    A Mathematical Model Based on Supply Chain Optimization for International Petrochemical Engineering Projects

    2015-06-22 14:38:29GaoNingSunWei
    中國煉油與石油化工 2015年2期

    Gao Ning; Sun Wei

    (1. College of Chemical Engineering, Beijing University of Chemical Technology, Beijing 100029; 2. SINOPEC Great Wall Energy and Chemical Co., Ltd., Beijing 100120)

    A Mathematical Model Based on Supply Chain Optimization for International Petrochemical Engineering Projects

    Gao Ning1,2; Sun Wei1

    (1. College of Chemical Engineering, Beijing University of Chemical Technology, Beijing 100029; 2. SINOPEC Great Wall Energy and Chemical Co., Ltd., Beijing 100120)

    Based on the study of supply chain (SC) and SC optimization in engineering projects, a mixed integer nonlinear programming (MINLP) optimization model is developed to minimize the total SC cost for international petrochemical engineering projects. A steam cracking project is selected and analyzed, from which typical SC characteristics in international engineering projects in the area of petrochemical industry are summarized. The MINLP model is therefore developed and applied to projects with detailed data. The optimization results are analyzed and compared by the MINLP model, indicating that they are appropriate to SC management practice in engineering projects, and are consistent with the optimal priceeffective strategy in procurement. As a result, the model could provide useful guidance to SC optimization of international engineering projects in petrochemical industry, and improve SC management by selecting more reliable and qualified partner enterprises in SC for the project.

    supply chain, optimization, model, engineering project, MINLP

    1 Introduction

    Supply chain (SC) is defined as a multifaceted structure focusing on the integration of all factors involved in the overall process of procurement, production and distribution of end products to the customers. SC is usually characterized by the forward flow of materials/goods and the bi-directional flow of information[1-3].

    The concept of supply chain management (SCM), is a set of approaches utilized to minimize the system-wide costs while satisfying the service requirements by integrating SC[4-5]. In order to optimize the performance of SC, attention was mainly paid to the development of supply chain modeling. SC can be described by using a mathematical programming model or a simulation-based model[6-9]. Usually, mathematical programming models can be applied at different levels, from operational to top decision level, while the simulation-based method is more focused on operational details.

    In SCM research on petrochemical industry, Sear[10]developed a linear programming (LP) model for planning material flow in an oil company. Escudero introduced uncertainties in supply costs, demands and product prices through a nonlinear programming (NP) model to optimize the supply, transformation and distribution of an oil company[11]. Later studies show that the situation of real world problem can be better described by mixed-integer nonlinear programming (MINLP) models, in which integer variables are introduced to represent choices of different nodes and nonlinear constraints or objective functions are employed to represent nonlinear realities in the SC[12-15]. Few studies threw light on SC optimization for petrochemical engineering projects. However, researches on engineering projects in similar industries may provide meaningful points forReference[16-17]. Large capital investments are invested in engineering projects, in which a large proportion is tied up by procurement. Production safety would be impacted directly by the quality of procured equipment, which is also the top concern in petrochemical industry. Procurement has to be guaranteed from an integrated view, and suppliers become a key factor in SC of engineering projects. Besides, major equipment/ materials in petrochemical engineering projects had to bedesigned and manufactured specifically. Furthermore, to achieve a better performance of SC there could be different sourcing options with varied supplier selection, which would make SC structures more complicated. To make the SC optimization of such case, mathematical programming models are applicable. The aim of SC optimization is to achieve certain project performance, usually a cost related objective, by considering all possible combination of supplier selections, their inter-dependence and within all constraints[18].

    2 Model Development

    2.1 Typical project and SC characteristics

    A steam cracking project M, as the typical engineering project in petrochemical industry, was selected as the research object for developing the MINLP optimization model. A top Chinese petrochemical company worked as the main contractor in Project M. SCM was one of the key issues to assure project success[19].

    The SC of Project M could be described as follows. Firstly, it is a typical aggregate structure without the Sales Section. The main contractor leads the project on EPCM (engineering, procurement and construction management) basis. Secondly, more than 230 equipment and materials (collectively called items) need to be purchased from various suppliers in different countries. The procurement cost of items constitutes 70% of EPCM contract price, which means that procurement has a critical importance in the SC of project M. The SC cost is affected by many factors, including the procurement cost, the supervision cost, the transportation cost, the tax refund and other expenses. Thirdly, all items should be purchased in compliance with proper technical standards from qualified suppliers in global resources. To guarantee the quality and schedule of project, the optimal price-effective orientation is taken as the procurement strategy in Project M. Due to the inter-dependence relationship among items in Project M, different procurement options are available. These options will lead to different supplier selections and have influence on the final cost and structure of the supply chain. The SC characteristics of international petrochemical engineering projects can be summarized in accordance with the above characteristics of Project M.

    (1) Procurement management is the key of SC optimization in international petrochemical engineering projects due to procurement’s big impact on the overall cost and schedule of project.

    (2) The SC is a typical aggregate structure of core enterprise and partner enterprises. In the procurement of projects, the interaction by main contractor acting as the core enterprise with suppliers acting as partner enterprises constitutes the main content of SC activities, and makes the SC an aggregate structure, which means that more efforts should be focused on the relationship between the core enterprise and the partner enterprises.

    (3) Procurement on a global basis increases the complexity of SC cost. There are many factors affecting SC cost, and make it more complex to minimize SC cost in international engineering projects.

    (4) The selection of suppliers should be based on a comprehensive view to improve SC efficiency and decrease SC cost. Specially designed strategy is needed for supplier selection, and the different impact of different items on project should also be considered. A comprehensive view should be taken into account for the evaluation and selection of suppliers as partner enterprises in SC.

