• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Drilling load modeling and validation based on the filling rate of auger flute in planetary sampling

    2017-11-21 12:54:40QuanQiquanTangJunyueYuanFengpeiJiangShengyuanDengZongquan
    CHINESE JOURNAL OF AERONAUTICS 2017年1期

    Quan Qiquan,Tang Junyue,Yuan Fengpei,Jiang Shengyuan,Deng Zongquan

    State Key Laboratory of Robotics and System,Harbin Institute of Technology,Harbin 150080,China

    Drilling load modeling and validation based on the filling rate of auger flute in planetary sampling

    Quan Qiquan*,Tang Junyue,Yuan Fengpei,Jiang Shengyuan*,Deng Zongquan

    State Key Laboratory of Robotics and System,Harbin Institute of Technology,Harbin 150080,China

    Coring;Drilling load;Filling rate of auger flute;Lunar regolith simulant;Planetary drilling

    Some type of penetration into a subsurface is required in planetary sampling.Drilling and coring,due to its efficient penetrating and cuttings removal characteristics,has been widely applied in previous sampling missions.Given the complicated mechanical properties of a planetary regolith,suitable drilling parameters should be matched with different drilling formations properly.Otherwise,drilling faults caused by overloads could easily happen.Hence,it is necessary to establish a drilling load model,which is able to reveal the relationships among drilling loads,an auger’s structural parameters,soil’s mechanical properties,and relevant drilling parameters.A concept for the filling rate of auger flute(FRAF)is proposed to describe drilling conditions.If the FRAF index under one group of drilling parameters is less than 1,this means that the auger flute currently removes cuttings smoothly.Otherwise,the auger will be choked with compressed cuttings.In drilling operations,the drilling loads on the auger mainly come from the conveyance action,while the drilling loads on the drill bit primarily come from the cutting action.Experiments in one typical lunar regolith simulant indicate that the estimated drilling loads based on the FRAF coincide with the test results quite well.Based on this drilling load model,drilling parameters have been optimized.

    1.Introduction

    As the Earth’s closest nature satellite,the Moon completely records the 4.5 billion years evolutionary history of the solar system.Hence,when human beings started extraterrestrial explorations,the Moon definitely was the preferred target.1,2The main goal of lunar exploration is to understand the geological evolution of early stars through analyzing the subsurface composition beneath the surface.Compared with other sampling methods,drilling and coring,due to its efficient penetrating and cuttings removal characteristics,has been widely applied to past planetary sampling missions.3,4

    At present,China is performing a lunar exploration program,namely the Chang’E project,the third phrase of which will use a hollow drill with a coring mechanism to capture the lunar soil and bring it back to the Earth.5,6According to reports on the lunar regolith,the lunar surface is largelycovered by a layer of lunar regolith material.The vertical extension of this regolith layer is estimated to be of the order of several meters.7Because mechanical properties of the lunar regolith on different sampling spots or even at different depths on one spot can be quite different,the loads on a drilling device necessary to achieve penetration may often be unpredictable and this fact could seriously affect the stability of drilling.In terrestrial drilling,many types of detecting instruments are commonly used to accurately acquire geological information in order to assist real-time drilling.However,due to the mass and power constraints,such additional instrumentation can often not be implemented in planetary missions.For example,the lunar penetrating radar(LPR)that will be applied on the Chang’E missions,is not accurate enough to obtain the geological information on the lunar surface and near the subsurface that would be required for a safe drilling action.8Therefore,to reduce potential risks in penetrating,drilling loads should be monitored online and be reasonably restricted.

    In a piercing process,cuttings in the annular region between the coring tube and the auger’s outer surface are exerted by the cutting action by the cutting blade and are removed in the upward direction by the action,which is generated from the spiral auger and the borehole.9In the cutting and conveyance process described above,the sampling drill suffers reaction forces,generating drilling loads.Research on granular soil’s spiral conveyance indicated that the cuttings’removal action affected drilling loads directly.10When a drill tool has penetrated to a certain depth,the driving power used for the cutting action becomes stable at some level,while the driving power needed for the conveying action increases dramatically and becomes the main power consumer11.

    To prepare for future Mars exploration,the University of California,Berkeley conducted a large number of experiments in sandstone cuttings under Martian conditions,revealing that an ice sublimation phenomenon generated by heating could effectively alleviate an auger’s choking,greatly reducing the penetrating velocity and the drilling power.12,13According to the requirements of Chinese lunar exploration missions,the Harbin Institute of Technology analyzed the effects on the coring rate and the rotary torque by a drill tool’s mechanical structure parameters and optimized the structural parameters.14,15It can be obviously concluded that to a specific sampling drill tool,suitable drilling parameters may efficiently reduce uncertain drilling loads.

    Due to the restricted hardware resources on a planetary probe,drilling parameters should be reasonably optimized to reduce the drilling power needed for penetration.Establishing a drilling load model and revealing the relationships between the drilling load and the regolith’s mechanical properties,will contribute to optimizing drilling parameters.The failure mode and conveyance state of the lunar regolith under a drill tool’s action are theoretically analyzed in this paper.By using the FRAF index to describe the cuttings removal states of the lunar regolith,a drilling load model containing two typical drilling conditions has been established.Experiments in one typical lunar regolith simulant indicate that this drilling load model based on the FRAF coincides well with test results and can be used to optimize drilling parameters.Optimization indices of drilling parameters are analyzed according to the requirements of future lunar exploration.Based on the validated drilling load model,drilling parameters are optimized for application in lunar regolith simulants.

    The remainder of this paper is organized as follows.One typical lunar regolith simulant and one potential drill tool are prepared firstly.The filling rate of the auger flute index is employed to describe the drilling conditions for different drilling parameters.The drilling load model established based on the FRAF index is validated for one typical lunar regolith simulant afterward.Finally,drilling parameters are optimized based on this drilling load model.

    2.Lunar regolith simulant and drill tool

    In many drilling applications,in particular in natural environments such as planetary surfaces,whose structure and layering are not known in advance,drilling loads have highly unpredictable and non-linear characteristics.Before establishing a drilling load model,a large number of drilling experimentsshould be carried outfirst foracquiring useful drilling state signals,which can serve as a sound basis for modeling.Both the structural parameters of the auger and the mechanical properties of the lunar regolith are expected to have considerable influences on the drilling performance.Therefore,in order to find an optimized set of drilling parameters suitable for application on a planetary lander mission,these influence factors need to be studied and evaluated in advance.

    2.1.Lunar regolith simulant

    Lunar regolith is a general term for the layer or mantle of fragmental rock material,formed by frequent meteoritic impacts on the atmosphere.16Studies of the returned samples indicate that the lunar regolith mainly contains five basic compositions:rock debris,mineral fragments,breccia,agglutinate,and glass-bonded aggregates.7,17The relative proportions of each composition,depending on the mineralogy of source rocks,vary from place to place,and even at different depths on one spot,they may be quite different.In order to verify our drilling load model,the lunar regolith simulant should mimic the mechanical properties of the real lunar regolith as close as possible.

    In this paper,HIT-LS1#soil as shown in Fig.1(a)has been chosen as the sampling material.The main component of HIT-LS1#soil is brown volcanic ash originating from the Jilin Province,China.6After the pressing process,the particle size distribution of this simulant varies from 1 μm to 100 μm,which is similar to that of the returned samples from the Apollo 17 landing site.18The density of HIT-LS1#soil is about 1.878 g/cm3.According to the research by Heiken,among all mechanical properties,the shear strength of the lunar regolith,such as cohesion and internal angle,affects the drilling loads directly.7As shown in Fig.1(b),under a repeated triaxial shear test,the shear strength of HIT-LS1#soil is acquired as follows: the average cohesionc=45.9 kPa and the average internalfriction angle φ =48°.In this paper,the authors just consider the drilling interaction in a homogeneous lunar regolith.To acquire a homogeneous lunar regolith simulant for experimental validation,the lunar regolith simulant was compressed deliberately,which may resultin a high cohesion.19,20.The drilling experiments will be conducted based on this typical lunar regolith simulant.

