迪拜地鐵站
位置:阿聯(lián)酋迪拜
業(yè)主:迪拜道路及交通局
服務(wù)范圍:設(shè)計(jì)及項(xiàng)目建筑師
竣工年份:2009年(一期)
項(xiàng)目規(guī)模:地鐵線路總長 74 公里,共有 45 個(gè)地鐵站點(diǎn)
Location: Dubai, UAE
Client: Roads and Transport Authority
Involvement: Design and Project Architect
Completion Year: 2009 (Phase I)
Project Scale: Total of 74km of lines and 45 stations
迪拜地鐵站項(xiàng)目作為中東地區(qū)首個(gè)地下鐵路系統(tǒng),總長 74 公里,共 45 個(gè)車站,分別坐落于約 52 000 米長的紅線及 22 000 米長的綠線。設(shè)計(jì)充分響應(yīng)委托方設(shè)計(jì)獨(dú)特、富地標(biāo)性,風(fēng)格貫徹一致的特定要求。別樹一幟的車站設(shè)計(jì)包括車站圓錐形的外殼設(shè)計(jì),展示了 30 米高呈彎曲狀的懸臂。
The project is the first metro system in the Middle East, comprising the 52-kilometre long Red Line and the 22-kilometre long Green Line with a total of 45 stations. The iconic family of stations, developed with input from the R&D team, includes conic shells that feature sweeping cantilevers which soar to over 30 metres.
作品推介
PROJECT INTRODUCTION
Dubai Metro