    In brief, for a better SC optimization modeling of petrochemical engineering projects, it is important to focus on the procurement management in SC, optimize the relationship between the core enterprise and the partner enterprises, take all related factors into consideration and make the optimization arising out of a comprehensive view.

    2.2 Assumptions for modeling

    Based on the complexity of SC in petrochemical engineering projects, some assumptions are made for modeling to address key issues.

    (1) The relationship of the project contractor and suppliers is more emphasized in model developing, and the selection of suppliers and their interaction with contractor is the key issue for research in this paper.

    (2) Twelve typical items are selected and analyzed to simplify problems and to be easy of expression. They are separated into three groups, i.e.: the furnace components group (4 items), the auxiliary equipment group (6 items), and the basic materials group (2 items). The items, groups and possible supplier sourcing countries are shown in Figure 1.

    Figure 1 Typical item selection in steam cracking project for SC optimization

    (3) The Business Credit Factor is used as the quantitative factor to evaluate each supplier’s performance in the project. Suppliers with higher Business Credit Factors are deemed to be more reliable in SC practice. The factors are collected upon years of statistics about millions of data. At the same time, the Importance Level is used to evaluate the importance of each item in the project. Items with higher Importance Level are deemed to be more important in SC practice. According to the consequence of quality failure or late delivery of an item in the project, all items are separated into A, B and C levels based on their quality importance, and are separated into 1, 2, 3, and 4 levels based on their delivery importance[20].

    (4) In petrochemical engineering projects, the number of suppliers for each item should be minimized after evaluation, which is helpful for a better efficiency of procurement management, after-sales service, spare parts supply and training/operation of personnel at site. 0-1 variables are introduced as constraints to reflect this fact. Suppliers are from different countries. The main contractor will buy Chinese products in RMB when necessary and get tax refund from itself. All necessary custom taxes of the items collected in the project country should be borne by the project owner.

    (5) Some other assumptions related to SC cost are made. The supervision cost is proportional to the procurement cost of an item. The supervision cost for a foreign supplier is assumed to be 1.5 times higher than a domestic one. All items are transported in bulk-cargo or containers, which means transportation cost is mainly the ocean transportation fee. The insurance fee or transportation fee within one country is ignored. The schedule of four activities in SC is indicated as milestones of the project, including engineering, procurement, transportation and construction. Time constraints should be applied accordingly.

    3 Model Formulations

    Based on the above-mentioned assumptions, a new MINLP model is developed for SC optimization. Supplier selection in the model should be described by integer variables. The inter-dependence between suppliers in SC would be described as one set of constraints. The final SC structure, i.e., optimal supplier selection and their interdependence retionship will be determined by the model developed thereby.

    Among all the related costs, five major costs affecting total SC cost are considered in SC optimization. Therefore the developed MINLP model could be described as follows.The objective function of the model, the minimum total SC cost, is defined by Formula (1):

    where TPC, TSC, TIC, TTC, TER and TEC stand for the total procurement cost, the total supervision cost, the total inventory cost, the total transportation cost, the total export refund and the total evaluation cost, respectively.

    3.1 Model formulations

    3.1.1 Determination of TPC

    The total procurement cost, TPC, is the total sum of all purchasing costs for items provided by the suppliers. TPC is determined by Formula (2)

    TPC is obtained by the unit item cost, PCgji, multiplied by the purchased quantity, quantitygji.

    In the formulation shown above, g is the index for each item group ranging from 1 to 3, i.e.: group 1 covers the furnace components, group 2 covers the auxiliary equipment, and group 3 covers basic materials. Then j is the index for each item in group g, andiis the index for each supplier of item j in group g. Zgjiis a binary integer variable, indicating whether the supplieriis selected for item j in item group g.is the exchange rate of foreign currency to RMB in procurement activity.

    PCgjiis the procurement cost for item j from supplieriin group g, and it can be obtained from Formula (3)

    BIDPCgjiis the quotation price from supplierifor item j in item group g. Here αgjiis the discount and Ugjiis a binary integer variable, indicating whether the discount is available to the procurement of item j. When two items could be manufactured and purchased by a package procurement, a discount αgjiwill be provided by the supplier.

    3.1.2 Determination of TSC

    The total supervision cost, TSC, is the fee paid to supervision companies to ensure manufacturing quality of major items. TSC is calculated by Formula (4)

    TSC is related to the purchase cost and the location of the supplier. When item j in Group g is purchased from China, the value of Ygjibinary integer variable is 1. As in the assumption, TSC will be 1.5 times greater in a foreign supplier.

    βgjis the proportion of supervision cost to PCgji. The value of βgjis determined by Formula (5) originated from the practice in petrochemical engineering projects. It can be seen that βgjis related to QKgj, the Imporeance Level of item.

    QKgjreflects its influence of that related item on the quality and schedule of a project, whose value ranges from 1.5 to 5.

    3.1.3 Determination of TTC

    The total transportation cost, TTC, is calculated on the basis of ocean transportation, either in container or bulk cargo. TTC is defined by Formula (6)

    TTC is described as the unit freight rate TCngji(in containers) or TCgji(in bulk careo) multiplied by WEIgji. The unit freight rates are collected from logistics enterprises. Ngjiis an integer variable indicating whether the items are transported in containers or in buil careo.

    3.1.4 Determination of TIC

    The total inventory cost, TIC, generally accounts for a small portion of total SC cost of international petrochemical engineering projects. TIC is given by Formula (7)

    INVCgjiis the unit inventory cost. INVTgjiis the inventory time of item j in group g. WEIgjiis the weight of item j in group g.

    3.1.5 Determination of TER

    The total export refund, TER, is only available to Chinese items, which are purchased in RMB by the contractor. TER is determined by Formula (8)

    TER is a function of PCgjiand the rate of export refund exrategj. The category of items and their rates of export refund are determined by the relevant regulations of Chinese authorities, and are acquired from published resources.