    Fig.1 One typical lunar regolith simulant:HIT-LS1#soil.

    2.2.Drill tool

    The drill tool used in our experiments consists of a drill bit and a hollow auger.In this paper,a double-helix drill tool with double cutting blades is designed.The total length of this drill tool is approximately 0.5 m.There are two tungsten carbide cutting blades fixed to the drill bit matrix by a spotting weld process.To ensure that the cuttings can be removed from the auger flute fluently,the rake face of the cutting edge is aligned with the exit of the spiral auger flute.Taking the cuttings’removal effect and the drill bit’s stress situation into account,the straight welded insert mode is adopted to install the cutting blades.21The rotary drill is designed as a split structure,in which the upper and lower bodies are connected by a trapezoidal thread.Former drilling experiments have shown that this double-helix drill tool has a good cutting performance and allows to remove cuttings ranging from granular regolith to hard rock quite well.Hence,the drilling load modeling in this paper will be based on this type of drill tool.To analyze the effects of various drilling parameters and the lunar regolith’s mechanical parameters on the drilling load,the structural parameters of this drill tool are defined in Fig.2 and listed in Table 1.

    2.3.Flexible tube coring method

    In a drilling process,the drill tool is driven by a rotary and percussive driving mechanism and a penetrating mechanism to pierce into the regolith.Inside the auger,there is an elaborately designed flexible tube coring mechanism,as shown in Fig.3.There is a set of coring tubes inside the rotary auger,including a rigid tube and a flexible tube.The flexible tube is arranged between the auger and the rigid tube.One tip of the flexible tube is a sealing mechanism and the other tip is fixed on the connection component,connected with a dragging wire.

    Once the drill bit contacts the planetary surface under the penetrating velocityvp,one tip of the dragging wire will be fixed at a point on the probe.Moreover,the wire keeps a tense state in the whole penetrating process.The rigid tube moves downward with the auger synchronously,however,it does not rotate.When drilling into the regolith,the flexible tube begins to wrap the cutting core under the winding speedvw.Since there is no relative locomotion between the flexible tube and the core,this coring method can keep the original stratif ication of planetary soil.When the desired drilling depth is reached,the sealing tip at the end of the flexible tube will be activated to collect the soil sample into the closed space.

    Fig.2 Definition of the drill tool’s structural parameters.

    Table 1 Structural parameters of the drill tool.

    2.4.Planetary drilling&coring test-bed

    To validate the drilling load model,the authors of this paper developed a planetary drilling and coring test-bed(PDCT),as shown in Fig.4.The PDCT mainly consists of a bed frame,a lunar soil container,the drill tool,the penetrating drive unit,the rotary-percussive drive mechanism(RPDM),and the gravity compensation.22,23.A torque sensor is mounted on the output side of the rotary motor in order to monitor the rotary torque that the drill tool sustains,and an F/T sensor is installed on the bottom of the lunar soil container to monitor the penetration resistance force.Finally,on one side of the vertical rails,a magnetic scale displacement sensor is mounted to monitor the penetration velocity of the drill tool during the piercing process.To acquire the drilling loads online in drilling experiments,the data acquisition system of this test platform is based on xPC Target in MATLAB.

    3.Conveyance mechanism

    Under the complex motions of rotation and penetration,cuttings are immediately removed from the bottom of the borehole.This removal principle is similar to that of a screw conveyor.24,25Referring to the spiral transport theory,the driving force for upward removal of the lunar regolith along the spiral auger mainly contains the following two aspects:the thrust exerted by the bottom of the borehole and the friction exerted by the wall of the borehole.

    Fig.4 Planetary drilling and coring test-bed.

    3.1.Thrust from the bottom of the borehole

    Because the lunar regolith becomes loose and granular after the cutting action by the drill bit,the conveyance analysis will mainly be focused on the granular regolith,assuming that there is a homogeneous granular regolith on the smooth ramp with an inclination angle α,which is the same as the helix angle in Table 1.The lunar soil sustains the thrustFpfrom the bottom of the borehole,which causes an upward movement of the material along the ramp.The weight of lunar regolith of a thickness of 1,a length ofL,and a height ofsalong the ramp direction is ρgmssin α.According to Rankine passive earth pressure theory,26the maximum thrust acting on the lunar soil can be calculated as follows:

    Fig.3 Flexible tube coring method.5

    where ρ is the density of the granular soil andgmis the acceleration of gravity on the moon.The static equilibrium equations are given as follows:

    Herein,Lsinα=H,whereHis the vertical height of the granular regolith.IncorporatingHinto the above equation and simplifying it,we obtain:

    According to Eq.(3),the vertical heightHof the granular regolith is controlled by the regolith’s internal angle φ and heights.As shown in Fig.5,when keeping the height of regolith in the spiral flute constant,Hincreases with the inner angle.Due to the fact thatsis restricted by the drill pitchPand the blade thickness of the spiral flutehc,the maximum height will beP-hc.For the designed double-helix drill tool and the compacted lunar regolith,the calculated maximum height of the lunar regolith is only about 9 mm.

    Under a non-choking condition,there is no additional stress on the soil and the thrust from the bottom of the borehole can only push the lunar regolith over a limited distance.Therefore,it can be concluded that the thrust from the bottom of the borehole is not the main driving force for cuttings’removal under a non-choking condition.However,under a choking condition,an additional stress occurs,which can enhance the thrust from the bottom of the borehole and should be considered in modeling.

    3.2.Friction from the wall of the borehole

    The friction along the wall of the borehole is generated by the positive pressure acting on the wall.For the granular regolith in the spiral flute,the main positive pressure stems from the following three aspects:the active earth pressure,the centrifugal force,and the additional stress.In the following,three positive pressures will be discussed.

    Fig.5 Vertical height by the thrust from the bottom of the borehole.

    Fig.6 Force analysis under the active earth pressure.

    Consider a sector element of the lunar regolith on the flute ramp,of which the height of the lunar regolith element iss.As shown in Fig.6,the Cartesian coordinate systemO-xyzfor force and motion analysis is built on the surface of the spiral flute,whereFcis the reaction force on the cylindrical surface of the auger,Fwis the reaction force on the wall of the borehole,Fnfis the supporting force on the bottom of the flute,andGis the gravity of the lunar regolith element.

    According to the active earth pressure theory,the positive pressure acted on the lunar regolith σyat a drilling depthhis calculated as follows:

    By analyzing the force states of a lunar regolith element,the resistances on the wall of the boreholefw,at the bottom of the spiral flutefb,and on the ceiling of the spiral flutefccan be acquired:

    where dθ is the circumference angle of the lunar regolith element,μsis the friction coefficient between the soil and the spiral flute,and μwis the friction coefficient between the soil and the wall of borehole.Assuming that the action by the active earth pressure can convey soil upward,the deviation from the statics equilibrium is illustrated as follows:

    If the friction coefficient μsis equal to the friction coeff icient μw,the following inequality can be acquired by connecting the above division and statics equilibrium inequality.whereKapis defined as the pushing coefficient of the soil’s active earth pressure.IfKap>1,this means that the lunar regolith can be moved upward along the spiral flute by the active earth pressure.Otherwise,it cannot realize that the removal of the borehole cuttings cannot be achieved by the active pressure.As shown in Fig.7,when the soil has a particular height,Kapis smaller for a high internal angle of the lunar regolith and is always below 1.This can be explained that the active earth pressure based on the active earth pressure theory is negatively correlated with the soil’s inner angle,which results in a smaller friction force to drive the soil to be removed up.Therefore,the pushing coefficient of the soil’s active earth pressureKapbecomes larger when the inner angle decreases.

