 日韩精品免费视频一区二区三区 | 一级爰片在线观看| 国产成人aa在线观看| 丝袜美足系列| 高清av免费在线| 国产精品一国产av| 国产福利在线免费观看视频| 熟女av电影| 18禁观看日本| 中文乱码字字幕精品一区二区三区| 激情五月婷婷亚洲| av一本久久久久| 观看美女的网站| 女人精品久久久久毛片| av.在线天堂| 大香蕉久久网| 尾随美女入室| 午夜视频国产福利| 午夜福利视频在线观看免费| 国产69精品久久久久777片| 91精品伊人久久大香线蕉| 777米奇影视久久| 国产精品成人在线| 永久免费av网站大全| 女性生殖器流出的白浆| 另类亚洲欧美激情| 考比视频在线观看| 成年动漫av网址| 男人添女人高潮全过程视频| 久久精品国产鲁丝片午夜精品| 18禁动态无遮挡网站| 国产无遮挡羞羞视频在线观看| 免费日韩欧美在线观看| 精品少妇内射三级| 丰满迷人的少妇在线观看| av免费在线看不卡| 91国产中文字幕| 亚洲一区二区三区欧美精品| 午夜福利,免费看| 色5月婷婷丁香| 熟女av电影| 精品视频人人做人人爽| 在线观看美女被高潮喷水网站| 成人18禁高潮啪啪吃奶动态图| 日本黄色日本黄色录像| 成人二区视频| 丰满迷人的少妇在线观看| 国产激情久久老熟女| 草草在线视频免费看| 久久久亚洲精品成人影院| 免费高清在线观看日韩| 久久亚洲国产成人精品v| 久久久a久久爽久久v久久| 中文天堂在线官网| 另类亚洲欧美激情| 亚洲国产毛片av蜜桃av| 香蕉精品网在线| 最近2019中文字幕mv第一页| 一级毛片我不卡| 精品国产国语对白av| 狂野欧美激情性xxxx在线观看| 亚洲精品色激情综合| 国国产精品蜜臀av免费| 亚洲国产精品一区三区| 久久人人爽av亚洲精品天堂| 精品少妇久久久久久888优播| 成人漫画全彩无遮挡| 青春草亚洲视频在线观看| 激情五月婷婷亚洲| 最近中文字幕高清免费大全6| 久久久久精品人妻al黑| 亚洲精品一区蜜桃| 中文字幕亚洲精品专区| 久久久精品区二区三区| 99热6这里只有精品| 9191精品国产免费久久| av在线播放精品| 国产在视频线精品| 最近中文字幕高清免费大全6| 亚洲av电影在线观看一区二区三区| 久久久久视频综合| 亚洲国产精品专区欧美| 国产一区二区在线观看日韩| 日产精品乱码卡一卡2卡三| 久久99一区二区三区| 女人久久www免费人成看片| 国产在线免费精品| 国产一区二区三区综合在线观看 | 亚洲五月色婷婷综合| 亚洲综合精品二区| 一区二区三区四区激情视频| 中文字幕最新亚洲高清| 精品久久国产蜜桃| 男女边吃奶边做爰视频| 欧美国产精品一级二级三级| 一级a做视频免费观看| 国产亚洲欧美精品永久| 日韩三级伦理在线观看| av片东京热男人的天堂| 精品一区二区三区四区五区乱码 | 在线精品无人区一区二区三| 久久毛片免费看一区二区三区| 国产午夜精品一二区理论片| 久久狼人影院| 日韩电影二区| 国产av一区二区精品久久| 午夜福利乱码中文字幕| 少妇精品久久久久久久| 男人添女人高潮全过程视频| 亚洲国产毛片av蜜桃av| 国产精品久久久av美女十八| 日本欧美视频一区| 亚洲精品一二三| 蜜桃在线观看..