    3.1.6 Determination of TEC

    The total evaluation cost, TEC, is a virtual cost to make correction of suppliers’ procurement cost on overall view, in which the performance of different suppliers and the importance of different items in the project should be taken into consideration. When supplying the same items, outstanding suppliers, viz. suppliers with better Business Credit Factor above average, will get a negative correction of their procurement cost in evaluation to increase their competitiveness thereupon. For those suppliers below the average, the evaluation effect is on the contrary. With the introduction of TEC, the opportunity of outstanding suppliers is enhanced to be able to supply high quality products when providing important items. It follows the strategy of optimal price-effective scenario in procurement, which is clearly different from traditional procurement evaluation. The latter mainly focuses on direct purchasing cost, and always selects suppliers that can offer lowest prices. TEC is determined by Formula (9)

    3.2 Constraints in the model

    Decision variables, which characterize the partner enterprise selection in the SC, including those binary integer variables Zgji, Ugji, Ngji, Ygji, shall follow the formulas as shown below:

    The constraint on supplier selection is defined b Formula (11),

    Only one supplier for item j in group g can be selected. Whether the discount available for procurement is constrained by Formula (12),

    Whether the transportation for item j from supplieriin group g is in bulk cargo or containers should be selected and only one choice is available by Formula (13),

    TSC and TER can be affected by whether the supplierifor item j in group g is from China or not, which can be speculated by the exchange rate as expressed by Formula (14),

    Ygjiis an integer variable.

    All these binary integer variables can be constrained as

    Different procurement options will lead to different supplier selection. Constraints representing the inter-dependence between suppliers are listed as follows:

    When two items could be manufactured and procured from a same supplier, a discount αgjiwill be provided by the supplier.

    A threshold of Business Credit Factoris set for some key items. It will be determined by the contractor in dif-ferent projects. The Business Credit Factorof supplierifor item j in group g should not be lower than the threshold value, otherwise the supplier will be excluded due to its violation of the requirements of the project.

    Time nodes of activities in SC are defined as Xgjim, m is the index for the activities ranging from 1 to 4, including the beginning of procurement, the beginning of transportation, the end of transportation, and finally the completion of project.

    Tgmis the time limit for Xgjimat each stage.

    Completion of the whole stage of a petrochemical engineering project is described as DEL and can be limited by the following constraint.

    4 Results and Discussion

    4.1 Data of projects

    The developed MINLP model is applied to two projects, Project M and Project A. Project A is a steam cracking project scheduled to be built by the contractor in a developed country. The two projects have similar technology processes as well as similar items and relevant suppliers. However, as they are in different locations and at different time durations, the exchange rate of currency and some other factors are different. The most important difference is that there are more stringent requirements for suppliers in Project A. As it is in a developed country, more concerns are paid to the project procurement conditions like the quality, the energy consumption, the environmental protection regulations and other non-price-related issues. Therefore more reliable suppliers are tended to be selected with the unqualified suppliers being knocked out. The engineering data of the two projects are shown in Table 1. The Linear Interactive and General Optimizer (LINGO) is selected as the tool to solve the proposed MINLP problem. During the SC optimization, all possible combination of suppliers and inter-dependence among them are considered. The optimal supplier selection as partner enterprises in SC and their relationship with core enterprises are obtained by the model.

    4.2 Optimization results of Project M

    After optimization, the objective of model, viz.: the total SC cost of Project M, is RMB 34.46 million. TPC, TSC, TTC, TIC, TER and TEC are RMB 33.95, 0.27, 2.07, 0.03, -2.35 and 0.48 million, respectively. The optimal supplier selection in SC obtained is shown in shadows in Table 1. To express more clearly, the optimized supplier selection in SC of Project M by the MINLP model is shown in Figure 2. The solid line indicates that a certain supplier is included in the optimized SC, while the dash line indicates a certain supplier is excluded in the optimized SC.

    It could be seen that suppliers for twelve items are all successfully determined by the model. They are from three countries, including 9 suppliers from China, 2 suppliers from Germany and 1 supplier from America. Three items, i.e. Equipment 1, 4, and 6 are determined to be sourced from the developed countries. At the same time, three of them are with high Importance Levels, denoting that they are critical items in Project M, and should be purchased from more reliable suppliers with more reliable performance. The model result is in line with the procurement reality in petrochemical engineering projects.

    Optimized selection does not necessarily mean selection of suppliers which can offer the lowest prices. It could be found that four items in the optimized SC are not to be procured at their lowest price, including the Component 2, and the Equipment 1, 4 and 6. A comprehensive evaluation is made by the MINLP model on the procurement cost, the exchange rate, the transportation cost, the export refund, the Business Credit Factor and other factors, and therefore the result is determined based on the comprehensive assessment. For example, Equipment 4 is a key item with high Importance Level and a threshold for Business Credit Factor. The American supplier H3 is chosen, while H1 is excluded by the model because this supplier does not qualify for the Business Credit Factor. The model results show that the lowest procurement cost is not the selection standard, because it should comply with the comprehensive view. It means that the model is appropriate to the optimal price-effective procurement strategy, and could improve SC management by selectingSC partners who are more reliable and qualified for the project.

    Table 1 Data of Project M and Project

    Figure 2 Optimized supplier selections in SC of Project M by the MINLP model

    4.3 Optimization results of Project A

    After optimization, the total SC cost of Project A is RMB 35.70 million. TPC, TSC, TTC, TIC, TER and TEC are RMB 36.88 million, 0.30 million, 2.89 million, 0.03 million, -2.37 million and -2.03 million, respectively. The value of TEC is negative, indicating that the optimal suppliers selected by the model are characteristic of higher Business Credit Factor, which demonstrates that outstanding suppliers are more competitive in Project A.