    According to the spiral transport theory,there exists a threshold of the auger’s rotary speednt.When the auger’s rotary speednexceeds the speed thresholdnt,soil will be removed from the spiral flute fluently.In the following,a volume element of the lunar regolith element residing on the spiral flute is analyzed.Under a non-choking condition,the soil element will slide to the side of the hole wall due to the centrifugal force,as shown in Fig.8(a),where the Cartesian coordinate systemO-xyzfor force and motion analysis is built on the surface of the spiral flute,Fceis the centrifugal force,Ffnfis the friction force produced from the normal forceFnf,andˉris the average radius of the lunar soil.

    When the auger’s rotary speed exceeds the threshold,soil will come into contact with the borehole wall and then the relative motion begins.Moreover,the direction of soil’s absolute speed changes.As shown in Fig.8(b),in this condition,vris the relative velocity,vfis the following velocity by the rotary speed,vpis the penetrating velocity,vais the absolute velocity,and β is the angle between the speed vector and the horizontal surface.The auger’s rotary speed won’t be too high,because it is restricted by the power supplied by the probe.Thus,the Coriolis force can be neglected in the force analysis.As shown in Fig.8(c),Fwchanges the direction when the rotary speed exceeds the threshold.The force equilibrium equations of the lunar regolith are given as follows:

    Based on the velocity triangle,the lunar regolith motion equations can be obtained as follows:

    Fig.7 Pushing coefficient of the soil’s active earth pressure.

    Fig.8 Force analysis under the centrifugal force under a nonchoking condition.

    Combining Eqs.(8)and(9),the lunar soil’s helix angle and the relative velocity under a non-choking drilling condition will be acquired.

    As long as the rotary speed of the auger is below the rotary speed threshold,the lunar regolith may not be conveyed by the centrifugal force.Meanwhile,the annular region between the coring tube and the auger’s outer surface may be filled with the lunar regolith,producing additional stress.As shown in Fig.9,a sector element of the lunar regolith filling in the flute ramp under a choking condition is analyzed.The Cartesian coordinate systemO-xyzis built on the surface of the spiral flute.

    Under a choking condition,the lunar soil element in the flute sustains the actions from the spiral blade,the wall of the borehole,and the cylindrical surface of the auger.By both actions(the thrust exerted by the bottom of the borehole and the friction exerted by the wall of the borehole),the lunar regolith element will be removed along with the spiral flute,in which the soil’s motion is very similar to that under a nonchoking condition.The force and torque equations are given as follows:

    whereFceis the centrifugal force sustained of the lunar regolith,Fpis the thrust from the borehole,Fnwis the normal force on the wall of the borehole,Fnfis the normal force on the bottom of the flute,Fσcis the normal force on the ceiling of the flute by the additional stress,Fσsis the normal force on the cylindrical surface by the additional stress,Ffcis the friction force from the spiral flute’s ceiling,Ffsis the friction force from the auger’s cylindrical surface,andFfwis the friction force from the hole wall.

    For a stationary situation,the volume of cuttings produced must be equal to the volume of cuttings removed from the borehole.This can be expressed by the following equation:

    Fig.9 Force analysis under additional stress under a choking condition.

    Combining Eqs.(10)and(11),the additional stress under a choking condition can be acquired.As shown in Fig.10,the additional stress of one lunar regolith simulant with an internal angle of 30°is calculated.From this figure,under a certain penetrating velocity,the additional stress increases when the rotary speed slightly decreases.This can be concluded that a higher rotary speed can relieve the choking condition.For a given rotary speed,the additional stress increases with the penetration velocity,showing that a low penetration velocity will be helpful for removing the lunar regolith.

    3.3.Filling rate of auger flute(FRAF)

    According to the above analysis of a lunar soil’s conveyance mechanism,the filling condition of the spiral flute directly affects the auger’s stress state.To acquire an accurate drilling model,the filling rate of auger flute(FRAF)Kfis proposed as:

    whereS0is the transversal area of the auger flute andS1is the actual transversal area of the lunar soil removed by the auger flute.Based on the analysis of drilling conditions under different rotary speeds,drilling conditions can be divided into two typical cases.When 0<n<nt,cuttings will be accumulated on the spiral flute until filling the flute,producing a choking condition.Whenn>nt,cuttings will be removed by the centrifugal force,and the spiral flute will not be filled with cuttings,producing a non-choking condition.

    Fig.10 Additional stress under a choking condition.

    Fig.11 FRAF Kfcalculated in different conditions.

    Combining Eqs.(8),(9),and(12),Kffor different rotary speeds and penetration velocities can be obtained,as presented in Fig.11.For a certain lunar regolith simulant,under the same rotary speed condition,Kfis closer to 100%when the penetration velocity is higher.Under the same penetration velocity,Kfis closer to 100%when the rotary speed is lower untiln<nt.Since the friction force from the wall of the borehole is the main driving force for removing cuttings,a lunar regolith with a larger internal angle is easier to be conveyed,and the correspondingKfis smaller.

    4.Modeling and validation

    Based on the analysis of the conveyance mechanism in Section 3,a drilling load model describing a combination of the auger and the drill bit is presented now.Actually,according to the flexible tube coring method,there is no relative locomotion between the core and the sleeve.Compared with the drilling loads in the auger and the drill bit,the force or toque generated by the friction between the core and the sleeve may be very little,which could be neglected in the drilling load’s modeling.Since drilling conditions can be classified by the FRAF index,the models for the auger and the drill bit will firstly be considered separately,taking possible drilling conditions into account.The total drilling load can then be acquired by adding up these two contributions.

    4.1.Drilling load modeling

    According to the motion and force analysis of lunar regolith presented in Section 3,the drilling loads on the auger mainly contain the following six parts.As shown in Fig.12,Fafis the friction force acting on the spiral blade.Since the lunar regolith simulant is compressed to keep homogenous,the drilled borehole can be held well in the course of a drilling operation and the wall of the borehole will be rather smooth.Hence,for calculating drilling loads,the friction force on the spiral bladeFafcan be neglected.

    Under a non-choking condition,the drilling loads on the auger mainly contain the supporting force and the force on the bottom of the spiral flute.Deploying the spiral line,the deploying angle of the lunar regolith at a certain heighthcan be acquired as χ =h/(ˉrsin α).In a non-choking condition,the rotary torque and penetration force that drill tool sustains can be obtained as follows:

    Fig.12 Drilling loads on the auger in two conditions.

    whereNtis the number of the auger’s spiral line.Combining Eqs.(12)and(13)together,the drilling loads on the auger in a non-choking condition can be acquired.

    Under a choking condition,the cuttings in the spiral flute will be extruded and conveyed.In this drilling condition,the auger not only sustains the supporting force and the force on the bottom of the flute,but also sustains the supporting force and the force on the flute ceiling as well as the force on the cylindrical surface.At a certain height,the rotary torque and penetration force sustained by the drill tool can be calculated as follows:

    Since the filling rate of auger fluteKf=1 in a choking condition,combining Eqs.(10),(11),and(14),the drilling loads on the auger in a choking condition can be acquired.