| 亚洲国产看品久久| a级片在线免费高清观看视频| 捣出白浆h1v1| 波野结衣二区三区在线| 午夜福利网站1000一区二区三区| 亚洲精品日韩在线中文字幕| 国产一区二区在线观看日韩| 一级毛片 在线播放| 久久久久视频综合| 国产高清国产精品国产三级| 男女高潮啪啪啪动态图| 午夜免费鲁丝| 美国免费a级毛片| 老司机影院成人| 国产精品一区www在线观看| 侵犯人妻中文字幕一二三四区| 久久人人爽人人片av| 狠狠精品人妻久久久久久综合| 一级爰片在线观看| 免费看光身美女| 免费观看av网站的网址| 中文天堂在线官网| av播播在线观看一区| 久久精品国产自在天天线| 精品一区二区免费观看| 菩萨蛮人人尽说江南好唐韦庄| av免费在线看不卡| 青春草亚洲视频在线观看| 亚洲精品国产av成人精品| 99热全是精品| 亚洲国产欧美日韩在线播放| 男人舔女人的私密视频| 极品少妇高潮喷水抽搐| 亚洲精品久久成人aⅴ小说| 国产免费福利视频在线观看| 91国产中文字幕| 久久99精品国语久久久| 成年人免费黄色播放视频| 亚洲成av片中文字幕在线观看 | 午夜激情av网站| 欧美 日韩 精品 国产| 又黄又爽又刺激的免费视频.| 国产精品国产av在线观看| 成人亚洲精品一区在线观看| 99国产综合亚洲精品| 最近中文字幕2019免费版| 国产极品天堂在线| 99热国产这里只有精品6| 亚洲伊人久久精品综合| 中国国产av一级| 嫩草影院入口| 最近的中文字幕免费完整| av线在线观看网站| 国产亚洲av片在线观看秒播厂| 日韩电影二区| 人人妻人人澡人人爽人人夜夜| 在线观看免费日韩欧美大片| 成人国语在线视频| 国产视频首页在线观看| 欧美国产精品一级二级三级| 国产成人91sexporn| 黄片无遮挡物在线观看| 成人国语在线视频| 黑人猛操日本美女一级片| 中文字幕av电影在线播放| 久久久久网色| 成人二区视频| 精品一区二区三卡| www.av在线官网国产| 天堂中文最新版在线下载| 日韩伦理黄色片| 欧美精品国产亚洲| 热re99久久国产66热| 女的被弄到高潮叫床怎么办| 国产成人一区二区在线| 免费高清在线观看日韩| 亚洲激情五月婷婷啪啪| 亚洲熟女精品中文字幕| 男女高潮啪啪啪动态图| 精品一区二区三区视频在线| 欧美成人午夜免费资源| 国产午夜精品一二区理论片| 免费av不卡在线播放| 交换朋友夫妻互换小说| 久久久亚洲精品成人影院| 看非洲黑人一级黄片| 国产精品女同一区二区软件| 好男人视频免费观看在线| 在现免费观看毛片| 国产亚洲一区二区精品| av在线app专区| kizo精华| 99国产综合亚洲精品| 男女边摸边吃奶| 国产极品粉嫩免费观看在线| 夫妻午夜视频| 男男h啪啪无遮挡| 欧美日韩国产mv在线观看视频| 黄色视频在线播放观看不卡| 九九爱精品视频在线观看| 国产亚洲精品第一综合不卡 | 纵有疾风起免费观看全集完整版| freevideosex欧美| 欧美日韩视频精品一区| 日韩中文字幕视频在线看片| av在线播放精品| 2021少妇久久久久久久久久久| 精品国产国语对白av| 天堂8中文在线网| 一本—道久久a久久精品蜜桃钙片| 26uuu在线亚洲综合色| 亚洲av中文av极速乱| 国产女主播在线喷水免费视频网站| videosex国产| 老司机影院毛片| 大香蕉久久网| 久久久久久久久久人人人人人人| 精品少妇黑人巨大在线播放| 国产色婷婷99| tube8黄色片| 亚洲图色成人| 飞空精品影院首页| 99热这里只有是精品在线观看| av国产久精品久网站免费入址| 9色porny在线观看| 婷婷色综合大香蕉| 亚洲熟女精品中文字幕| 国产熟女午夜一区二区三区| 婷婷色麻豆天堂久久| 亚洲av中文av极速乱| 精品人妻偷拍中文字幕| 