    The optimization results of supplier selection by the MINLP model are shown in shadow in Table 1. It can be seen that suppliers as partner enterprises in SC are successfully determined by the model. Twelve suppliers are obtained, including 6 suppliers selected from the developed countries to supply Equipment 1, 3, 4, 5, 6 and Basic material 1. The model result is in line with the procurement practice of those petrochemical engineering projects in the developed countries.

    Upon comparing with the souring option in regard to price, it could be found that 9 items in the optimized SC of Project A are not at the lowest price. As mentioned above, more stringent requirements for suppliers are put forward to petrochemical engineering projects of the developed country, and suppliers with higher Business Credit Factor are likely to be selected. For example, as to Component 3, the supplier C2 can offer a lowest price. But its Business Credit Factor is less than the threshold value set in Project A. Thus the supplier C2 is excluded in the optimized SC. Although the price of the supplier C1 is the highest, its Business Credit Factor is highest too, indicating that the supplier C1 is relatively better in performance and more reliable for implementing the project SC. Finally the supplier C1 is selected as the optimal one for Component 3 by the MINLP model. It is again verified that the model results are in line with the SC management practice in different countries, and can embody the optimal price-effective strategy in procurement practice of projects.

    4.4 Comparison of optimized results

    The established MINLP model is successfully applied to both Project M and Project A. By carrying out the optimal supplier selection determined by the model, it can be found out that there are 7 different supplier selection suitable for the Projects M and A, including the component 1,3, and 4, the equipment 2, 3, and 5, and the basic material 2. In the Project M, more Chinese suppliers are proposed by the model. While in Project A there are more suppliers from the developed countries, and fewer suppliers from China. At the same time, 8 suppliers that can offer the lowest price are selected in SC optimization of Project M, while only 3 suppliers in Project A. These facts show that there are different conditions existing in different projects, and the model is confirmed to be applicable to SC optimization in different projects.

    Figure 3 SC structure of Project A optimized by the MINLP model

    There are other differences between the model results in Projects M and A. In the model results of Project A, Component 1 is from the supplier A, and Component 2 is from the supplier B separately. However, Components 1 and 2 are selected to be supplied by the supplier A as a package in the model results of Project M, which makes different SC structures of the two projects. The SC structure of Project A optimized by the MINLP model is shown in Figure 3

    Figure 3 shows that the main contractor acts as the core enterprise, and the suppliers act as partner enterprises in SC. The core enterprise of SC has a direct relationship with 11 suppliers after SC optimization by the MINLP model. Three suppliers, i.e., the suppliers A, B and C, are selected to supply components. Component 4 is optimized to be supplied by the supplier A, which means the supplier D becomes a sub-supplier of the supplier A.

    It can be found that Project M has a different SC structure. The core enterprise would have direct relationship with 10 suppliers, and the supplier A is selected to supply both Components 1 and 2. It means that the SC structure determined by the MINLP model could change to adapt for better performance of SC in different projects.

    5 Conclusions

    In this paper, a MINLP model is developed to minimize the total SC cost of international engineering projects in petrochemical industry. Through studies on steam cracking project, four typical characteristics of international petrochemical engineering projects are summarized. The model focuses a special attention on the procurement management and the relationship between the core enterprise and the partner enterprises, trying to make the optimization on a comprehensive view while taking all related factors into consideration.

    The developed MINLP model is proved to be successful in the two typical engineering projects of petrochemical industry. The SC optimization results solved by the MINLP model aim at achieving the minimum total SC cost on a comprehensive view, and are not in pursuit of the lowest price. The model results are found to be in accordance with the different procurement strategies and practice in these countries. Besides the determination of the supplier selection as partner enterprises and their inter-dependence relationship in SC, the MINLP model can also determine SC structures which can be adapted to achieve better performance of SC. As a conclusion, the model is capable of providing useful guidance for SC optimization in petrochemical engineering project, and can improve SC management by selecting SC partners who are more reliable and qualified for the project.

    This is an exploratory paper and more research needs to be conducted in this area. In the future research, morepetrochemical projects with sufficient actual data should be studied by the MINLP model. It is suggested that although the MINLP model is developed based on international engineering projects in petrochemical industry, the idea and method are also applicable to other engineering project in process industry for SC optimization.

    [1] Min H, Zhou G. Supply chain modeling: Past, present and future[J]. Computers & Industrial Engineering, 2002, 43(1): 231-249

    [2] Beamon B M. Supply chain design and analysis: Models and methods[J]. International Journal of Production Economics, 1998, 55(3): 281-294

    [3] Sabbaghi A, Sabbaghi N. Global supply-chain strategy and global competitiveness[J]. International Business & Economics Research Journal, 2001, 3(7): 63-76

    [4] Stadtler H. Supply chain management and advanced planning--basics, overview and challenges[J]. European Journal of Operational Research, 2005, 163(3): 575-588

    [5] Shapiro J F. Challenges of strategic supply chain planning and modeling[J]. Computers & Chemical Engineering, 2004, 28(6): 855-861

    [6] PapageorgioulG, Supply chain optimization for the process industries, advances and opportunities[J]. Computers & Chemical Engineering, 2009, 33(12): 1931-1938

    [7] Grossmann I. Enterprise-wide optimization: A new frontier in process systems engineering[J]. AIChE Journal, 2005, 51(7): 1846-1857

    [8] Longo F, Mirabelli G. An advanced supply chain management tool based on modeling and simulation[J]. Computers & Industrial Engineering, 2008, 54(3): 570-588

    [9] Van der Zee D J, Van der Vorst J G, A modeling framework for supply chain simulation: Opportunities for improved decision making[J]. Decision Sciences, 2005, 36(1): 65-95

    [10] Sear T N. Logistics planning in the downstream oil industry[J]. Journal of the Operational Research Society, 1993, 44 (1): 9-17