    According to the difference in failure mechanism,the lunar regolith surrounding the drill bit can be divided into two parts:the cutting area and the accumulation area.27The lunar regolith in the cutting area mainly sustains the shearing damage by the cutting blade,and the cuttings in the accumulation area are mainly removed by the wall of the borehole.As shown in Fig.13,according to the difference in boundary constraint,the accumulation area can be divided into accumulation zoneA1and zoneB1.

    Accumulation zoneA1,formingatriangularwedgeAFQ-BGP,is connected with the cuttings in the spiral flute.Accumulation zoneB1is restricted by the transition plane and forms a trapezoidal shape wedgeBSMJ-CHNK.

    According to the morphological analysis of the soil in the drill bit,the drilling loads on the drill bit mainly contain the following nine contributions,as shown in Fig.14.Compared with the accumulation area,the area of cutting is too small,so the cohesion forceFccand the friction forceFcfin the cutting area are neglected.The specific components of the drilling loads on the drill bit are given in Table 2.

    Under a non-choking drilling condition,the cuttings in the accumulation area only sustain a tangential load.This implies that the penetration force in the accumulation areaFpa=0.The drilling loads in a non-choking drilling condition are mainly caused byFaf1and the cohesion forceFac1between cuttings in the accumulation area and the wall of the borehole,Faf2and the cohesion forceFac2,and the Rankine passive earth pressureFcp.Each drilling load component,the rotary torque,and the penetration force are as follows:

    Fig.13 Morphological analysis of the soil surrounding the drill bit.

    wherecais the cohesion of the cuttings in the accumulation area,Wais the weight of the cuttings in the accumulation area,andlais the length of the bottom of the accumulation area.Combining Eqs.(11)and(15),drilling loads on the drill bit in a non-choking condition can be acquired.

    In a choking drilling condition,cuttings in the accumulation area bear the action by the additional stress and are removed by the extruding action.The shape of the accumulation area is a closed wedge,where the accumulation angle θ=α and the filling rate of auger fluteKf=1.In addition to the drilling loads in a non-choking condition,the drill bit also sustains the supporting forcesFσtandFσc,as well as the friction forcesFaf3andFaf4from the transition plane and the ceiling plane of the spiral flute,respectively.Each component of the drilling loads,the rotary torque,and the penetration force in a choking condition are as follows:

    Fig.14 Drilling loads on the drill bit in two conditions.

    Table 2 Components of the drilling load on the drill bit.

    Combining Eqs.(10),(11),and(16),the drilling loads on the drill bit in a choking condition can be acquired.In summary,by evaluating the filling rate of auger flute(FRAF)index,the piercing process with different drilling parameters can be classified as either a non-choking condition or a choking condition.After calculating the drilling loads on the auger and the drill bit respectively,the total drilling load is obtained by adding up the two components.

    4.2.Model validation

    When conducting the drilling and coring experiments,a flexible tube of 130-mm length is positioned in the hollow auger,as showninFig.15.Once thedrillbitisincontactwith thesoilsurface,one tip of the dragging wire is fixed at a point on the test platform,while the other tip is connected to the starting point oftheflexibletubeandiskeptinatensestate.5Whenthedesired drilling depth is reached,the sealing tip at the end of the flexible tubeisactivatedtocollectthecoringsampleintotheclosedspace insidetheflexibletube.Todistinguishthecuttingsremovedwith those in the spiral flute,an isolation plate was mounted on the surface of the lunar regolith passing through the auger.

    Drilling parameters in the drilling and coring experiments are given as follows:rotary speedn=40,80,120,160,200,240 r/min and penetrating velocityvp=40,80,120,200,240 mm/min.According to the 6×6 matrix,repeated tests are conducted.In the experiments,drilling loads are monitored,not exceeding the maximum drilling loads that test platform can sustain.The test results on the HIT-LS1#lunar regolith simulant are shown in the above figure.

    According to the discussion in Section 3,the FRAF is applied in our drilling loads model to determine drilling conditions.To verify the correctness of the proposed FRAF concept,verification tests should be carried out.Neglecting the effect on the soil’s density by the drilling depth,the FRAFKfcan be equivalent to the mass ratio between the actual mass in the spiral fluteM2and the theoretical oneMs,as shown in Eq.(17):

    During the drilling process,three types of lunar regolith are produced:accumulation soilMa(H),soil in the spiral fluteMs(H),and coring soilMc(H).According to the conservation of mass,the following equation can be obtained:

    Fig.15 Working process of drilling and coring experiments.

    Fig.16 Working process of drilling and coring tests.

    Fig.17 FRARs in theory and experiment.

    Since the soil in the spiral flute is in a confined space,its mass cannot be measured accurately.Herein,to a certain depthH,Ms(H)can be indirectly acquired by measuring the mass of the accumulation soilMa(H)and that of coring soilMc(H)separately,as shown in Fig.16.

    Using the mechanical parameters of the lunar regolith simulant in Eq.(12),a comparison of results between the theoretically calculated FRAF and the FRAF obtained from the experiments can be made.The results are shown in Fig.17.This comparison indicates that the calculated FRAF coincides with the test results quite well.With the same rotary speed,the FRAF increases with the penetration velocity and at a higher velocity,the FRAF changes significantly.The FRAF becomes smaller when the rotation speed is higher.At a low rotation speed and a high penetration velocity,the FRAF is always equal to 1,which means that the drill tool gets blocked in this drilling parameters regime.At a high rotary speed,the FRAF is constantly less than 1,meaning that the drill tool is not blocked and thus the cuttings in the spiral flute are removed fluently.The experimental results presented above show that the proposed FRAF concept can describe the drilling conditions in different drilling parameter ranges quite well and thus can be used to establish the drilling load model.

    In addition to the masses of the accumulation soil and the coring soil,drilling loads are also acquired by the drilling and coring process.The mechanical parameters of the lunar regolith simulant in our drilling load model and the comparison results between theoretical and experimental rotary torques are shown in Fig.18.

    Fig.18 Drilling loads in theory and experiment.

    Fig.19 Predicted drilling loads based on the established drilling load model.

    From the rotary torque comparison results shown in Fig.18,the calculated rotary torque obtained from the theo-retical model also coincides well with the test results.Under the same rotary speed,the rotary torqueTincreases with the penetration velocity significantly.At a high penetration velocity,the rotary torque changes significantly,and at a low penetration velocity,the growth of the rotary torque becomes more moderate.This can be explained by the fact that a high penetration velocity leads to increases of the cutting volume and the FRAF,causing more easily a blocking of the drilling tool.Under the same penetration velocity,the rotary torqueTbecomes smaller when the rotary speed is higher.At a high rotary speed,the rotary torque changes significantly,and at a low rotary speed,the growth of the rotary torque becomes moderate.When the penetration velocityvp=120 mm/min,the rotary torque reaches 34 N.m,almost the maximum drilling load that test platform can sustain.As shown in Fig.18(f),a high rotary speed results in an increase of the centrifugal force,so cuttings can be removed fluently and the corresponding rotary torque is less than 1 N.m.

    5.Drilling parameters optimization

    The goal of drilling load modeling is to acquire suitable drilling parameters for different drilling conditions and thereby to improve the sampling drill’s environmental adaptability.Based on the drilling model validated in Section 4,the drilling load in one simulant was obtained.According to the lunar exploration requirements,drilling parameters of this simulant can be optimized reasonably under limited drilling power,penetration force,etc.

    5.1.Optimization indexes

    Due to limited in-orbit weight and power supply,a lunar sample return mission has several requirement indices.These can be divided into safety index and functional index.The safety index is proposed to confirm the mission’s reliability and must be obeyed.The functional index indicates to which extent the system has been optimized to fulfill its foreseen task effectively.Suitable drilling parameters should satisfy the requirements of both the safety index and the functional index.