日本与韩国留学比较| 少妇的逼好多水| 啦啦啦视频在线资源免费观看| 黄色视频在线播放观看不卡| 欧美精品高潮呻吟av久久| 99re6热这里在线精品视频| 免费av不卡在线播放| 国产精品无大码| 亚洲精品色激情综合| 黑人高潮一二区| 欧美精品国产亚洲| 日本av手机在线免费观看| 最后的刺客免费高清国语| 国产爽快片一区二区三区| 黄色一级大片看看| 亚洲激情五月婷婷啪啪| 成人国产av品久久久| 欧美bdsm另类| xxx大片免费视频| 国产综合精华液| 午夜激情av网站| 久久精品国产a三级三级三级| 久久精品aⅴ一区二区三区四区 | 成年人午夜在线观看视频| 免费黄频网站在线观看国产| 久久精品人人爽人人爽视色| 成人黄色视频免费在线看| 亚洲欧洲精品一区二区精品久久久 | 日韩av不卡免费在线播放| 国产精品国产三级国产av玫瑰| 好男人视频免费观看在线| 飞空精品影院首页| 国产色爽女视频免费观看| 高清视频免费观看一区二区| 寂寞人妻少妇视频99o| 久久精品国产自在天天线| 久久久精品94久久精品| 春色校园在线视频观看| 晚上一个人看的免费电影| 国产又色又爽无遮挡免| 在线天堂最新版资源| 免费高清在线观看视频在线观看| av又黄又爽大尺度在线免费看| 亚洲婷婷狠狠爱综合网| 欧美 日韩 精品 国产| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 人妻系列 视频| 午夜免费男女啪啪视频观看| 精品人妻偷拍中文字幕| 国产亚洲午夜精品一区二区久久| 51国产日韩欧美| 久久狼人影院| 在线看a的网站| 欧美日韩视频精品一区| 亚洲国产精品一区三区| 一二三四在线观看免费中文在 | 国产高清三级在线| 日韩熟女老妇一区二区性免费视频| 99热国产这里只有精品6| 国产片内射在线| 亚洲四区av| 亚洲精品久久成人aⅴ小说| 亚洲精品日韩在线中文字幕| 国产国拍精品亚洲av在线观看| 欧美国产精品va在线观看不卡| 久久久久久久国产电影| 国产成人精品在线电影| 国产成人91sexporn| videossex国产| 女的被弄到高潮叫床怎么办| 看免费成人av毛片| 国产精品秋霞免费鲁丝片| 最近手机中文字幕大全| 九九爱精品视频在线观看| 久久av网站| 日韩一本色道免费dvd| 亚洲综合色网址| 亚洲高清免费不卡视频| 成年av动漫网址| 精品酒店卫生间| 日本午夜av视频| 精品国产一区二区久久| 一区二区日韩欧美中文字幕 | 高清欧美精品videossex| 国产亚洲av片在线观看秒播厂| 精品国产一区二区三区久久久樱花| 精品久久蜜臀av无| 国产精品嫩草影院av在线观看| 日韩在线高清观看一区二区三区| 欧美日韩精品成人综合77777| 午夜福利影视在线免费观看| 亚洲精品久久成人aⅴ小说| 亚洲美女黄色视频免费看| 男男h啪啪无遮挡| 一级爰片在线观看| 国产亚洲av片在线观看秒播厂| videosex国产| 九色成人免费人妻av| 丝袜在线中文字幕| 免费女性裸体啪啪无遮挡网站| 激情五月婷婷亚洲| 国产精品蜜桃在线观看| 亚洲人成77777在线视频| 亚洲内射少妇av| 欧美日韩亚洲高清精品| 美女脱内裤让男人舔精品视频| 日韩av不卡免费在线播放| 九色成人免费人妻av| av在线播放精品| 精品国产一区二区三区四区第35| 国产女主播在线喷水免费视频网站| √禁漫天堂资源中文www| 999精品在线视频| 精品国产一区二区三区久久久樱花| 