    [11] EscuderolF, Quintana F J, Salmerón J. CORO, a modeling and an algorithmic framework for oil supply, transformation and distribution optimization under uncertainty[J]. European Journal of Operational Research, 1999, 114(3): 638-656

    [12] Lasschuit W, Thijssen N. Supporting supply chain planning and scheduling decisions in the oil and chemical industry[J]. Computers and Chemical Engineering, 2004, 28(6): 863-870

    [13] Ross A D. Performance-based strategic resource allocation in supply networks[J]. International Journal of Production Economics, 2000, 63(3): 255-266

    [14] You F, GrossmanniE. Integrated multiechelon supply chain design with inventories under uncertainty: MINLP models[J]. AIChE Journal, 2010, 56(2): 419-440

    [15] Liu S, PapageorgioulG. Multi objective optimization of production, distribution and capacity planning of global supply chains in the process industry[J]. Omega, 2013, 41(2): 369-382

    [16] Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineering procurement construction (EPC) projects[J]. International Journal of Project Management, 2002, 20: 253-262

    [17] Azambuja M M, O’Brien W J. Rapid assessment and selection of engineered equipment suppliers[J]. Automation in Construction, 2012, 22: 587-596

    [18] Lababidi H M S, Ahmed M, AlatiqiiM. Optimizing the supply chain of a petrochemical company under uncertain operating and economic conditions[J]. Ind Eng Chem Res, 2004, 43(1): 63-73

    [19] Gao N. The practice and enlightenment of material supply in oversea ethylene projects[J]. China Petroleum and Chemical Economy Analysis, 2013(6): 57-61 (in Chinese)

    [20] Wang Y. Petrochemical Procurement Management[M], Beijing: China Petrochemical Press, 2010: 158-168 (in Chinese)

    date: 2015-01-23; Accepted date: 2015-04-01.

    Dr. Gao Ning, Telephone: +86- 10-51586427; E-mail: gaoning.ccnh@sinopec.com.