    Restricted by the driving capacity of the rotary motor,the rotary torqueTshould not be more than 30 Nm.By the lander weight constraint,the penetration forceFpshould be less than 800 N.By the probe’s power supply capacity constraint,the drilling powerPdand the energyWdare required to be less than 100 W and 50 W h,respectively.Since the main goal of lunar drilling and coring is to acquire lunar regolith,the sampling rateKshould not be too low.Herein,the sampling rateKis required to be more than 90%.According to experimental research on the ground,overlong drilling time will lead to a decrease of the sampling rate.28Therefore,the total drilling timeTtis restricted to be 0.5 h for a 2-m depth and the corresponding penetrating velocityvpshould be more than 80 mm/min.

    5.2.Optimization method

    Since the intended landing spot in China’s future lunar exploration mission is the rainbow bay area on the Moon,the lunar regolith acquired by the Apollo15 mission at the ‘Hadley Rile”is chosen as the drilling formation.29.Taking the mechanical parameters of this lunar regolith into the drilling load model established in Section 4,the corresponding rotary torque,penetrating force,drilling power,and drilling energy are acquired,as shown in Fig.19.

    Fig.20 Range of suitable drilling parameters.

    The relationship between the sampling rateKand the ratio ofvptonwas discussed in former experimental research.28.The rotary speednand the penetration velocityvpare restricted by the above optimization indexes,as shown in Fig.20.The black shaded region in Fig.20 corresponds to the drilling parameter values meeting the requirements of the tasks.

    According to the principle of least energy consumption in metal cutting theory,there exists an appropriate combination of drilling parameters(no,vpo,fpero)minimizing the drilling total energy,as shown in the following equation:30

    wherenois the optimized rotary speed,vpois the optimized penetrating velocity,Tois the optimized rotary torque,Fpois the optimized penetrating force,Ttois the optimized drilling total time,andWdminis the optimized drilling energy.Using the mechanical parameters of lunar regolith in the above equation,the optimized drilling parameters are as follows:rotary speedno=85 r/min and penetration velocityvpo=80 mm/min.The minimum drilling energy for drilling a 2m depthWo=38.56 Wh,and the optimized coring rateKo=94.6%,meeting all the requirements for the future task.

    6.Conclusions

    This paper analyzes the failure mode and conveyance state of the lunar regolith.The filling rate of auger flute(FRAF)is proposed to classify drilling conditions into two typical conditions:non-choking and choking conditions.Based on the spiral transport theory,a drilling load model combing the loads on the auger and the drill bit has been established.Experiments in one typical lunar regolith simulant HIT-LS1#soil under different combinations of drilling parameters indicate that this drilling load model based on the FRAF coincides with the test results reasonably well.Based on this drilling load model and optimization indices analyzed,drilling parameters of the lunar regolith simulant can be optimized by using the principle of least energy consumption.

    Acknowledgments

    TheauthorsthankthesupportsbytheNationalNaturalScience Foundation of China(No.61403106,No.51575122),Program of Introducing Talents of Discipline to Universities(No.B07018)of China,and Fundamental Research Funds for the Central Universities(No.HIT.NSRIF.2014051)of China.

    Appendix A.Supplementary material

    Supplementary data associated with this article can be found,in the online version,at http://dx.doi.org/10.1016/j.cja.2016.05.003.

    1.Ronca LB.An introduction to the geology of the moon.Proc Geol Assoc1966;77(1):101–25.

    2.Ouyang ZY,Li CL,Zou YL,Liu JZ,Liu JJM.The primary science result from the chang’e-1 probe.Sci China Earth Sci2010;40(3):261–80.

    3.Bar-Cohen Y,Zacny K.Drilling in extreme environment:penetration and sampling on earth and other planets.Weinheim:Wiley-VCH;2009.p.1–30.

    4.Zacny K,Bar-Cohen Y.Drilling and excavation for construction and in-situ resource utilization.In:Badescu V,editor.Mars prospective energy and material resources.Berlin:Springer-Verlag;2009.p.431–59.

    5.Quan QQ,Tang JY,Jiang SY,Li H,Li SC,Deng ZQ,et al.Control system for a drilling&coring device in lunar exploration.Proc of the IEEE international conference on information and automation,2013 Aug.26–28;Yinchuan,China.Piscataway,NJ:IEEE Press;2013.p.79–84.

    6.Shi XM,Deng ZQ,Quan QQ,Tang DW,Hou XY,Jiang SY.Development of a drilling and coring test-bed for lunar subsurface exploration and preliminary experiments.Chin J Mech Eng2014;27(4):673–82.

    7.Heiken GH,Vaniman DT,French BM.Lunar sourcebook:a user’s guide to the moon.Paris:Cambridge University Press;1991.p.285–356.

    8.Lian Y.Inversion of composition and analysis of structure in the lunar subsurface from chang’e microwave data[dissertation].Changchun:Jilin University;2014[Chinese].

    9.Shi XM,Jie DG,Quan QQ,Tang DW,Jiang SY,Deng ZQ.Experimental research on lunar soil simulant drilling load analysis.Chin J Astronaut2014;35(6):648–56.

    10.Zhong Z.Theoretical and experimental analysis of the compaction process in a tapered screw press[dissertation].Newcastle:The University of Newcastle upon Tyne;1991.

    11.Robert A,Willis A.Performance of grain augers.Proc of the institute of mechanical engineers,vol.176,8.p.165–94.

    12.Zacny K,Quayle MC,Cooper GA.Laboratory drilling under martian conditions yields unexpected results.J Geophys Res2004;109(1):E07S16.

    13.Zacny K.Mars drilling-an investigation and development of techniques for drilling exploratory boreholes on mars[dissertation].Berkeley:University of California,Berkeley;2005.

    14.Tian Y,Deng ZQ,Tang DW,Jiang SY,Hou XY.Structure parameters optimization and simulation experiment of auger in lunar soil drilling-sampling device.Chin J Mech Eng2012;48(23):10–5.

    15.Deng ZQ,Tian Y,Tang DW,Jiang SY,Quan QQ,Xiao H.Research on new structure coring bit for extraterrestrial bodies exploration.Chin J Mech Eng2013;49(19):104–10.

    16.Vrettos C.Shear strength investigation for a class of extraterrestrial analogue soils.J Geotech Geoenviron Eng2012;138(4):508–15.

    17.Williams DE.To a rock moon:a geologist’s history of lunar exploration.Tucson:University of Arizona Press;1994.p.137–49.

    18.Butler JC,King EA.Analysis of grain size frequency distributions of lunar fines.Proc of 5th lunar planet science conference.p.829–41.

    19.Mitchell JK,Bromwell LG,Carrier III NC,Costes NC,Scott RF.Soil mechanical properties at the apollo 14 site.J Geophys Res1972;77(29):5641–64.

    20.Mitchell JK,Houston WH,Scott RF,Bromwell L.Mechanical properties of lunar soil:density,porosity,cohesion and angle of internalProc of the third lunar science conference.p.3235–53.

    21.Yan T.Rock and soil drilling technology.Wuhan:Chinese University of Geoscience Press;2001.p.65–92[Chinese].

    22.Shi XM,Tang DW,Quan QQ,Jiang SY,Hou XY,Deng ZQ.Development of a drilling and coring test-bed for lunar subsurface exploration.Proc of the IEEE international conference on robotics and biomimetics,2013 Dec.12–14;Shenzhen,China.Piscataway,NJ:IEEE Press;2013.p.2124–9.