亚洲内射少妇av| 女人被躁到高潮嗷嗷叫费观| 精品福利永久在线观看| 国产亚洲午夜精品一区二区久久| 国产精品蜜桃在线观看| 男女免费视频国产| 欧美性感艳星| 十八禁高潮呻吟视频| 久久久久久久久久久久大奶| 亚洲情色 制服丝袜| 在线观看人妻少妇| 欧美亚洲 丝袜 人妻 在线| 91精品伊人久久大香线蕉| 欧美精品高潮呻吟av久久| 如日韩欧美国产精品一区二区三区| 美女内射精品一级片tv| 免费人成在线观看视频色| 制服诱惑二区| 一本大道久久a久久精品| 在线精品无人区一区二区三| 成人国语在线视频| 激情视频va一区二区三区| 在线天堂最新版资源| 国产日韩一区二区三区精品不卡| 丝瓜视频免费看黄片| 国产极品天堂在线| av卡一久久| 亚洲精品一二三| 女人精品久久久久毛片| a级毛色黄片| 色网站视频免费| 亚洲国产精品一区三区| 日本91视频免费播放| 亚洲av中文av极速乱| 一区二区三区乱码不卡18| 尾随美女入室| 女人精品久久久久毛片| 香蕉精品网在线| 亚洲国产精品一区二区三区在线| 欧美日韩视频高清一区二区三区二| 丁香六月天网| 亚洲av国产av综合av卡| 成人无遮挡网站| 亚洲,欧美,日韩| 国产成人免费观看mmmm| 一边摸一边做爽爽视频免费| 90打野战视频偷拍视频| 亚洲国产精品一区三区| 成人无遮挡网站| 999精品在线视频| 亚洲丝袜综合中文字幕| 人体艺术视频欧美日本| 国产精品一国产av| 日韩大片免费观看网站| 在线观看美女被高潮喷水网站| 又黄又粗又硬又大视频| 久久久久久人人人人人| 内地一区二区视频在线| 亚洲精华国产精华液的使用体验| 日韩在线高清观看一区二区三区| 国产有黄有色有爽视频| 国产精品国产三级专区第一集| 丰满乱子伦码专区| 99久久精品国产国产毛片| 国产精品熟女久久久久浪| 国产午夜精品一二区理论片| 少妇人妻 视频| 亚洲国产精品成人久久小说| 国产在线视频一区二区| 一区二区av电影网| 水蜜桃什么品种好| 亚洲人成77777在线视频| 久久久精品94久久精品| 丝瓜视频免费看黄片| 交换朋友夫妻互换小说| 日本爱情动作片www.在线观看| 天天影视国产精品| freevideosex欧美| 国产免费视频播放在线视频| 一区二区日韩欧美中文字幕 | 精品午夜福利在线看| 欧美丝袜亚洲另类| 中文字幕人妻丝袜制服| 一级毛片 在线播放| 久热久热在线精品观看| 寂寞人妻少妇视频99o| 日韩成人av中文字幕在线观看| av线在线观看网站| 男的添女的下面高潮视频| 视频中文字幕在线观看| 男人舔女人的私密视频| 国产福利在线免费观看视频| av国产精品久久久久影院| 成年女人在线观看亚洲视频| 制服诱惑二区| 成年av动漫网址| 老女人水多毛片| 最新中文字幕久久久久| 亚洲国产精品成人久久小说| 免费看光身美女| 成人漫画全彩无遮挡| 久久这里有精品视频免费| 国产成人91sexporn| 国产一级毛片在线| 亚洲图色成人| 国产福利在线免费观看视频| 18禁在线无遮挡免费观看视频| 亚洲欧美成人精品一区二区| 又粗又硬又长又爽又黄的视频| 内地一区二区视频在线| 18在线观看网站| 亚洲欧美中文字幕日韩二区| 岛国毛片在线播放| av天堂久久9| 精品一区二区三卡| 视频区图区小说| 少妇熟女欧美另类| 一级片免费观看大全| 2021少妇久久久久久久久久久| 久久亚洲国产成人精品v| 有码 亚洲区| 内地一区二区视频在线| 日韩人妻精品一区2区三区| 精品卡一卡二卡四卡免费| 