    人妻少妇偷人精品九色| 特级一级黄色大片| 精品酒店卫生间| 高清午夜精品一区二区三区| 国产黄频视频在线观看| 亚州av有码| 熟女电影av网| 国内精品美女久久久久久| 日韩av不卡免费在线播放| www.色视频.com| a级毛片免费高清观看在线播放| 性插视频无遮挡在线免费观看| 国产精品一区www在线观看| 久久久久久久国产电影| 日韩国内少妇激情av| 成人亚洲精品一区在线观看 | 如何舔出高潮| 午夜视频国产福利| 色网站视频免费| 日本与韩国留学比较| 97超视频在线观看视频| 亚洲aⅴ乱码一区二区在线播放| 国产美女午夜福利| 久久久久久久大尺度免费视频| 亚洲av中文字字幕乱码综合| 人人妻人人澡人人爽人人夜夜| 久久久久久久久久久免费av| 免费黄频网站在线观看国产| 日本一本二区三区精品| 国产一区有黄有色的免费视频| 久久久久久久国产电影| 亚洲av不卡在线观看| 小蜜桃在线观看免费完整版高清| 日韩av在线免费看完整版不卡| 精品午夜福利在线看| 国模一区二区三区四区视频| 在线观看人妻少妇| 欧美xxⅹ黑人| 中国三级夫妇交换| 亚洲欧美清纯卡通| 久久久a久久爽久久v久久| 欧美最新免费一区二区三区| 美女国产视频在线观看| 最后的刺客免费高清国语| 内地一区二区视频在线| 亚洲一级一片aⅴ在线观看| 亚洲婷婷狠狠爱综合网| 男女那种视频在线观看| 美女脱内裤让男人舔精品视频| 又大又黄又爽视频免费| 久久午夜福利片| 国产久久久一区二区三区| 女人久久www免费人成看片| av国产免费在线观看| 在线观看美女被高潮喷水网站| 99热这里只有是精品在线观看| 18+在线观看网站| freevideosex欧美| 亚洲精品久久午夜乱码| 蜜桃亚洲精品一区二区三区| www.av在线官网国产| 3wmmmm亚洲av在线观看| 性插视频无遮挡在线免费观看| 高清毛片免费看| 成人免费观看视频高清| 七月丁香在线播放| 在线 av 中文字幕| 看黄色毛片网站| 日韩一本色道免费dvd| 国产亚洲午夜精品一区二区久久 | 亚洲第一区二区三区不卡| 久久国产乱子免费精品| 夫妻午夜视频| 精品酒店卫生间| 大香蕉久久网| 午夜福利在线观看免费完整高清在| 国产精品国产三级专区第一集| 免费观看a级毛片全部| 各种免费的搞黄视频| 99九九线精品视频在线观看视频| 嫩草影院入口| 亚洲精品第二区| 国产在线一区二区三区精| 欧美变态另类bdsm刘玥| 一个人看的www免费观看视频| 亚洲av国产av综合av卡| 久久久久久久久大av| 欧美一区二区亚洲| 日本欧美国产在线视频| 午夜精品国产一区二区电影 | 只有这里有精品99| 女人十人毛片免费观看3o分钟| 18禁动态无遮挡网站| 少妇高潮的动态图| 一本色道久久久久久精品综合| 禁无遮挡网站| 久热这里只有精品99| 亚洲精品视频女| 成人漫画全彩无遮挡| 国产一级毛片在线| 大陆偷拍与自拍| 爱豆传媒免费全集在线观看| 少妇熟女欧美另类| 欧美激情久久久久久爽电影| 国产精品国产三级国产av玫瑰| 禁无遮挡网站| 亚洲精华国产精华液的使用体验| 免费播放大片免费观看视频在线观看| 春色校园在线视频观看| 精品久久久久久久人妻蜜臀av| 免费看a级黄色片| 观看美女的网站| 精品99又大又爽又粗少妇毛片| 久久女婷五月综合色啪小说 | 亚洲av一区综合| 男人狂女人下面高潮的视频| 成人亚洲精品一区在线观看 | 中国国产av一级| 一级av片app| 黄色配什么色好看| 九九久久精品国产亚洲av麻豆| 18禁裸乳无遮挡免费网站照片| 中文字幕人妻熟人妻熟丝袜美| 成年女人看的毛片在线观看| 欧美少妇被猛烈插入视频| 久久99热6这里只有精品| 日韩,欧美,国产一区二区三区| 亚洲欧洲国产日韩| 成年人午夜在线观看视频| 欧美变态另类bdsm刘玥| 日韩精品有码人妻一区| 国产精品嫩草影院av在线观看| 99久久精品一区二区三区| freevideosex欧美| 欧美xxxx黑人xx丫x性爽| 国产成人a区在线观看| 国产永久视频网站| 观看美女的网站| av线在线观看网站| 亚洲精品aⅴ在线观看| 亚洲精品国产色婷婷电影| 晚上一个人看的免费电影| 国产精品一区二区在线观看99| 中国三级夫妇交换| 啦啦啦啦在线视频资源| 国产熟女欧美一区二区| 久久久久久久午夜电影| 成年av动漫网址| 欧美三级亚洲精品| 亚洲内射少妇av| 亚洲精品日本国产第一区| 日本一二三区视频观看| 久久久精品94久久精品| av国产精品久久久久影院| 2021少妇久久久久久久久久久| 简卡轻食公司| a级毛色黄片| 国产一区有黄有色的免费视频| 日韩国内少妇激情av| 亚洲av中文av极速乱| 亚洲av福利一区| 一区二区三区免费毛片| 晚上一个人看的免费电影| 国产又色又爽无遮挡免| 久久久久久九九精品二区国产| 我的女老师完整版在线观看| 男男h啪啪无遮挡| 秋霞在线观看毛片| 男女无遮挡免费网站观看| 一个人看的www免费观看视频| 亚洲av中文av极速乱| 偷拍熟女少妇极品色| 久久久久久久国产电影| 免费观看在线日韩| 久久97久久精品| 蜜桃亚洲精品一区二区三区| 亚洲电影在线观看av| 国产国拍精品亚洲av在线观看| 日本黄色片子视频| 在线天堂最新版资源| 综合色av麻豆| 九九爱精品视频在线观看| av在线蜜桃| 日韩成人av中文字幕在线观看| 国产综合懂色| 亚洲精品日韩av片在线观看| 麻豆成人午夜福利视频| 亚洲经典国产精华液单| 日韩强制内射视频| 老师上课跳d突然被开到最大视频| 22中文网久久字幕| 大片免费播放器 马上看| 久久这里有精品视频免费| 少妇被粗大猛烈的视频| 中文乱码字字幕精品一区二区三区| 欧美人与善性xxx| 国产成人91sexporn| 欧美xxxx性猛交bbbb| 久久久久国产网址| a级毛片免费高清观看在线播放| 熟妇人妻不卡中文字幕| av在线观看视频网站免费| 嫩草影院入口| 久久久久久久久久成人| 一边亲一边摸免费视频| 丝瓜视频免费看黄片| 亚洲av欧美aⅴ国产| 久久97久久精品| 国产淫语在线视频| 26uuu在线亚洲综合色| 老司机影院成人| 日韩国内少妇激情av| 欧美精品国产亚洲| 亚洲av在线观看美女高潮| 成人毛片a级毛片在线播放| 最近中文字幕高清免费大全6| 中文在线观看免费www的网站| 一区二区三区精品91| av国产久精品久网站免费入址| 国产精品人妻久久久久久| 亚洲伊人久久精品综合| 亚洲成人一二三区av| 身体一侧抽搐| 91精品伊人久久大香线蕉| 少妇的逼水好多| 亚洲av成人精品一二三区| 亚洲成人久久爱视频| 亚洲经典国产精华液单| 我要看日韩黄色一级片| 在线观看人妻少妇| 少妇人妻 视频| 久久人人爽人人片av| 在线a可以看的网站| 欧美性猛交╳xxx乱大交人| 又黄又爽又刺激的免费视频.