    23.Quan QQ,Li P,Jiang SY,Hou XY,Tang DW,Deng ZQ,et al.Development of a rotary-percussive drilling mechanism(rpdm).Proc of the IEEE international conference on robotics and biomimetics,2012 Dec.11–14;Guangzhou,China.Piscataway,NJ:IEEE Press;2012.p.950–5.

    24.Ross I,Isaace G.Capacity of enclosed screw conveyors handling granular materials.Trans Am Soc Agric Eng1961;4(1):97–104.

    25.Mellor M.Mechanics of cuttings and boring.USA Army Cold Regions Research and Engineering Laboratory;1981,Report.

    26.Collins JA.Failure of materials in mechanical design:analysis,prediction,prevention.New York:Wiley;1993.p.105–85.

    27.Tang JY.Research on drilling strategy of lunar drilling and coring based on real-time recognition of drillability[dissertation].Harbin:Harbin Institute of Technology;2014[Chinese].

    28.Shi XM,Quan QQ,Tang DW,Jiang SY,Hou XY,Deng ZQ.Experimental research on drilling and sampling of lunar soil simulant.Appl Mech Mater2012;233(1):218–23.

    29.Richard WO,David MH.Apollo the definitive sourcebook.Chi Chester:Springer;2006.p.425–69.

    30.ShiH.Metalcuttingtheoryandpracticalnewperspective.Wuhan:Huazhong University of Science and Technology Press;2003.p.201–26[Chinese].

    1 February 2016;revised 14 March 2016;accepted 8 April 2016

    Available online 15 October 2016

    ?2016 Chinese Society of Aeronautics and Astronautics.Production and hosting by Elsevier Ltd.This is anopenaccessarticleundertheCCBY-NC-NDlicense(http://creativecommons.org/licenses/by-nc-nd/4.0/).

    *Corresponding authors.Tel.:+86 451 86413587.

    E-mail addresses:quanqiquan@hit.edu.cn(Q.Quan),jiangshy@hit.edu.cn(S.Jiang).

    Peer review under responsibility of Editorial Committee of CJA.