免费看不卡的av| 一区二区av电影网| 国产精品一二三区在线看| 国产免费一级a男人的天堂| 久久韩国三级中文字幕| 人妻一区二区av| 国产精品免费大片| 十八禁高潮呻吟视频| 黄片无遮挡物在线观看| 狂野欧美激情性bbbbbb| 男女下面插进去视频免费观看 | 宅男免费午夜| 在线观看三级黄色| 91成人精品电影| 国产麻豆69| 少妇熟女欧美另类| 亚洲一码二码三码区别大吗| 丝袜美足系列| 深夜精品福利| 欧美国产精品一级二级三级| videos熟女内射| 精品国产乱码久久久久久小说| 一二三四在线观看免费中文在 | 亚洲精品色激情综合| 精品亚洲成a人片在线观看| av福利片在线| 女的被弄到高潮叫床怎么办| 2022亚洲国产成人精品| 亚洲av免费高清在线观看| 国产在线免费精品| 久久影院123| 免费人成在线观看视频色| 色吧在线观看| 男人舔女人的私密视频| 欧美日韩视频精品一区| 久久人人爽人人片av| 国产熟女欧美一区二区| 国产免费视频播放在线视频| 亚洲精品美女久久久久99蜜臀 | 黑人欧美特级aaaaaa片| 男女无遮挡免费网站观看| 国产男人的电影天堂91| 国产亚洲精品第一综合不卡 | 免费看av在线观看网站| 亚洲精品久久久久久婷婷小说| 97人妻天天添夜夜摸| 欧美精品人与动牲交sv欧美| 老司机亚洲免费影院| 免费女性裸体啪啪无遮挡网站| 王馨瑶露胸无遮挡在线观看| 亚洲成色77777| 嫩草影院入口| 黑丝袜美女国产一区| 国产成人免费无遮挡视频| 亚洲成av片中文字幕在线观看 | 精品一区二区免费观看| 亚洲精品中文字幕在线视频| 国产精品国产三级专区第一集| 久久精品夜色国产| 男女免费视频国产| 国产精品嫩草影院av在线观看| 肉色欧美久久久久久久蜜桃| 亚洲精品国产av成人精品| 欧美最新免费一区二区三区| 久久韩国三级中文字幕| av有码第一页| 午夜福利视频精品| 久久女婷五月综合色啪小说| videossex国产| 九九在线视频观看精品| 美女内射精品一级片tv| 五月开心婷婷网| 国产av国产精品国产| 九草在线视频观看| 久久国产亚洲av麻豆专区| 久久精品国产亚洲av涩爱| 天美传媒精品一区二区| 欧美+日韩+精品| 观看美女的网站| 黄色一级大片看看| av卡一久久| 久久精品人人爽人人爽视色| 日日爽夜夜爽网站| 女性生殖器流出的白浆| 嫩草影院入口| 人体艺术视频欧美日本| 9191精品国产免费久久| 人体艺术视频欧美日本| 日韩免费高清中文字幕av| 亚洲成人av在线免费| 一本久久精品| av.在线天堂| 欧美国产精品va在线观看不卡| 中文字幕另类日韩欧美亚洲嫩草| 一区二区三区乱码不卡18| 国产av精品麻豆| 亚洲欧美清纯卡通| 中文字幕人妻丝袜制服| 热99国产精品久久久久久7| 国产福利在线免费观看视频| 午夜激情av网站| 精品国产露脸久久av麻豆| 久久综合国产亚洲精品| 国产精品不卡视频一区二区| 欧美国产精品一级二级三级| 日韩一区二区视频免费看| 国产精品欧美亚洲77777| 一个人免费看片子| 久久精品国产自在天天线| 熟妇人妻不卡中文字幕| 少妇人妻 视频| 日韩 亚洲 欧美在线| 大话2 男鬼变身卡| 国产精品99久久99久久久不卡 | 国产精品久久久久久久久免| 久久这里只有精品19| 免费少妇av软件| 国产精品欧美亚洲77777| 亚洲精华国产精华液的使用体验| 两个人看的免费小视频| 久久久久精品人妻al黑| 午夜福利视频精品|