| 国产精品成人在线| 精品人妻熟女av久视频| 日本免费在线观看一区| 在线观看免费高清a一片| 国产又色又爽无遮挡免| 一边亲一边摸免费视频| av在线老鸭窝| 欧美bdsm另类| 国产中年淑女户外野战色| 99精国产麻豆久久婷婷| 久久影院123| 亚洲av成人精品一区久久| 精品久久久久久久久亚洲| 亚洲国产精品成人久久小说| 夫妻性生交免费视频一级片| 久久精品久久精品一区二区三区| 人妻 亚洲 视频| 七月丁香在线播放| 丝瓜视频免费看黄片| 2021天堂中文幕一二区在线观| 亚洲欧美清纯卡通| 欧美最新免费一区二区三区| 日日摸夜夜添夜夜爱| 免费av观看视频| 免费不卡的大黄色大毛片视频在线观看| 干丝袜人妻中文字幕| 1000部很黄的大片| 99久国产av精品国产电影| 伊人久久精品亚洲午夜| 在线观看国产h片| 国产色婷婷99| 亚州av有码| 国产爽快片一区二区三区| freevideosex欧美| 狂野欧美白嫩少妇大欣赏| 十八禁网站网址无遮挡 | 国产成人一区二区在线| 国产高潮美女av| 免费观看a级毛片全部| 少妇猛男粗大的猛烈进出视频 | 少妇人妻久久综合中文| 一级毛片久久久久久久久女| 亚洲人成网站高清观看| 久久99精品国语久久久| 免费观看性生交大片5| 国产成人精品一,二区| 纵有疾风起免费观看全集完整版| 午夜免费鲁丝| 99热这里只有是精品50| 国产精品福利在线免费观看| 亚洲精品影视一区二区三区av| 老师上课跳d突然被开到最大视频| 22中文网久久字幕| 国产精品久久久久久精品电影| 男人爽女人下面视频在线观看| 国产毛片在线视频| 五月伊人婷婷丁香| 在线观看美女被高潮喷水网站| 又爽又黄a免费视频| 色综合色国产| 日韩av不卡免费在线播放| av在线播放精品| 亚洲av中文字字幕乱码综合| 亚洲电影在线观看av| 2018国产大陆天天弄谢| 国产精品一二三区在线看| 五月开心婷婷网| 国产av不卡久久| 香蕉精品网在线| 熟女电影av网| 国产精品精品国产色婷婷| 国产在线一区二区三区精| 寂寞人妻少妇视频99o| 一级毛片电影观看| 国产亚洲一区二区精品| 在线a可以看的网站| 最近最新中文字幕免费大全7| 一二三四中文在线观看免费高清| 久久久久性生活片| 欧美一级a爱片免费观看看| 我的老师免费观看完整版| 国产一区二区三区av在线| 久久影院123| 久久精品国产亚洲网站| 赤兔流量卡办理| 国产乱人视频| 综合色av麻豆| 成人国产麻豆网| 亚洲婷婷狠狠爱综合网| 夜夜爽夜夜爽视频| 美女脱内裤让男人舔精品视频| av免费观看日本| 校园人妻丝袜中文字幕| 性色av一级| 国产午夜精品一二区理论片| 男的添女的下面高潮视频| 国国产精品蜜臀av免费| 日本黄色片子视频| 波野结衣二区三区在线| 少妇人妻久久综合中文| 99久久精品国产国产毛片| 成人欧美大片| 久久精品国产自在天天线| av女优亚洲男人天堂| 精品酒店卫生间| 欧美少妇被猛烈插入视频| 中文字幕制服av| 亚洲欧美精品自产自拍| 青春草亚洲视频在线观看| 99久久人妻综合| 国产免费一级a男人的天堂| 成人特级av手机在线观看| 亚洲精品国产av蜜桃| 日本黄大片高清| 国产精品精品国产色婷婷| 精品人妻一区二区三区麻豆| 亚洲av国产av综合av卡| 91久久精品国产一区二区成人| 久久久久久久亚洲中文字幕| 街头女战士在线观看网站| 免费观看的影片在线观看| 日韩国内少妇激情av| 国产一区亚洲一区在线观看| 国产乱来视频区| 免费观看av网站的网址| 在线观看美女被高潮喷水网站| 国产精品麻豆人妻色哟哟久久| 国产精品偷伦视频观看了| 免费观看的影片在线观看| 极品少妇高潮喷水抽搐| 自拍偷自拍亚洲精品老妇| 2021少妇久久久久久久久久久| 欧美人与善性xxx| 国产精品人妻久久久影院| 18禁动态无遮挡网站| 大话2 男鬼变身卡| 欧美另类一区| 久久精品国产亚洲av天美| 亚洲精品乱码久久久久久按摩| 王馨瑶露胸无遮挡在线观看| 国产又色又爽无遮挡免| 我的女老师完整版在线观看| 干丝袜人妻中文字幕| 1000部很黄的大片| 91久久精品国产一区二区成人| 80岁老熟妇乱子伦牲交| 精品久久久久久电影网| 99热6这里只有精品| 国产熟女欧美一区二区| 观看美女的网站| 可以在线观看毛片的网站| 亚洲欧洲国产日韩| 一级黄片播放器| 免费观看av网站的网址| 在线免费十八禁| 欧美精品一区二区大全| 在线免费观看不下载黄p国产| 男女边摸边吃奶| 麻豆精品久久久久久蜜桃| 国产黄频视频在线观看| 午夜精品国产一区二区电影 | 丰满乱子伦码专区| 高清在线视频一区二区三区| 黄片无遮挡物在线观看| 热99国产精品久久久久久7| 99re6热这里在线精品视频| 97超视频在线观看视频| 少妇熟女欧美另类| h日本视频在线播放| 国产视频首页在线观看| 国产乱人偷精品视频| 精品人妻视频免费看| 亚洲国产精品成人久久小说| 国产欧美亚洲国产| 欧美少妇被猛烈插入视频| 乱码一卡2卡4卡精品| 精品人妻视频免费看| 午夜福利视频1000在线观看| 岛国毛片在线播放| 国产精品精品国产色婷婷| 