    国产国语露脸激情在线看| 久久久久视频综合| 午夜福利一区二区在线看| 免费看av在线观看网站| 亚洲精品日本国产第一区| 亚洲,一卡二卡三卡| 欧美久久黑人一区二区| 99热网站在线观看| 99精品久久久久人妻精品| 国产成人精品久久二区二区91 | 蜜桃国产av成人99| 侵犯人妻中文字幕一二三四区| 热re99久久国产66热| 欧美少妇被猛烈插入视频| av片东京热男人的天堂| 精品久久久久久电影网| 街头女战士在线观看网站| 欧美xxⅹ黑人| 亚洲国产精品一区二区三区在线| 黄频高清免费视频| 国产精品二区激情视频| 人妻一区二区av| 男女床上黄色一级片免费看| 免费在线观看完整版高清| 日韩欧美一区视频在线观看| 免费黄频网站在线观看国产| 免费黄网站久久成人精品| 国产精品一区二区在线观看99| 久久久久精品人妻al黑| 亚洲第一青青草原| 18禁国产床啪视频网站| 国产精品久久久人人做人人爽| 精品国产一区二区三区四区第35| 欧美精品高潮呻吟av久久| 91成人精品电影| 999精品在线视频| 晚上一个人看的免费电影| 最近的中文字幕免费完整| 国产精品一区二区精品视频观看| 国产片特级美女逼逼视频| 国产精品一区二区精品视频观看| 免费黄色在线免费观看| 久久久久精品性色| 老司机影院成人| 97人妻天天添夜夜摸| 国产精品嫩草影院av在线观看| 亚洲欧美清纯卡通| 夜夜骑夜夜射夜夜干| 五月天丁香电影| 好男人视频免费观看在线| 亚洲欧洲国产日韩| 久久这里只有精品19| a级毛片在线看网站| 女人高潮潮喷娇喘18禁视频| 国产伦人伦偷精品视频| 亚洲精品久久午夜乱码| 少妇被粗大猛烈的视频| 国产男人的电影天堂91| 777米奇影视久久| 日韩av免费高清视频| 欧美另类一区| 久久ye,这里只有精品| www.熟女人妻精品国产| 我的亚洲天堂| 热re99久久国产66热| 王馨瑶露胸无遮挡在线观看| 男男h啪啪无遮挡| 国产在视频线精品| av不卡在线播放| 最近2019中文字幕mv第一页| 97人妻天天添夜夜摸| 日韩 亚洲 欧美在线| 少妇人妻精品综合一区二区| 亚洲欧美中文字幕日韩二区| 国产精品国产三级国产专区5o| 晚上一个人看的免费电影| 飞空精品影院首页| av在线app专区| 一级爰片在线观看| 在线观看免费视频网站a站| 宅男免费午夜| 老汉色av国产亚洲站长工具| 日韩,欧美,国产一区二区三区| 黄色视频不卡| 一级毛片黄色毛片免费观看视频| 久久人妻熟女aⅴ| 男的添女的下面高潮视频| 两性夫妻黄色片| 日本vs欧美在线观看视频| 操美女的视频在线观看| 啦啦啦在线观看免费高清www| 国产日韩一区二区三区精品不卡| 国产精品女同一区二区软件| 男男h啪啪无遮挡| 国产片特级美女逼逼视频| 天堂俺去俺来也www色官网| 婷婷色av中文字幕| 18禁动态无遮挡网站| 国产亚洲精品第一综合不卡| avwww免费| 黄片小视频在线播放| 九草在线视频观看| 亚洲成人av在线免费| 久久人妻熟女aⅴ| 久久免费观看电影| 汤姆久久久久久久影院中文字幕| 久久99精品国语久久久| 制服诱惑二区| 欧美日韩一级在线毛片| 欧美日韩一级在线毛片| 看非洲黑人一级黄片| 成人国产麻豆网| 性少妇av在线| 熟女少妇亚洲综合色aaa.| 国产精品免费大片| xxxhd国产人妻xxx| 好男人视频免费观看在线| 热99国产精品久久久久久7| 老司机在亚洲福利影院| 在线免费观看不下载黄p国产| 欧美成人精品欧美一级黄| 少妇 在线观看| 麻豆乱淫一区二区| 如何舔出高潮| 亚洲成人免费av在线播放| 狠狠婷婷综合久久久久久88av| 黄色一级大片看看| 亚洲人成77777在线视频| 叶爱在线成人免费视频播放| 欧美在线一区亚洲| 欧美日韩成人在线一区二区| 亚洲天堂av无毛| 中国三级夫妇交换| 国产片内射在线| 亚洲色图综合在线观看| 美国免费a级毛片| 欧美成人午夜精品| 亚洲伊人色综图| 天天影视国产精品| 亚洲精品美女久久久久99蜜臀 | 日韩视频在线欧美| 亚洲男人天堂网一区| 亚洲人成77777在线视频| 亚洲一码二码三码区别大吗| 五月开心婷婷网| 亚洲中文av在线| 欧美精品人与动牲交sv欧美| 国产黄色免费在线视频| 免费在线观看黄色视频的| 十分钟在线观看高清视频www| 丰满乱子伦码专区| 欧美精品人与动牲交sv欧美| 久久精品亚洲熟妇少妇任你| 999精品在线视频| 国产精品久久久av美女十八| 久久天堂一区二区三区四区| 亚洲成色77777| 午夜福利网站1000一区二区三区| 婷婷色麻豆天堂久久| 精品久久久久久电影网| 精品一区在线观看国产| 亚洲成人手机| 狂野欧美激情性bbbbbb| 欧美成人精品欧美一级黄| 日韩制服丝袜自拍偷拍| 另类亚洲欧美激情| 大陆偷拍与自拍| 黄片无遮挡物在线观看| 成人国语在线视频| 国产人伦9x9x在线观看| 精品第一国产精品| 毛片一级片免费看久久久久| 黄色视频在线播放观看不卡| 国产精品熟女久久久久浪| 999精品在线视频| av在线老鸭窝| 久久天堂一区二区三区四区| 黄色一级大片看看| 欧美在线一区亚洲| 国产成人91sexporn| 黑人欧美特级aaaaaa片| 亚洲精品日本国产第一区| 欧美日韩亚洲高清精品| 日韩一区二区视频免费看| 国产免费现黄频在线看| 欧美精品一区二区大全| 亚洲欧洲国产日韩| 亚洲情色 制服丝袜| 国产在视频线精品| 飞空精品影院首页| 国产一卡二卡三卡精品 | 别揉我奶头~嗯~啊~动态视频 | 国产亚洲午夜精品一区二区久久| 午夜福利视频精品| 狂野欧美激情性bbbbbb| 老熟女久久久| 黄片小视频在线播放| 最近最新中文字幕大全免费视频 | 精品国产乱码久久久久久小说| 美女扒开内裤让男人捅视频| 国产1区2区3区精品| 97精品久久久久久久久久精品| 久久精品国产a三级三级三级| 赤兔流量卡办理| 亚洲av电影在线进入| av网站免费在线观看视频| 极品人妻少妇av视频| 久久久久久久精品精品| a级毛片黄视频| 涩涩av久久男人的天堂| 男女床上黄色一级片免费看| 人成视频在线观看免费观看| 一区二区av电影网| 一级毛片电影观看| 欧美人与性动交α欧美软件| 啦啦啦啦在线视频资源| 国产又爽黄色视频| 黄色视频不卡| 一区二区三区精品91| 多毛熟女@视频| 热99国产精品久久久久久7| 自线自在国产av| 婷婷色综合www| 日韩免费高清中文字幕av| 精品国产超薄肉色丝袜足j| 欧美黑人精品巨大| 夫妻性生交免费视频一级片| 少妇人妻 视频| 国精品久久久久久国模美| 水蜜桃什么品种好| 国产亚洲av片在线观看秒播厂| 黄色一级大片看看| av在线观看视频网站免费| 精品久久蜜臀av无| 美女福利国产在线| 少妇 在线观看| 在线观看一区二区三区激情| av有码第一页| 亚洲av国产av综合av卡| 最新在线观看一区二区三区 | 国产精品久久久久久人妻精品电影 | 97人妻天天添夜夜摸| 久久久久久久国产电影| 国产又色又爽无遮挡免| 国产免费福利视频在线观看| 哪个播放器可以免费观看大片| 亚洲欧洲精品一区二区精品久久久 | 精品一区在线观看国产| 色婷婷久久久亚洲欧美| av在线app专区| 欧美最新免费一区二区三区| 99热网站在线观看| 国产免费视频播放在线视频| 九色亚洲精品在线播放| 搡老岳熟女国产| 国产熟女欧美一区二区| 国产精品秋霞免费鲁丝片| 久久久久精品国产欧美久久久 | 新久久久久国产一级毛片| 人人妻人人爽人人添夜夜欢视频| 电影成人av| 欧美另类一区| 黄色视频在线播放观看不卡| 久久狼人影院| 国产熟女欧美一区二区| 亚洲欧美成人综合另类久久久| 一级片'在线观看视频| 黄色毛片三级朝国网站| 亚洲五月色婷婷综合| 久久久久久久国产电影| 久久久欧美国产精品| 大话2 男鬼变身卡| 亚洲av男天堂| netflix在线观看网站| 天堂俺去俺来也www色官网| 免费看不卡的av| 久久精品国产亚洲av高清一级| 国产成人91sexporn| 一区二区三区乱码不卡18| 99久久人妻综合| 精品酒店卫生间| 青草久久国产| 高清av免费在线| 老司机深夜福利视频在线观看 | 午夜福利网站1000一区二区三区| 色婷婷av一区二区三区视频| 久久精品国产综合久久久| 九九爱精品视频在线观看| 久久久久精品人妻al黑| 免费高清在线观看视频在线观看| 国产视频首页在线观看| a 毛片基地| 亚洲精华国产精华液的使用体验| 中文字幕人妻丝袜制服| 最近最新中文字幕免费大全7| 亚洲国产欧美网| 涩涩av久久男人的天堂| 国产av精品麻豆| 视频区图区小说| 久久99热这里只频精品6学生| 免费黄色在线免费观看| 国产一卡二卡三卡精品 | 亚洲免费av在线视频| 日韩欧美精品免费久久| 丁香六月天网| 国产男女超爽视频在线观看| 久久这里只有精品19| av国产久精品久网站免费入址| 