成人综合一区亚洲| 精品一区二区免费观看| 欧美3d第一页| 午夜日本视频在线| 99久久精品国产国产毛片| 国产成人精品久久久久久| 男人爽女人下面视频在线观看| 日韩av在线免费看完整版不卡| 日本黄色片子视频| 日韩不卡一区二区三区视频在线| 99热这里只有是精品50| 国产精品爽爽va在线观看网站| 日日摸夜夜添夜夜添av毛片| 黄色怎么调成土黄色| 国产白丝娇喘喷水9色精品| 亚洲va在线va天堂va国产| 永久网站在线| 少妇 在线观看| 2021天堂中文幕一二区在线观| 欧美成人精品欧美一级黄| 又大又黄又爽视频免费| 久久久久久久亚洲中文字幕| 激情五月婷婷亚洲| 九草在线视频观看| 春色校园在线视频观看| 亚洲精品日韩在线中文字幕| 久久精品久久久久久久性| 欧美日韩精品成人综合77777| 久久精品国产鲁丝片午夜精品| 黑人高潮一二区| 成年女人在线观看亚洲视频 | 亚洲av成人精品一区久久| 亚洲精品aⅴ在线观看| 免费看a级黄色片| 国语对白做爰xxxⅹ性视频网站| 亚洲天堂国产精品一区在线| av线在线观看网站| 国产精品福利在线免费观看| 日韩 亚洲 欧美在线| 永久网站在线| 成人无遮挡网站| 亚洲成人av在线免费| 色播亚洲综合网| 99re6热这里在线精品视频| 精品久久国产蜜桃| 老师上课跳d突然被开到最大视频| 精品国产乱码久久久久久小说| 国产精品国产三级国产专区5o| 22中文网久久字幕| 色婷婷久久久亚洲欧美| 一级毛片黄色毛片免费观看视频| 国产精品久久久久久av不卡| 亚洲最大成人中文| 久久综合国产亚洲精品| 欧美高清成人免费视频www| 国产精品人妻久久久影院| 国产日韩欧美亚洲二区| 日本wwww免费看| 亚洲精品国产av蜜桃| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 免费观看在线日韩| 国产成人91sexporn| 男女无遮挡免费网站观看| 久久综合国产亚洲精品| 精品国产一区二区三区久久久樱花 | 亚洲av一区综合| 国产男女超爽视频在线观看| 麻豆成人午夜福利视频| 国产真实伦视频高清在线观看| 精品亚洲乱码少妇综合久久| 一级毛片电影观看| 国产白丝娇喘喷水9色精品| 日韩亚洲欧美综合| 久久99蜜桃精品久久| 亚洲精品一区蜜桃| 亚洲国产欧美人成| 国产精品.久久久| 国产精品嫩草影院av在线观看| 2021天堂中文幕一二区在线观| 亚洲图色成人| a级毛片免费高清观看在线播放| www.av在线官网国产| 99久国产av精品国产电影| 一区二区三区精品91| 亚洲精品一区蜜桃| 91久久精品国产一区二区三区| 五月开心婷婷网| 国产片特级美女逼逼视频| 欧美日韩视频精品一区| 一级爰片在线观看| 少妇裸体淫交视频免费看高清| 大陆偷拍与自拍| 免费黄色在线免费观看| 精品国产三级普通话版| 99久久精品一区二区三区| 国精品久久久久久国模美| 夫妻性生交免费视频一级片| 狂野欧美激情性bbbbbb| 少妇人妻 视频| 可以在线观看毛片的网站| 国产av国产精品国产| 麻豆久久精品国产亚洲av| 日本黄色片子视频| 免费不卡的大黄色大毛片视频在线观看| 欧美老熟妇乱子伦牲交| 日韩欧美精品免费久久| 亚洲精品久久久久久婷婷小说| 亚洲精品国产av蜜桃| 2018国产大陆天天弄谢| 精品酒店卫生间| 下体分泌物呈黄色| 亚洲av成人精品一二三区| 成人午夜精彩视频在线观看| 嫩草影院入口| 汤姆久久久久久久影院中文字幕| 97在线人人人人妻| 欧美性猛交╳xxx乱大交人| 人体艺术视频欧美日本| 性色av一级| 黑人高潮一二区| 国产探花极品一区二区| 一本一本综合久久| 少妇被粗大猛烈的视频| 日韩一区二区视频免费看| 久久韩国三级中文字幕| 男女边摸边吃奶| 久久精品国产鲁丝片午夜精品| 日韩强制内射视频| 精品国产露脸久久av麻豆| 久久99热6这里只有精品| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 亚洲精品乱久久久久久| av在线亚洲专区| 99久久精品国产国产毛片| 国产 一区精品| 青春草视频在线免费观看| 免费观看无遮挡的男女| 日韩av不卡免费在线播放| 亚洲不卡免费看| 狂野欧美激情性xxxx在线观看| 国产老妇女一区| 国产69精品久久久久777片| 各种免费的搞黄视频| 天天一区二区日本电影三级| 国产人妻一区二区三区在| 国内揄拍国产精品人妻在线| 久久久欧美国产精品| 亚洲va在线va天堂va国产| 亚洲自拍偷在线| 成人综合一区亚洲| 午夜福利视频精品| 男女边摸边吃奶| 乱码一卡2卡4卡精品| 综合色丁香网| 日韩欧美 国产精品| 丝瓜视频免费看黄片| 久久影院123| 亚洲欧美一区二区三区黑人 | 免费看av在线观看网站| 久久人人爽人人爽人人片va| 国产黄片美女视频| 麻豆精品久久久久久蜜桃| 日韩三级伦理在线观看| 黄色一级大片看看| 亚洲精品成人av观看孕妇| 97超视频在线观看视频| av在线亚洲专区| 亚洲高清免费不卡视频| 在线看a的网站| 99热全是精品| 男女那种视频在线观看| 深夜a级毛片| 别揉我奶头 嗯啊视频| 日韩大片免费观看网站| 亚洲丝袜综合中文字幕| 深爱激情五月婷婷| 不卡视频在线观看欧美| 久久久久久久精品精品| 99精国产麻豆久久婷婷| 狂野欧美白嫩少妇大欣赏| 日韩伦理黄色片| 国产探花在线观看一区二区| 少妇裸体淫交视频免费看高清| 国产高清不卡午夜福利| 午夜爱爱视频在线播放| eeuss影院久久| 联通29元200g的流量卡| av国产精品久久久久影院| 精品熟女少妇av免费看| 国产成人aa在线观看| 又大又黄又爽视频免费| 男人添女人高潮全过程视频| 日本av手机在线免费观看| 亚洲电影在线观看av| 久久99热6这里只有精品| 美女国产视频在线观看| 国产午夜精品一二区理论片| 在线观看免费高清a一片| 在线观看av片永久免费下载| 中文字幕免费在线视频6|