久久人人97超碰香蕉20202| 亚洲中文av在线| 日韩精品有码人妻一区| 男男h啪啪无遮挡| 亚洲成人免费av在线播放| 国产熟女欧美一区二区| 日韩一卡2卡3卡4卡2021年| 一级毛片我不卡| av线在线观看网站| 色94色欧美一区二区| 成人国产麻豆网| 国产免费一区二区三区四区乱码| 涩涩av久久男人的天堂| 欧美日韩一区二区视频在线观看视频在线| 欧美人与性动交α欧美精品济南到| 国产免费视频播放在线视频| 国产乱人偷精品视频| 国产精品av久久久久免费| av又黄又爽大尺度在线免费看| 在现免费观看毛片| 在线观看免费视频网站a站| 又大又爽又粗| 青青草视频在线视频观看| 老汉色∧v一级毛片| 精品人妻熟女毛片av久久网站| 男人操女人黄网站| 天美传媒精品一区二区| 国产亚洲一区二区精品| 午夜福利,免费看| 视频区图区小说| 涩涩av久久男人的天堂| 最近中文字幕2019免费版| 亚洲免费av在线视频| 国产精品99久久99久久久不卡 | 大码成人一级视频| 在现免费观看毛片| 日韩欧美一区视频在线观看| 男女免费视频国产| 制服人妻中文乱码| 亚洲av综合色区一区| 在线天堂中文资源库| 精品国产一区二区久久| 丁香六月欧美| 男女午夜视频在线观看| 美女脱内裤让男人舔精品视频| 午夜老司机福利片| 亚洲四区av| 午夜免费男女啪啪视频观看| 国产熟女午夜一区二区三区| 91精品伊人久久大香线蕉| 国产日韩欧美亚洲二区| 男的添女的下面高潮视频| 黄片播放在线免费| 中文字幕制服av| 大陆偷拍与自拍| 啦啦啦在线观看免费高清www| 最近的中文字幕免费完整| 亚洲国产日韩一区二区| 国产成人免费观看mmmm| 国产精品99久久99久久久不卡 | 日本猛色少妇xxxxx猛交久久| 少妇 在线观看| 宅男免费午夜| 最黄视频免费看| 欧美人与性动交α欧美软件| 成人午夜精彩视频在线观看| 久久天躁狠狠躁夜夜2o2o | www.熟女人妻精品国产| 国产成人欧美| 久久免费观看电影| 在线观看国产h片| 婷婷色av中文字幕| 丝袜美腿诱惑在线| 亚洲av电影在线观看一区二区三区| 国产成人欧美| 丝袜美腿诱惑在线| 国产成人啪精品午夜网站| 国产精品久久久久久久久免| 你懂的网址亚洲精品在线观看| 国产视频首页在线观看| 18禁观看日本| 男女下面插进去视频免费观看| 欧美久久黑人一区二区| 国产深夜福利视频在线观看| 天堂中文最新版在线下载| 中国国产av一级| 精品人妻一区二区三区麻豆| 最新的欧美精品一区二区| 亚洲,一卡二卡三卡| 美女午夜性视频免费| 又大又爽又粗| 99久久99久久久精品蜜桃| 国产午夜精品一二区理论片| 少妇人妻 视频| 国产片特级美女逼逼视频| 91精品三级在线观看| 极品人妻少妇av视频| 日韩一区二区三区影片| 老司机影院毛片| 夫妻午夜视频| www.自偷自拍.com| 国产精品 国内视频| 一区二区三区四区激情视频| 精品国产一区二区三区四区第35| 国产精品国产三级专区第一集| 啦啦啦在线免费观看视频4| 精品国产一区二区三区四区第35| 日本色播在线视频| 日韩免费高清中文字幕av| 久久久精品免费免费高清| 亚洲欧洲国产日韩| 水蜜桃什么品种好| www.av在线官网国产| 2018国产大陆天天弄谢| 黄网站色视频无遮挡免费观看| 午夜福利乱码中文字幕| 99热国产这里只有精品6| 亚洲,一卡二卡三卡| 国产精品蜜桃在线观看| 交换朋友夫妻互换小说| 久久 成人 亚洲| 久久精品熟女亚洲av麻豆精品| 免费在线观看黄色视频的| 丝袜脚勾引网站| 欧美最新免费一区二区三区| 亚洲国产精品一区三区| 国产精品久久久av美女十八| 午夜av观看不卡| 国产片特级美女逼逼视频| 看十八女毛片水多多多| 搡老乐熟女国产| 国产精品久久久av美女十八| 99精品久久久久人妻精品| 狂野欧美激情性bbbbbb| 亚洲av电影在线进入| 一级毛片电影观看| 亚洲av成人不卡在线观看播放网 | 色婷婷av一区二区三区视频| 人人妻人人添人人爽欧美一区卜| 男人爽女人下面视频在线观看| 精品国产超薄肉色丝袜足j| 国产又爽黄色视频| 国产精品.久久久| 精品国产露脸久久av麻豆| 成人国语在线视频| 丝袜脚勾引网站| 女性生殖器流出的白浆| 国产精品免费大片| 亚洲av成人不卡在线观看播放网 | 人人妻人人澡人人看| 卡戴珊不雅视频在线播放| 成人午夜精彩视频在线观看| 国产精品秋霞免费鲁丝片| 亚洲精品中文字幕在线视频| 亚洲国产精品一区二区三区在线| 丁香六月欧美| 国产成人午夜福利电影在线观看| 色婷婷av一区二区三区视频| 精品国产超薄肉色丝袜足j| 欧美xxⅹ黑人| 亚洲成人手机| 不卡视频在线观看欧美| 热99久久久久精品小说推荐| 国产精品人妻久久久影院| 亚洲av在线观看美女高潮| 成人手机av| 天堂俺去俺来也www色官网| 天天躁夜夜躁狠狠久久av| 在线 av 中文字幕| 成年美女黄网站色视频大全免费| 午夜91福利影院| 久久国产精品大桥未久av| 91精品国产国语对白视频| 精品人妻熟女毛片av久久网站| 国产一区二区 视频在线| kizo精华| 国产精品一区二区在线不卡| 国产又色又爽无遮挡免| 国产亚洲最大av| 午夜福利一区二区在线看| 多毛熟女@视频| 精品一品国产午夜福利视频| 日韩中文字幕视频在线看片| 国产精品麻豆人妻色哟哟久久| 可以免费在线观看a视频的电影网站 | 午夜福利,免费看| 亚洲情色 制服丝袜| 人妻一区二区av| 国产免费视频播放在线视频| 交换朋友夫妻互换小说| 中文字幕制服av| 亚洲综合色网址| 亚洲久久久国产精品| 一区二区三区乱码不卡18| 午夜日本视频在线| 乱人伦中国视频| 多毛熟女@视频| 国产在线免费精品| 9热在线视频观看99| 午夜av观看不卡| 天天躁狠狠躁夜夜躁狠狠躁| 9色porny在线观看| 香蕉丝袜av| 国产精品国产三级国产专区5o| 国产麻豆69| 少妇被粗大的猛进出69影院| 亚洲成人手机| 日韩av在线免费看完整版不卡| 纯流量卡能插随身wifi吗| 啦啦啦在线观看免费高清www| 人妻一区二区av| 午夜福利影视在线免费观看| 国产精品偷伦视频观看了| videos熟女内射| 久久久久精品国产欧美久久久 | 精品人妻一区二区三区麻豆| av天堂久久9| 色网站视频免费| 亚洲五月色婷婷综合| 精品一区二区三区四区五区乱码 | 久久精品人人爽人人爽视色| 欧美精品亚洲一区二区| 亚洲精品久久久久久婷婷小说| 亚洲国产欧美日韩在线播放| 午夜激情久久久久久久| 19禁男女啪啪无遮挡网站| 一边摸一边抽搐一进一出视频| 最黄视频免费看| 久久婷婷青草| 男男h啪啪无遮挡| 亚洲激情五月婷婷啪啪| 伊人久久国产一区二区| 久久影院123| 香蕉丝袜av| 久久久久久免费高清国产稀缺| 国产成人欧美在线观看 | 午夜av观看不卡| 天天影视国产精品| 一区二区三区四区激情视频| 男的添女的下面高潮视频| 亚洲专区中文字幕在线 | 五月开心婷婷网| 九色亚洲精品在线播放| 日韩一卡2卡3卡4卡2021年| 亚洲精品一二三| 亚洲欧美一区二区三区久久| 国产精品偷伦视频观看了| 欧美精品高潮呻吟av久久| xxxhd国产人妻xxx| 精品福利永久在线观看| 久久精品国产a三级三级三级| 国产人伦9x9x在线观看| 精品国产乱码久久久久久男人| 免费看av在线观看网站| 久久久国产一区二区| 国产精品.久久久| 亚洲精品第二区| 日韩大片免费观看网站| 老汉色av国产亚洲站长工具| a 毛片基地| 亚洲伊人久久精品综合| 人人妻人人爽人人添夜夜欢视频| 老司机亚洲免费影院| 国产欧美日韩综合在线一区二区| 国产精品久久久人人做人人爽| 日韩欧美精品免费久久| 国产精品一国产av| 国产精品香港三级国产av潘金莲 | 亚洲少妇的诱惑av| 国产成人av激情在线播放| 纵有疾风起免费观看全集完整版| 嫩草影视91久久| 青春草亚洲视频在线观看| 国产成人精品久久久久久| 女人被躁到高潮嗷嗷叫费观| 男女高潮啪啪啪动态图| 欧美激情高清一区二区三区 | 操美女的视频在线观看| 亚洲久久久国产精品| 欧美日韩av久久| 免费不卡黄色视频| 亚洲精品美女久久久久99蜜臀 | 国产成人午夜福利电影在线观看| 无限看片的www在线观看| 最黄视频免费看| 国产不卡av网站在线观看| 亚洲欧美清纯卡通| av福利片在线| 国产不卡av网站在线观看| 不卡av一区二区三区| 视频区图区小说| 久久av网站| 国产精品久久久久久精品电影小说| 极品人妻少妇av视频| 亚洲在久久综合| 亚洲欧美一区二区三区国产| 最近最新中文字幕免费大全7| 九草在线视频观看| 国产日韩欧美视频二区| 午夜激情久久久久久久| 亚洲av电影在线进入| 亚洲成人一二三区av| 国产精品 欧美亚洲| 免费观看av网站的网址| 中文字幕亚洲精品专区| 中国国产av一级| 中文天堂在线官网|